LCLS Control Group FAC – 06 Installation October 27/28, 2005 1 Plans for 2006 Installation October 27, 2005 Installation.

Slides:



Advertisements
Similar presentations
Stephanie Allison LCLS Event System 14 June LCLS Event System Outline HW Block Diagram Timing Requirements Time Lines EVG.
Advertisements

Dayle Kotturi and Stephanie Allison Facility Advisory Committee Meeting April 20-21,
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
Stephanie Allison Integration with the SLC Control April 7, 2005 Introduction PNET Receiver VME Module SLC-Aware IOC Existing.
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
Patrick Krejcik LCLS April 16-17, 2007 Breakout Session: Controls Controls Commissioning Experience.
Ernest L. Williams Jr. Controls Commissioning October 2007 Controls Commissioning Facility Advisory Committee.
Hamid Shoaee High Level Physics 20 April 2006 High Level Physics Applications Update on Plans, New Directions Fairley,
Online Data Analysis and Simulation Sven Reiche UCLA - 09/22/04 Sven Reiche UCLA - 09/22/04.
LCLS Control Group FAC - Controls October 27&28, Controls Overview October 27, 2005 Outline ES&H Goals Commissioning.
Diane Fairley High Level October 24-28, 2005 High Level Physics Applications LCLS Week / FAC October 24-28, 2005.
Dayle Kotturi Controls April 29, 2004 Controls Overview LCLS Facility Advisory Committee April 29-30, 2004 Outline Status.
Dayle Kotturi LCLS Diagnostics and Commissioning Workshop September 23, 2004 LCLS Controls and Data Acquisition September 23, 2004.
Dayle Kotturi Controls April 29, 2004 Injector Controls LCLS Facility Advisory Committee April 29-30, 2004 Outline Description.
Stephanie Allison Integration with the SLC Control Oct 27, Introduction Demo SLC-Aware IOC Plans for Next 12 Months.
LCLS Control Group FAC - Controls April 7, 2005 Controls Overview April 7, 2005 Outline ES&H Goals FAC Responses.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
Eric Bong LCLS FAC Injector-Linac System October 27, 2005 Injector –Linac System Overview E. Bong LCLS FAC October 27, 2005.
Dayle Kotturi Facility Advisory Committee Meeting October 12, 2004 Injector/Linac Controls An overview of the status of each of.
Dayle Kotturi SLC April 29, 2004 Outline Motivation Key Components Status Update SLC / EPICS Timing Software Tasks Hardware.
Hamid Shoaee LCLS FAC Review – October Control System Overview Hamid Shoaee Controls System Manager Injector control system commissioning & Support.
Paul Emma Injector/BC1 Commissioning April 20, Injector/BC1 Commissioning (Dec. 1, ’06 through Aug. 1, ‘07) P. Emma LCLS.
November 12, 2008 Controls Software D. Fairley LCLS Feedback.
Oct. 30, 2007 LCLS FAC D. Fairley MATLAB Feedback Phase II Commissioning.
Henrik Loos High Level 17 June 2008 High Level Physics Applications for LCLS Commissioning Henrik Loos.
Diane Fairley High Level October High Level Applications FAC Review October 12, 2006 High Level Applications.
Hamid Shoaee LCLS Control April 20, 2006 LCLS Control System Organization & Integration with the rest of the lab, Accelerator.
Patrick Krejcik LCLS November 11-12, 2008 SLAC National Accelerator Laboratory 1 Post-commissioning Controls Enhancements.
Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Controls Department LCLS Maintenance.
Hamid Shoaee LCLS Control April 20, 2006 LCLS Control System Controls Organization Overview A Progress Report Hamid Shoaee.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
Stephen Schuh Vacuum Controls SCR and 16 November 2005 Vacuum Controls System Concept Review and Preliminary Design Review.
K. Luchini LCLS Week, October 26, 2005 Magnet Controls K. Luchini Overview Hardware Software SLC Aware IOC Database Modeling.
Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 LLRF Outline System Concept Review Requirements.
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
LCLS Control Group EPICS Collaboration April 27, 2005 Controls Overview April 27, 2005 Outline Goals Status update.
Laser Heater Controls Overview 21 August 2008 Matt Boyes Laser Heater Controls Design Overview EPICS IOC Team Meeting Matt Boyes.
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
Stephanie Allison SLC-Aware April 5, 2005 Introduction Description Issues Progress Plans for 2005 SLC-Aware IOC LCLS Collaboration,
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
Patrick’s Updates - 8/30/11 (one slide for each of the following) 1.XTCAV Project 2.ASTA Gun Test Facility Instrumentation & Controls 3.Fast wire scanner.
Debbie Rogind LCLS Magnet June 15, 2006 LCLS Magnet Control Challenging Design Issues “How to integrate the legacy system.
Debbie Rogind LCLS Magnet June 15, 2006 LCLS Magnet Control Challenging Design Issues Subsystem architecture, or… “How.
LCLS Commissioning & Operations High Level Software
SLC-Aware IOC LCLS Collaboration Jan 26, 2005
LLRF and feedback Outline Scope LLRF Requirements
LCLS Commissioning & Operations High Level Software
Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006
Injector/BC1 Commissioning (Jan. 2, 2007 through Aug. 31, 2007) P
Undulator Vacuum System
Advanced Research Electron Accelerator Laboratory
Linac/BC1 Commissioning P
Magnet Controls K. Luchini
LCLS Commissioning P. Emma, et al
High Level Physics Applications for LCLS Commissioning
Undulator Vacuum System
LCLS Control System Design, Management & Organization August 10, 2004
Diagnostics RF and Feedback
Linac Diagnostics Commissioning Experience
Control System Overview Hamid Shoaee LCLS Control System Manager
LCLS Global Controls Overview August 10, 2004
Controls Overview B. Dalesio
Injector/BC1 Commissioning (Jan through Aug. 2007) P. Emma, et al
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Controls Overview B. Dalesio
LCLS Control System Personnel Linac & BC2 Controls progress
Injector Physics C.Limborg-Deprey Feb.8th 2006
Control System Overview Hamid Shoaee LCLS Control System Manager
High Level Physics Applications Lehman Review February 7 - 9, 2006
Presentation transcript:

LCLS Control Group FAC – 06 Installation October 27/28, Plans for 2006 Installation October 27, 2005 Installation Schedule Laser Installation Injector, BC1/L1, Injector Spectrometer Installation Risks Conculsions

LCLS Control Group FAC – 06 Installation October 27/28, LCLS Installation Schedule Laser Commissioning May 31, 2006 Injector Commissioning Nov 2, 2006 BC1 / L1 Commissioning Nov 2, 2006 Inj Spectro. Commissioning Nov 2, 2006 L2 / BC2 / L3 Commissioning Oct 31, 2007 LTU Commissioning Jan 31, 2008 E Dump Commissioning Jan 31, 2008 Laser Heater to be commissioned with Undulator

LCLS Control Group FAC – 06 Installation October 27/28, Laser Cable Plant / Rack Installation Cable plant information received Mario 11/30/2005 Bid package completed Mario 12/16/2005 Award Bid Mario 03/31/2006 Start CablingMario 04/17/2006 Input from Subsystems Infrastructure info. Complete Doug11/15/2005 Laser Control info. Complete Sheng11/15/2005

LCLS Control Group FAC – 06 Installation October 27/28, Laser Controls Laser Safety – Patrick Bong Complete Design Review Order all PLCs and instrumentation Complete PLC Programming Complete EPICS Driver for the PLC Complete control database Complete displays Timing – Dayle Kotturi Design Review Complete driver Order EVG200 and EVR 200 Complete control database Complete displays Infrastructure – Doug Murray Network Servers and workstations

LCLS Control Group FAC – 06 Installation October 27/28, Laser Controls Motion Control – Sheng Peng Design Review Complete drivers Order all motor controllers Complete control database Complete displays Profile Monitor – Sheng Peng Design Review Complete drivers Order all cameras and camera controls Complete control database Complete displays

LCLS Control Group FAC – 06 Installation October 27/28, Injector, BC1/L1, Inj. Spectrometer Cable Plant / Rack Installation Cable plant information received Mario 03/31/2006 Bid package completed Mario 04/16/2006 Award BidMario 07/31/2006 Start CablingMario 08/16/2006 Input from Subsystems Infrastructure info. Complete Doug 03/15/2006 Temperature Control Stephen S. 03/15/2006 DiagnosticsSheng,Doug,Till 03/15/2006 TimingDayle 03/15/2006 Low Level RFDayle 03/15/2006 Vacuum ControlStephen S 02/15/2006 Power Supply ControlKristi01/15/2006 Personnel Protection Patrick B01/15/2006 Machine ProtectionStephen N 03/15/2006 Fast FeedbackStephanie 03/15/2006

LCLS Control Group FAC – 06 Installation October 27/28, Injector, L1, and BC1 Personnel Safety – Patrick Bong Use the existing PPS for the LINAC during this phase – new system needed for Injector Complete Design Review Order all PLCs and instrumentation Complete PLC Programming Complete EPICS Driver for the PLC Complete control database Complete displays Timing – Dayle Kotturi Design Review Complete driver Order EVR 200s Complete control database Complete displays Infrastructure – Doug Murray Network Servers and workstations

LCLS Control Group FAC – 06 Installation October 27/28, Injector, L1, and BC1 Diagnostics Toroids ( 2,3,0) Sheng Peng Profile Monitors(10,3,0) Sheng Peng Wire Scanners( 4,3,0) Doug Murray Beam Position Monitors(15,7,0) Till Strauman, Michael Cecere Bunch Length Monitors( 2,1,0) Sheng Peng Tasks Design Review for each of the diagnostics Complete drivers for all hardware interfaces Complete prototypes for each (Profile monitors are done) Order all diagnostic hardware Complete control database Complete displays

LCLS Control Group FAC – 06 Installation October 27/28, Injector, L1, and BC1 LLRF (4,2,0) Dayle Kotturi Complete prototype of embedded processor solution Complete Design Review Complete driver Order all processors Complete control database Complete displays Timing – (x,x,x) Dayle Kotturi Design Review Complete driver Order EVR 200s Complete control database Complete displays

LCLS Control Group FAC – 06 Installation October 27/28, Injector, L1, and BC1 Vacuum Control - Stephen Schuh and Tom Porter Ion Pump 40 I/s(25,0,0) Ion Pump 20 I/s(20,10,0) Ion Pump 8 I/s(0,3,0) Ion Pump 2 I/s(0,1,0) Cold Cathode Gauge(9,2,0) Pirani Gauge(9,2,0) Hot Filament Gauge(2,0,0) Convectron Gauge(2,0,0) F Gate Valve – not controlled (0,2,0) Gate Valve (Large Bore)(1,0,0) Gate Valve (Small Bore)(4,0,0) Roughing Valve – not controlled (5,2,0) Tasks Complete Design Review Complete valve controller prototype Order all PLC hardware, IOC, pump controllers, and gauge controllers. Build all valve controllers Complete control database Complete displays

LCLS Control Group FAC – 06 Installation October 27/28, Injector, L1, and BC1 Power Supply Control – Kristi Luchini, Paul Bellermo, Anthony DeLira, Dave MacNair Solenoid (03,0,0) Bends (29,4,0) X Corrector (11,9,2) Y Corrector (11,5,2) Quadrapoles (14,10,2) Tasks External Design Review Complete micro controller to replace the ethernet controller Complete VME prototype for power supply control Order all I/O All power supplies are ordered Build all power supply controllers Complete control database Complete displays

LCLS Control Group FAC – 06 Installation October 27/28, Injector, L1, and BC1 Machine Protection / Beam Containment System – Stephen Norum Determine a solution for this run – only a laser shutter to control Complete prototype of embedded processor solution Complete Design Review Complete driver Order all processors Complete control database Complete displays Fast Feedback - Stephanie Allison Determine a solution for this run – limited beam rate and number of loops Complete prototype Complete Design Review Complete driver Complete control database Complete displays

LCLS Control Group FAC – 06 Installation October 27/28, Injector, L1, and BC1 High Level Applications – Diane Fairley, Debbie Rogind, Sergei Chevstov OTR converting OTR and YAG x-y images to rms sizes, centroids, area-under-curve, etc. I think we want several different methods available: Gaussian fitting, asymmetric Gaussian fitting, rms calculations using baseline cuts, rms calculations using filtering, etc. Power steering of sections of beamline, including corrector strength and BPM weighting (available on SLC now, but questionable state Emittance measurements using several (3-4) OTRs, and/or using one OTR but many quad settings (quad-scan method). Many parameters extractable WITH error bars. SLC only handles wire scanners right now. Real-time difference orbit fitting by accessing the optical on-line model (e.g., DIMAD, MAD, or COMFORT) and extracting initial position, angle, and energy from N BPM readings (plus a possible kick source in the region as an option) - all is available now on SLC Transverse slice emittance measurements: This is almost free if the software is written properly. We simply do the same as emittance measurements, but first slice up the beam (e.g., in Y) on the OTR screen and extract (e.g., in X) the rms for each slice, feeding this into the nominal emittance fitting subroutines, then plotting emittance vs. slice number (and several other accessible parameters). This is NOT available on SLC now, but I (and others) have MATLAB code to do it, though it is not packaged conveniently or easy to use for others.

LCLS Control Group FAC – 06 Installation October 27/28, Risk Areas SLC-aware IOC is complete Timing integration and prototype is close BPM design is unclear – ESD prototype ready for test PPS PLC approach needs approval Use of micro controllers requires the quick selection of a platform and port of RTEMS support Use of existing LINAC equipment may limit operation and reliability Budget estimates need to be verified – limited contingency

LCLS Control Group FAC – 06 Installation October 27/28, Conclusions We understand the scope of the work for 06 commissioning. The team is in place to achieve these goals. The largest risks are well in hand. There are several risks identified that need to be monitored. There is a lot of work to be completed this year.