ERCOT Public 1 Overview of ERCOT Concept Paper on Real-Time Co-optimization of Energy & Ancillary Services & Multi-Interval Real-Time Market.

Slides:



Advertisements
Similar presentations
Ancillary Services and SCED Jeff Gilbertson Market Analyst Congestion Management Working Group 9/4/2013.
Advertisements

Concerns with RUC Capacity Short Charge and Energy Trades.
Loads Acting as a Resource Relationships with QSEs and LSEs
SAWG Update to WMS February 4 th, 2015 Brandon Whittle.
John Dumas Director of Wholesale Market Operations ERCOT Operating Reserve Demand Curve.
ERCOT Public 1 AS Demand Curves for Real-Time Co-optimization of Energy & Ancillary Services.
FAST Procurement and Pricing May 28, 2015 TAC Meeting 1.
1 Generator Telemetry and Market Prices WebEx Training July 28 th, 2015.
Loads in SCED Comments submitted by Luminant Energy Company, LLC.
ERCOT Tool to manage unexpected incremental load November 16, 2006.
Load Resource Inputs to the Multi-Interval Real-Time Market ERCOT is requesting input from LRs and QSEs to enable running meaningful MIRTM simulations.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
Demand Side Working Group Load Resource Performance Subgroup April 9, 2010 Mary Anne Brelinsky EDF Trading North America.
1 Settlement Changes R5 (SEP 2015) and R5.5 (OCT 2015) Blake Holt ERCOT COPS 9/14/2015.
Storage Integration – Look Ahead SCED Issues for ETWG CAES Perspectives Brandon Whittle ETWG Storage Workshop.
1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
Lead from the front Texas Nodal 1 Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 - Handbook EDS 3 Release 6 MP Planning.
January 21, 2010 Security Constrained Economic Dispatch Resmi Surendran.
Grabbing Balancing Up Load (BUL) by the Horns December 2006.
ERCOT Public 1 Real-Time Co-optimization of Energy & Ancillary Services Operational Issues.
Nodal Program Update and SEWG Update COPS 1/11/2011 Jim Galvin.
Loads in SCED Comments submitted by Luminant Energy Company, LLC.
QMWG – Feb. 26, 2014 Discussion topic: NPRR585 Clarification of Administrative Pricing Requirements for Self-Committed Combined Cycle Combustion Turbines.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
Market Participant Data Access 1 Market Participant Data Access Jan Stephen Kerr.
Resource Adequacy Task Force (RATF) Update to WMS June 12, 2013.
Congestion Management and Ramp Rate for Delivering Ancillary Services Resmi Surendran.
PJM©2013www.pjm.com Demand Side Working Group Loads in SCED Angelo Marcino Real-Time Market Operations – PJM April 14, 2014.
CMWG Update WMS September 2015 Meeting. CRR Balancing Account Fund Discussion The CRR Balancing Account fund appears to be working as expected The cap.
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
October 02, 2009 Austin, Texas Quick Start Task Force Meeting 1.
Appeal of PRS Action NPRR 351, Calculate and Post Projected Non-Binding LMPs for the Next 15 Minutes Floyd Trefny Texas Steel Companies.
SAWG Update to WMS April 6 th, 2015 Brandon Whittle.
1 Tests for Reasonable LMPs & Price Validation Tool Overview October 27, 2009 NATF.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
ERCOT Public 1 Real-Time Co-optimization of Energy & Ancillary Services Co-ordination of Power Balance Penalty Curve, VOLL, SWOC for AS Demand Curves.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Load Frequency Control (LFC) Business Requirements Energy.
MIRTM Temporal Constraints Discussion Loads in SCEDv2 Subgroup Jan. 8, 2016.
Programs/Products that ERCOT Does Not Presently Offer ERCOT Demand Side Working Group New DR Product Options Subgroup Jay Zarnikau Frontier Associates.
SAWG Update to WMS September 2 nd, 2015 Brandon Whittle.
1 WMS Report TO TAC April In Brief Two Working Group reports Two Working Group reports Two Task Force Reports Two Task Force Reports BENA presentation.
“Managing the Integration of Energy Storage Technologies” Kenneth Ragsdale ERCOT.
Future Ancillary Services Team (FAST) Update April 24, 2014 TAC Meeting 1.
Overview of Governing Document for Weather-Sensitive ERS Pilot Project Stakeholder Workshop Mark Patterson, ERCOT Staff March 1, 2013.
DAM Self-Commitment Issues & Solutions Shams Siddiqi, Ph.D. (512) March 3, 2008.
DSWG Update to WMS 2/9/2011. EILS Procurement Results from 1/31 Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours.
NPRRs NPRR649 Lost Opportunity Payments for HDL Manual Overrides. This Nodal Protocol Revision Request (NPRR) proposes two options for a lost opportunity.
Analysis of August 13, 2015: ORDC, RRS & PRC Changes Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) November 13, 2015.
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
ERCOT Public 1 AS Demand Curves for Real-Time Co-optimization of Energy & Ancillary Services.
Resource Adequacy Task Force (RATF) Update to WMS October 8, 2013.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
Reliability Deployments Task Force Update WMS Meeting WMS Chair created task force with the directive that the task force will address real-time.
RDTF June 1, Purpose “The effect of the Shadow Price cap for the Power Balance Constraint is to limit the cost calculated by the SCED optimization.
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
WMS Meeting- February 13, 2013 Day-Ahead Market (DAM) Analysis of Feb. 6 Ancillary Service Prices ERCOT- Matt Mereness (DAM/CRR Manager) IMM- Dan Jones.
Settlement of Ancillary Service Infeasibility ERCOT QMWG April 15, 2016.
IMM alternate framework for Look-Ahead SCED November 21, 2011.
Lead from the front Texas Nodal 1 Texas Nodal Energy & Market Management System EMS/MMS Projects Requirement Documents November.
Reliability Must Run Resources for Summer Slide 2 RMR for Summer 2011 RMR Contracts for Mothballed Units ERCOT has signed RMR Agreements with two.
Non-Spin Deployment Resmi Surendran. RUC Awarded Ancillary Service Bring Resources On-Line if awarding REG or RRS When awarding Non-Spin – First award.
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
“Look Ahead SCED” Sai Moorty ERCOT November 28, 2011.
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Congestion Management and Ramp Rate for Delivering Ancillary Services
Real-Time Co-optimization of Energy & Ancillary Services
Real-Time Co-optimization of Energy & Ancillary Services
Principles of Participation in Real-Time Co-optimization
30 Minute Reserves EPFSTF January 4,
Presentation transcript:

ERCOT Public 1 Overview of ERCOT Concept Paper on Real-Time Co-optimization of Energy & Ancillary Services & Multi-Interval Real-Time Market

ERCOT Public 2 Multi-Interval Real-Time Market A.Enable the active participation of additional Resources in Real-Time price formation rather than passively responding Load Resources with “blocky” deployable MWs and temporal constraints are candidates B.The Multi-Interval RT Market is cleared (normally) every 5-minutes, in which, the market clearing process considers a set of consecutive 5-minute intervals, of up to a maximum of 30 minutes, starting with the current 5- minute interval.

ERCOT Public 3 Multi-Interval Real-Time Market 8:40 8:45 8:50 8:55 9:00 9:05 9:10 9:15 9:20 9:25 9:30 9:35 Intervals where ONLY Commitment Instructions are binding and the LMPs and MW awards (energy, AS) are indicative Interval where the LMPs, MW awards (energy, AS) and Commitment Instructions are ALL binding commitment instructions Sequence of Multi-Interval RT Markets Analysis window of rolling 30 minutes RT Market Execution: Depicts the start and end times of the clearing process and the length of symbol is indicative of maximum time allowed to clear market

ERCOT Public 4 Multi-Interval Real-Time Market C.Pricing run required to Treat “blocky” MW deployment as dispatchable and hence participate in price formation Pricing run also required to allow ramp constrained Resources to participate in price formation D.Settlements Make whole payments from: 1.Resources that are ramp-constrained and are awarded a binding Base Point that is uneconomical for them 2.Resources that are committed for a future interval and, after following the commitment instruction, the binding RT LMPs (and MCPCs) for that interval are uneconomical for them Uplift arises from the two above forms of make whole payment 1.Instead of directly going to the uplift mechanism, should the “shorts” be charged first?

ERCOT Public 5 Multi-Interval Real-Time Market E.Issues: Load Forecast is critical input. Improvements required Clearing Engine run time to solve within acceptable timeframe is a challenge

ERCOT Public 6 Real-Time energy and Ancillary Service Co-Optimization A.Full fledged Real-Time (RT) energy and Ancillary Service (AS) co-optimization utilizing Operating Reserve Demand Curve (ORDC) 1.Replaces the current approximation to RT energy and AS co- optimization using ORDC B.Enables appropriate scarcity pricing through the valuation of operating reserves 1.Current approximation to RT energy and AS co-optimization also enables scarcity pricing C.Allows Market participants to adjust their energy and AS portfolios in Real-Time

ERCOT Public 7 Real-Time energy and Ancillary Service Co-Optimization D.Real-Time Market nominally cleared every 5 minutes (same as current) 1.Energy Awards (Base Points) to meet ERCOT system wide demand – same as current 2.Energy Imbalance settlements unchanged – same as current 3.LMPs at every electrical bus and Settlement point – same as current NEW 4.AS (Reg-Up, Reg-Down, RRS, Non-Spin) awards to meet full AS requirements 5.AS Imbalance settlements – similar to current AS Imbalance settlements for ORDC, but each type of AS (Reg-Up, Reg-Down, RRS, Non-Spin) will have its own AS imbalance settlements 6.AS MCPCs for each AS type

ERCOT Public 8 Real-Time energy and Ancillary Service Co-Optimization E.“HASL – free” operation 1.Concept of HASL does not exist, i.e. no instruction from ERCOT to release HASL. This eliminates the current hand shaking procedure involved with the ERCOT instructed release of HASL 2.Resource Specific Offers for AS ($/MW price and MW quantity) can be updated at any time (or until very close to Real-Time) 3.Existence of Resource Specific AS Offers at time of market clearing is considered intenty to provide AS if awarded and be deployed potentially at the same time 1.Communication delays, or different pathways for information may lead to situations where QSE representing Resource is instructed to deploy AS before the QSE gets notification of AS award 4.Key performance metric is the ability to follow Base Point Instructions

ERCOT Public 9 Real-Time energy and Ancillary Service Co-Optimization E.“HASL – free” operation - continued 5.Different treatment for RRS from Load Resources with High Set Under Frequency Relay Treated as price takers in each 5 minutes clearing (cannot potentially arm/disarm relay if RRS awarded/not awarded?) Deployment of RRS from Load Resources will remain the same (local frequency relay operation, ERCOT instructed deployment of RRS) 6.Telemetry/XML submissions requirements from Resources will change Telemetered AS responsibility from QSE not required May require changes to AS Offer submission rules (deadline, etc.) 7.Pricing run will still be required to price out deployment of RRS from Load Resources, ERS deployment, LSL from RUC/RMR

ERCOT Public 10 Real-Time energy and Ancillary Service Co-Optimization F.Settlements –Does not introduce any NEW make whole or uplift –For Real-Time, AS Imbalance settlement concept (similar concept to Real-Time Energy Imbalance settlement) to settle the Real- Time AS awards G.Some Issues for further discussion F.Use of ORDC G.Coordination of values ($/MWh or $/MW/h) of VOLL, Power Balance Penalty, and AS demand curves