UN/CEFACT XML Schema Status and Data Exchange Requirement Guidelines Joan Ugljesa NDIA PMSC January 29, 2009 949-722-7659.

Slides:



Advertisements
Similar presentations
Presented By: DCMA John Van Dinther Chris Hassler UN/CEFACT Plenary September 2008 Introduction to EVGen3: 3 rd Generation Earned Value Data Reporting.
Advertisements

Transformations at GPO: An Update on the Government Printing Office's Future Digital System George Barnum Coalition for Networked Information December.
Page 1 National Defense Industrial Association (NDIA) Program Management Systems Committee (PMSC). NDIA Earned Value Management Systems Intent Guide Overview.
0-1 Team ?? Status Report (1 of 3) Client Contact –Point 1 –Point 2 Team Meetings –Point 1 –Point 2 Team Organization –Point 1 –Point 2 Team 1: Auraria.
Various other updates Presented by: Karen S Ginsbury March
MAHI Research Database Project Status Report August 9, 2001.
XML Working Group Joan Ugljesa NDIA PMSC January 31,
1 Department of Defense Earned Value Central Repository Debbie Tomsic, OUSD(AT&L) John McGahan, Tecolote October 31, 2007.
Coordination with MARSS Student Number Fall 2013.
Presented By: Chris Hassler Project Editor – UN/CEFACT TBG6 Team for Project Cost and Schedule Management Feb 2006 UN/CEFACT TBG6 Team for Project Cost.
SWIS Digital Inspections Project (SWIS DIP) Chris Allen, Information Management Branch California Integrated Waste Management Board November 5, 2008 The.
Software Engineering Modern Approaches
Copyright © 2009 NDIA PMSC Robert Loop August 2009 NDIA PMSC Guides Working Group Status.
SharePoint 2010 & UNTHSC Policies September, 2013.
XML Working Group Joan Ugljesa NDIA PMSC August 15,
UNCLASSIFIED DoD COST REPORTING OVERVIEW CSDR & EVM-CR 1.
XML Working Group Joan Ugljesa NDIA PMSC April,
Earned Value Management Systems (EVMS) Defense Support Team (DST) and Report to Congress Mr. Richard Ginman OUSD(A&T)/DPAP Presentation to National Defense.
PSCIOC XML Subcommittee Status Update — September 27, 2004 Dave Wallace (Chair) Corporate Chief Technology Officer Management Board Secretariat Ontario.
Development of metadata in the National Statistical Institute of Spain Work Session on Statistical Metadata Genève, 6-8 May-2013 Ana Isabel Sánchez-Luengo.
SWIS Digital Inspections Project Update (SWIS DIP) Chris Allen, Information Management Branch California Integrated Waste Management Board August 31, 2009.
XML Working Group Joan Ugljesa NDIA PMSC February 8, February 4, 2005.
Applied Technologies Group Report Chair: Mark Crawford Vice Chair: Jostein Frømyr Vice Chair: Gait Boxman.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
1 10/14/2015ã 2007, Spencer Rugaber The Waterfall Process Software plans and requirements Validation System feasibility Validation Product design Verification.
Project Scope Management Project management Digital Media Department Unit Credit Value : 4 Essential Learning time : 120 hours.
Mike Augustus A DCARC Update Jan ● (703) ●
XML Working Group Joan Ugljesa NDIA PMSC April 25,
United Nations CEFACT and Earned Value Generation 3 The Gold Standard for Project Management and Reporting Published March 25, 2008.
UN/CEFACT XML Schema Status and Data Exchange Requirement Guidelines Joan Ugljesa NDIA PMSC August 26, 2010.
XML Working Group Joan Ugljesa NDIA PMSC August 24,
Earned Value Management Update Nancy L. Spruill Director, Acquisition Resources and Analysis Office of the Under Secretary of Defense (Acquisition, Technology.
U.S. Department of Agriculture eGovernment Program eGovernment Working Group Meeting February 11, 2004.
0 Office of Performance Assessments and Root Cause Analyses (PARCA) PARCA EVM Update Presenter: Phone:
XML Working Group Joan Ugljesa NDIA PMSC May 3,
Learning Objects Metadata IEEE P Learning Technology Standards Committee London, UK March 16, 2000 Chair: Wayne Hodgins.
XML Working Group Joan Ugljesa NDIA PMSC August 7,
Cost and Schedule Standard Status and Direction John Van Dinther
U NITED N ATIONS C ENTRE F OR T RADE F ACILITATION A ND E LECTRONIC B USINESS Under the auspices of United Nations Economic Commission for Europe UN/CEFACT.
EPA’s Water Quality Exchange (WQX) National Water Quality Monitoring Conference San Jose, California Kristen Gunthardt, US EPA Curtis Cude, OR DEQ.
UPDATING RIGHT OF WAY MANUALS FLORIDA’S PROCEDURES.
UN Economic Commission for Europe 18 th UN/CEFACT PLENARY Methodology & Technology Programme Development Area Report Peter Amstutz & Tim McGrath UN/CEFACT.
Practice Standard for Scheduling Project Manager’s Meeting Status April 28, 2004 Project Manager – Douglas Clark, CEO of Métier.
SWIS Digital Inspections Project Chris Allen, Information Management Branch California Integrated Waste Management Board August 22, 2008.
11 April, 2008 Bernard Longhi / TBG6 / TBG6 (AEC Gp) Architecture – Engineering - Construction Chair: Bernard Longhi.
Earned Value Management Update Nancy L. Spruill Director, Acquisition Resources and Analysis Office of the Under Secretary of Defense (Acquisition, Technology.
1 Program Management Systems Committee (PMSC) Contract / Subcontract Issues Working Group Industry Issues and Position Summary 13 August 2008.
NASA Update NDIA PMSC Quarterly Meeting August 26, 2010 NDIA PMSC Quarterly Meeting August 26, 2010 Ken Poole NASA/MSFC/CS40 (Project Planning & Analysis.
For Official Use Only – Pre-Decisional Improving Acquisition Execution Situational Awareness: Central Repository Pilot Status Report Debbie Tomsic (AT&L/ARA)
NDIA PMCS May Rosslyn, VA Earned Value Management System Acceptance Working Group Buddy Everage Working Group Lead.
Chapter 8 Final Construction Final construction in the SDLC Construct and test programs Construct and test the database Obtain additional hardware Prepare.
HySafe Coordination Committee Meeting no. 8, December 13, 2005, INASMET San Sebastian Status of WP5- The Hydrogen Incident and Accident Database Update.
SunGuide SM Software Development Project End of the Year ITS Working Group Meeting December 7, 2005.
2010 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved.. Mary Ann Hale NDIA PMSC.
Copyright © 2002 Open Applications Group, Inc. All rights reserved Open Applications Group Core Components WG Overview January 30, 2003.
Presented by: Presented By: MIL-STD 881 Update: NDIA PMSC Meeting Neil F. Albert MCR, LLC 4 February 2010.
Strength through Industry & Technology How is the Government Managing for Value? Program Management Systems Committee March 11, 2007 The Voice of the Industrial.
EPA’s Water Quality Exchange (WQX) Annual Exchange Network Users’ Meeting April 18-19, 2006.
NDIA - ICPM Program Planning and Scheduling Subcommittee Program Planning and Scheduling Subcommittee (PPSS) Initiative Presented by: Ms Lil Vayhinger.
PDS4 Project Report PDS MC F2F University of Maryland Dan Crichton March 27,
Doc.: IEEE /1515r0 AgendaStephen McCann, BlackBerrySlide 1 TGaq Agenda Date: Authors: January 2016.
Maintenance Ticketing Gateway (MTG) CEMR/MEDIACC Replacement
Joan Ugljesa NDIA PMSC August 15, 2006
Fast Track Maintenance Process (for existing messages)
Department of Defense Earned Value Central Repository Debbie Tomsic, OUSD(AT&L) John McGahan, Tecolote October 31, 2007.
NDIA Earned Value Management Application Guide
NDIA PMSC Guides Working Group
ISA-SP88 Update: Batch Control and Beyond
NDIA Intent Guide Update for EVMIG.
Joan Ugljesa NDIA PMSC May 4, 2005
Presentation transcript:

UN/CEFACT XML Schema Status and Data Exchange Requirement Guidelines Joan Ugljesa NDIA PMSC January 29,

January Current Events Joint Industry/Government Data Exchange Requirement Guidelines for the UN/CEFACT XML Schemas Goal: Clearly articulate specific data content requirements Software vendors can use to produce acceptable instance documents – actively working with software vendors to support XML import/export Foundation to do validation check – verify an instance document complies with requirements Support Central Repository end users as well as industry (prime and subcontractor data exchange) Guidelines in process/planned Network schedule CPR Considering time phased cost data (history or otherwise), WBS CFSR 1921 series of reports Host web site: Working in concert with OSD on DID updates, data integrity issues

January Preliminary Process and Timetable Final draft guidelines for IMS and CPR DIDs available for public comment March 31, 2009 Draft network schedule available now Submit data maintenance items to UN/CEFACT (published in D09B data library) March 31, 2009 Final CFSR draft guidelines available for public commentApril 30, 2009 Conduct pilot using guidelines, update guidelines as needed TBD Validation schemas generatedTBD Submit guidelines to OSD/Industry (NDIA) for review and approval TBD CR Manual updated to reflect move to UN/CEFACT XML schemas TBD Updated DIDs approved/published that reflect UN/CEFACT XML schemas (guidelines updated as needed) TBD Policy issued regarding CR and use of the UN/CEFACT XML schemas TBD Contract CDRLs updated to reflect policyTBD

January Points of Contact DCMA John Van Dinther, schema development sponsor also spearheading software vendor support Chris Hassler, Schema Editor Data Requirement Guidelines Joan Ugljesa or Chris Hassler OSD Central Repository/web host Jennifer Horner or John McGahan