Tariff Changes Proposed by Integrated System (IS) 2/20/2014 Carl A. Monroe EXEC VP & COO.

Slides:



Advertisements
Similar presentations
The Midwest ISO from a Transmission Owner Perspective.
Advertisements

1 WECC/AESO Membership and Coordinating Operating Agreement WECC Board of Directors Meeting December 2007 Diana Pommen Director Interjurisdictional Affairs.
Western Area Power Administration
Cleco Transmission Planning Summit Attachment K November 15, 2007 Terry Whitmore.
Parker-Davis Project FES Contract Amendment January 16, 2004.
Allan Wick, CFE, CPP, PSP, PCI, CBCP Chief Security Officer WECC Joint Meeting October 8, 2014.
Federal Energy Regulatory Commission Large Generator Interconnection Order on Rehearing (Order No A) RM March 3, 2004.
1 RTWG Tariff update to the BOD, MOPC, SPC, and RSC January 4, 2005.
WELCOME Western Area Power Administration1. Where did the journey begin? Western Area Power Administration2.
Does owning a solar array make you a utility?...and other questions A presentation to the Kentucky Environmental Quality Commission Andrew Melnykovych.
SCHEMATICS OF AMM. Market Structure Electricity Flow KESH - GenIPPsIMPORTS EXPORT MARKETS SPPs (Distributed Generators) OST Transmission System Operator.
SPP’s 2013 Energy Consumption and Capacity 2 12% annual capacity margin requirement CapacityConsumption Total Capacity 66 GW Total Peak Demand 49 GW.
Net Metering and Interconnection Stakeholder Discussion Net Metering and Interconnection Stakeholder Meeting September 21, 2012 Discussion of.
Transmission Transporting Energy by Wire Matthew Stoltz Basin Electric Power Cooperative 1 1.
Federal Energy Regulatory Commission Large Generator Interconnection Final Rule RM July 23, 2003.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
Introduction to Bonneville Power Administration
Highlights of Commission Activities Little Rock ASHRAE Monthly Meeting October 12, 2011 Presented By: John P. Bethel.
Consumer Advocates of the PJM States Who we are and our policy focus OPSI Annual Meeting Raleigh, NC October 8, 2013.
1 Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
WINDPOWER 2003 Austin, TX May 18-21, 2003 Session 4A: Regulatory Issues Monday May 19, :40-5:00 pm Wind Generation Interconnection to Transmission.
Large Generator Interconnection Procedures Reform Stakeholder Meeting February 19, 2009.
1 New Mexico State University Santa Fe Conference 2005 Steve Rodgers Office of Markets, Tariffs & Rates—South Federal Energy Regulatory Commission March.
OSC Meeting April 27, Transmission Cost Allocation Overview.
Andy Engel and Andy Cook The Hamilton Consulting Group Hamilton-consulting.com.
Overview Interconnection Federal Regulations –1978 PURPA Legislation –1992, 2005 & 2007 PURPA Legislation Changes –RUS Rules DG Policy State Regulations.
Bulk Power Transmission System
Perspectives on Municipalization Jim Robb Senior Vice President, Planning and Development March 13, 2012.
Western Area Power Administration Summer Status Arizona Corporation Commission Special Open Meeting May 17, 2000.
1 Interconnection Update Jay Zimmerman Manager, Transmission Policy Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Updated 1/28/2011. Cost Allocations and Affordability of Tariffs March 8, 2011 Jay Caspary ·
Transfer Service Issues Meeting Bonneville Power Administration (BPA) “Considerations” From Exhibit A, of the 20-Year Contract OTHER ISSUES AS THEY RELATE.
Congressional Briefing Winter, Who is Mid-West? Over 250 consumer-owned, not-for-profit electric utilities in the Upper Great Plains Our members.
1 Energy Delivery Eastern Interconnection Planning Collaborative Joseph Payne Entergy Services, Inc. New Orleans, LA August 11, 2010.
Tariff Change Recommendations to the Commercial Practices Committee From the Regional Tariff Working Group April 9, 2001.
Midwest ISO Discussion February 5, 2009 Greg Levesque Manager – Regional Relations & Policy.
Utah Geothermal Power Generation Workshop Regulatory Issues August 17, 2005 Presented by Becky Wilson Utility Economist Utah Public Service Commission.
2006 SPP RTO Expansion Plan Carl A. Monroe July 30, 2006.
NARUC/FERC COLLABORATIVE: DEMAND RESPONSE Paul Suskie, Chairman, Arkansas Public Service Commission July 15, 2007.
REPUBLIC OF MACEDONIA STATUS REPORT ON MEETING THE COMMITMENTS OF THE ATHENS MOU SEEERF IV PERMANENT HIGH LEVEL GROUP MEETING Athens, Greece September.
Tariff Change Recommendations to the Commercial Practices Committee From the Regional Tariff Working Group.
Lauren Azar Senior Advisor to the Secretary U. S. Department of Energy May 31, 2013 – WI Public Utilities Institute 1 Transmission Planning – A National.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
AEP PRESENTATION TO SPP MULTI-OWNER COMPENSATION TASK FORCE Presented July 8, 2004 Dallas, Texas.
1.
© 2015 McNees Wallace & Nurick LLC OPSI Annual Meeting October 13, 2015 Session 6 – Reliability Pricing Model: Are Further Changes Necessary?
1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The.
Lessons Learned from Existing RTOs John Moore January WCEA Meeting January 7 th, 2016.
FERC Order 1000 Transmission Planning and Cost Allocation Key Points of Seminole Electric Cooperative, Inc.’s Proposal FRCC Regional Stakeholder Meeting.
Intersection of Federal and State Laws on Marijuana Presented by: Chris Gunn Bonneville Power Administration October 29, 2015.
Overview of Energy Policy Act of 2005 A Review of Implementation issues in New Hampshire.
PRESENTER’S NAME TITLE AMERICAN PUBLIC POWER ASSOCIATION Data from the Energy Information Administration, 2014 and Public Power Statistical Report, 2015.
Western Area Power Administration Land Acquisition Discussion May 11, 2016.
RTO WEST Summary of RTO West 9/18/02 Declaratory Order Presentation to The Committee on Regional Electrical Power Cooperation (CREPC) by John Carr 10/1/02.
Queensland’s Uniform Tariff Policy AER’s QLD TSS Public Forum 13 April 2016.
UTC STUDY OF DISTRIBUTED GENERATION AND RECOMMENDATIONS Presentation for the Washington Future Energy Conference October 19, 2011.
ABOUT PUBLIC POWER PRESENTER’S NAME TITLE AMERICAN PUBLIC POWER ASSOCIATION Data from the Energy Information Administration, 2014 and Public.
Mountain West Transmission Group
Clarification of the Resident Load Definition
Regional Transmission Organizations
Missouri River Energy Services
T.O. Highway/Byway Recommendations
Current as of 12/12/2017 RES-BCT.
Westar Formula Rate and your bill
2016 Mid-West Electric Annual Meeting
How the Missouri River is Operated - WAPA’s Role - Mid-West Electric Consumer Association Annual Meeting December 11, 2018 | Denver, CO Lori L. Frisk VP,
Mountain West Transmission Group Panel Discussion
Indicators regarding the total revenue approved for the period October 2018 – September 2019 a) Total revenue approved by ANRE is allocated by the fix.
Offshore Wind Transmission:
Presentation transcript:

Tariff Changes Proposed by Integrated System (IS) 2/20/2014 Carl A. Monroe EXEC VP & COO

Tariff Change Area Review Zone 19 – Upper Missouri Zone (UMZ) Western-UGP Federal Service Exemption (FSE) Base Plan Funding – Entry Grandfathered Agreements Public Power to Non-Public Utility Network Service Thru/Out Revenue Distribution Network Service Agreement 2

Zone 19 - UMZ Includes transmission facilities of Basin Electric Power Cooperative (Basin), Western Area Power Administration – Upper Great Plains Region (Western- UGP), and Heartland Consumers Power District (Heartland) Includes facilities in East and West Interconnection Additional transmission owners would consider adding facilities within the zone –Facilities with credits under the Western tariff –Facilities that meet Attachment AI but not definition of transmission in IS 3

Zone 19 - UMZ Areas of change –Add definition of UMZ, Western-UGP –Add to Schedule 1,7, 8, 9, 11 –Attachment H, M 4

Western-UGP FSE Federal Statutes govern the functions and limitations of Western-UGP –Federal Reclamation Law, largely contained in the Department of Energy Organization Act of 1977, the Reclamation Project Act of 1939, the Flood Control Act of 1944, and the Fort Peck Project Act of 1938 –Other Federal law as applicable, and specifically Western-UGP’s ability to join an RTO consistent with section 1232 of the Energy Policy Act of 2005 –Western has advised that consistent with its statutory obligations it cannot agree to: (1) involuntary cost allocation for third-party transmission facilities, which includes SPP’s cost allocation share under its tariff and (2) Western’s rates are subject to a different standard of review pursuant to the delegation of authority from the Department of Energy delegated to FERC. Joining SPP is based on the fixed nature of the generation resources committed to the preference customers of Western-UGP as well as the sufficiency of existing transmission Western-UGP built to meet its requirements. 5

Western-UGP FSE Exempt from: –Schedule 11 Regional Transmission Cost Allocation –Congestion Costs/ARR/TCR –Marginal Losses/Overcollection Distribution –FERC’s Annual Assessment and Schedule 12 Areas of change –Add definition: FSE –40 – FSE for Schedule 11 Regional Rate –Schedules 7, 8, 9, 11, 12 6

Base Plan Funding – HW/BW Offered same as to Entergy All Facilities needed after October 1, 2015 would be in regional cost allocation for all SPP LSEs including the new members. Areas of change –Definition of Base Plan Funding –List of Facilities that would be eligible after October 1, 2015 for regional cost allocation, until integrated into SPP Planning –Regional Cost Allocation Review 7

Grandfathered Agreements Considering which transmission agreements in place at October 1, 2015 to add. Areas of change –Definition of Grandfathered Agreements –Attachment W 8

Public Power to Non-Public Utility Area of change –39.1 – Protections of Public Power extended to all Non- Public Utilities 9

Network Service Thru/Out Revenue Distribution Proposing a generic change to the revenue distribution if Network Service is provided thru and out of SPP. Change to distribute to zone exited, or shared with zones that are exited. Area of change –Attachment L 10

Network Service Agreements Split of NITS between Western-UGP and other co- supplier Unique to Western-UGP based on FSE Areas of change –Western-UGP retains all transmission usage rights –FSE –Western-UGP pays full UMZ rate excluding Schedule 11 Regional for their Federal Power deliveries to Preference Customers from Federal Resources –West Interconnection usage exempt from Schedule 11 Regional 11

Carl A. Monroe EVP & COO