OneM2M Partnership Project. Contents Introduction Founding Partners Participation Scope & Objectives Structure Deliverables Contacts © 2013 oneM2M Partners.

Slides:



Advertisements
Similar presentations
A global Service layer platform for M2M communications
Advertisements

[Global Initiative for] oneM2M Standardization
Joint Legal/Participation Ad-Hoc 21 March 2012 Report.
- 0 /9- TTA Views on Criteria for Successful M2M Consolidation August 17~18, 2011 (Washington DC, ATIS Building) TTA M2MCons02_15 (Agenda 4.1)
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All The Internet of Things (IoT) aka Machine 2 Machine (M2M) Bilel Jamoussi Chief, Study Groups Department.
1 [4.1]a Criteria for successful consolidation SDOThreshold/Foundation/Launch After/During Formation, Near-Term Comment Summary of discussions Verticals.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ETSI Standardization Activities on M2M communications Joachim Koss, ETSI Board Member Document No:
TETRA Inter System Interface (ISI)
IoT in ODL Lionel Florit, Principal Engineer, ODL ID lflorit
GLOBAL ICT STANDARDISATION FORUM FOR INDIA (GISFI) Prof. Dr. Ramjee Prasad, CTiF, Aalborg University Fellow IEEE, FIET, FIETE, FWWRF - Founding Chairman,
CURRENT STANDARDIZATION ACTIVITIES – ONEM2M GSC-18 Meeting, July 2014, Sophia Antipolis, France Document No: GSC(14)18_012 Source: ETSI Contact:
OneM2M Draft proposal for slide set. This is not intended to be a oneM2M presentation. It is a collection of source material slides which can be used.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All Consolidated M2M standards boost the industry Li Li (Thomas) CCSA(Huawei) Document No: GSC16-PLEN-73.
OneM2M Partnership Project draft proposal for slide set.
4.7 [5] Structure of M2M Consolidation Brian Daly – Member of ATIS Delegation (AT&T Director, Core Network & Government/Regulatory Standards) Meeting of.
REPORT FROM SESSION #3, CRITICAL COMMUNICATION Jonas Sundborg, ETSI Board Chairman, ETSI GSC-18 Meeting, July 2014, Sophia Antipolis, France Document.
1 SDOVerticals To Approach Overall Initial focus on, but not limited to: eHealth Smart Grid Transportation/Telematics Connected Home/Home Automation ARIB/TTC.
Authors list to be completed.
M2M Global Initiative OneM2M April 24, 2012
Authors list to be completed.
M2M Consolidation August 17-18, 2011 Washington D.C. 1 ARIB/TTC’s Feedback on Consolidation Issues M2MCons02_06.
1 The Telecommunications Industry Association (TIA) ADVANCING GLOBAL COMMUNICATIONS Jeff Smith, Ph.D., Chief Technology Officer of Numerex (Nasdaq: nmrx)
Report of co-conveners WG1/WG2 meetings between TP1 and TP2 Group Name: Technical Plenary #2 Source: Omar Elloumi, Alcatel-Lucent,
Summary of main questions on the Partnership Agreement and the secretariat support End of day 1.
Overview TIA TR-50 – Smart Device Communications Orlett W. Pearson March 2010.
Geneva, Switzerland, April 2012 Introduction to session 7 - “Advancing e-health standards: Roles and responsibilities of stakeholders” ​ Marco Carugi.
Overview of the 11 th CJK IT Standards Meeting (CJK-11) ARIB, TTC 1 M2M Meeting of Potential Consolidation Partners # March 2012 in Tokyo, Japan.
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to oneM2M plenary, 05 Mar 2012 Doc: Source: ETSI.
DOCUMENT #:GSC15-PLEN-58 FOR:Presentation SOURCE:ETSI AGENDA ITEM:PLEN 6.1 CONTACT(S): Marylin Arndt, TC M2M chair M2M and Internet of Services "When the.
CJK9, Zhangjiajie, China 1/14 Discussion: [Drafted] 3GPPs works in CJK Cooperation CJK 9, Zhangjiajie, China April 8-10,2009 Changho RYOO
Jeju, 13 – 16 May 2013Standards for Shared ICT TIA TR-50 M2M-Smart Device Communications Dr. Jeffery Smith Chief Innovation and Technology Officer/EVP.
Work Group / Work Item Proposal Slide 1 © 2012 oneM2M Partners oneM2M-TP oneM2M_Work_Group_Work_Item_Proposal Group name: Technical Plenary Source:
Proposal for WG3 & WG5 work area split
Report of the oneM2M Legal Subcommittee Group Name: oneM2M Steering Committee Source: Thomas Goode, ATIS, Meeting Date:
Timeline for the oneM2M Partnership Project Timeline and Milestones [Steve Barclay, ATIS] [Joachim Koss, ETSI] Contribution to oneM2M-Cons#4, 28 Mar 2012.
1 [4.7]a Structure of M2M Consolidation SDOStructureComment Overall Goals of Structure: Be responsive to the needs of the vertical market stakeholders.
Status report on CJK NGN Working Group April 9, th CJK Standard Meeting Taesang Choi Chairman of CJK NGN Working Group.
Introduction to 3GPP2 cdma2000 Technology Workshop Ms. Jane Brownley Chair, 3GPP2 Steering Committee
Participation Ad-Hoc Legal Ad-Hoc Joint status. General General good progresses made on the document’s structure The two ad-hocs are meeting jointly One.
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to oneM2M plenary, 14 Mar 2012 Doc: Source: [ETSI]
Introduction to 3GPP Specification & new Trends in Radio Networks
Status of Active Work Items Level of Completeness Group Name: WPM Source: Roland Hechwartner, WPM Convenor Updated:
Introduction to 3GPP2 cdma2000 Technology Workshop Ms. Jane Brownley Chair, 3GPP2 Steering Committee
Technical Plenary Terms for the collaboration with P2413 From: oneM2M TP Chair Source: Meeting Date: Agenda Item:
Jeju, 13 – 16 May 2013Standards for Shared ICT TTA M2M Activities & Proposal of revised resolution Peter J. Kim, Principal Specialist, TTA Document No:
Jeju, 13 – 16 May 2013Standards for Shared ICT GSC Emergency Communications Task Force Report (GSC-EM TF) Presenter: Chantal Bonardi GSC-EM Task Force.
What is oneM2M? 2 Covers: Requirements Architecture API specifications Security Interoperability Facilitate, implement and promote IoT.
Jeju, 13 – 16 May 2013Standards for Shared ICT oneM2M Project Presenter: Luis Jorge Romero oneM2M Steering Committee Chairman Document No: GSC17-PLEN-38.
Welcome to oneM2M! Group Name: oneM2M Welcome Session Source: Mitch Tseng, ARC WG Vice Chair, Roland Hechwartner, TP Vice Chair & oneM2M Secretariat.
ATIS’ Machine-to-Machine (M2M) Activity
.
Consolidated M2M standards boost the industry
ETSI - HGI – PUBLICLY AVAILABLE SPECIFICATION (PAS)
Solving the IoT Platform Challenge
ETSI Standardization Activities on M2M communications
3GPP Status.
Presenter: Luis Jorge Romero oneM2M Steering Committee Chairman
ETSI Standardization Activities on M2M Communications
GSC Emergency Communications Task Force Report (GSC-EM TF)
TTA M2M Activities & Proposal of revised resolution
Global Collaboration on Future Network Standardization
Standards for Shared ICT
ETSI Standardization Activities on M2M Communications
Current standardization activities – oneM2m
GLOBAL ict standardisation forum for india (Gisfi)
ETSI Standardization Activities on Smart Grids
TIA TR-50 M2M-Smart Device Communications
Reinhard Scholl, GTSC-7 Chairman
CCSA Considerations on M2M Consolidation
ATIS’ Machine-to-Machine (M2M) Activity
Presentation transcript:

oneM2M Partnership Project

Contents Introduction Founding Partners Participation Scope & Objectives Structure Deliverables Contacts © 2013 oneM2M Partners oneM2M Partnership Project 2

Introduction On July 24, 2012 seven of the world’s leading ICT Standards Development Organizations (SDOs) launched a new global organisation: the oneM2M Partnership Project: to: – cooperate in the production of globally applicable, access- independent M2M Service Layer specifications, including Technical Specifications and Technical Reports related to M2M Solutions and – ensure the most efficient deployment of machine to machine (M2M) communications systems © 2013 oneM2M Partners oneM2M Partnership Project 3

Founding Partners The partnership project was founded by 7 Partner Type 1 organisations: – ARIB (Association of Radio Industries and Businesses) - Japan ARIB – ATIS (Alliance for Telecommunications Industry Standards) - USA ATIS – CCSA (China Communications Standards Association) - China CCSA – ETSI (European Telecommunications Standards Institute) - Europe ETSI – TIA (Telecommunications Industry Association) - USA TIA – TTA (Telecommunications Technology Association) - Korea TTA – TTC (Telecommunications Technology Committee) - Japan TTC © 2013 oneM2M Partners oneM2M Partnership Project 4

Participation There are 4 levels of participation: – Partner Type 1 – Partner Type 2 – Member – Associate Member Further details can be found: in the oneM2M Partnership agreement oroneM2M Partnership agreement © 2013 oneM2M Partners oneM2M Partnership Project 5

Scope & Objectives To develop globally agreed-upon M2M end-to-end specifications using common use cases and architecture principles across multiple M2M applications to connect M2M devices with application servers worldwide with an access independent view of end-to-end services To define a Service Layer platform with high level and detailed service architecture including protocols/APIs/standard objects based on this architecture (open interfaces & protocols); focus on interoperability, test and conformance specifications Common use cases, terminal/module aspects, including Service Layer interfaces/APIs between: – Application and Service Layers – Service Layer and communication functions Security and privacy aspects (authentication, encryption, integrity verification) © 2013 oneM2M Partners oneM2M Partnership Project 6

Structure SC (Steering Committee) FC (Finance Committee) Marcom (Marketing & Communications) LG (Legal Group) MandP (Methods & Procedures) © 2013 oneM2M Partners oneM2M Partnership Project 7 TP (Technical Plenary) WG 1 (Requirements) WG 2 (Architecture) WG 4 (Security) WG 5 (Management, Abstraction and Semantics)

Deliverables WG1 - Requirements – Technical Report (TR): oneM2M Use cases collection – Technical Report (TR): Benefits of oneM2M technology – Technical Specification (TS): oneM2M Requirements WG2 - Architecture – Technical Report (TR) Part 1: Analysis of the architectures for transfer to oneM2M Part 2: Study for the merging of the architectures proposed for transfer to oneM2M and resolve critical potential gaps – Technical Specification (TS): M2M Architecture WG 4 - Security and WG 5 – Management, Abstraction and Semantics are currently drafting a new work items The target is to have a minimal deployable solution available by the end of © 2013 oneM2M Partners oneM2M Partnership Project 8

Contacts For general enquiries please do not hesitate to contact the oneM2M Secretariat at: For a more detailed contact list please refer to this web page: © 2013 oneM2M Partners oneM2M Partnership Project 9