1 BILC07/ACFA Charge Hitoshi Yamamoto BILC07, Beijing 2007.2.4.

Slides:



Advertisements
Similar presentations
Beyond the ALCPG David B. MacFarlane Associate Laboratory Director for PPA.
Advertisements

6-Nov-06 FALC Resource Board Global Design Effort 1 Report from the GDE Barry Barish Caltech / GDE 6-Nov-06.
J. Brau ILC Detector R&D SLUO Annual Meeting Sep 11, ILC Detector R&D Motivated by Outstanding Physics Opportunity & Advanced Technical Challenges.
BDS GDE context LC-ABD2 : WP4 - Beam Line Design 12 th April 2007, LC-ABD Plenary, RHUL Deepa Angal-Kalinin ASTeC, The Cockcroft Institute.
11-Nov-06 ILCSC - Valencia Global Design Effort 1 GDE Report and Discussion of Costs Barry Barish Caltech / GDE 6-Nov-06.
J. Brau ALCPG Workshop at Snowmass August 27, Concluding Remarks 2005 ILC Physics and Detectors Workshop at Snowmass.
GDE Meeting B Barish 16-Aug-05 The GDE – who, what and how? The BCD – what is it? Internal Organization toward BCD What do we want out of Snowmass? How.
山本 均 Hitoshi Yamamoto 東北大学 Tohoku University 北京、十一月二十三日、二 00 六年 Beijing, Nov 24, 2006 WWS Report MDI Report.
“GLD” Detector Concept Study 21. Mar. Y. Sugimoto KEK.
1-Dec-06 HEPAP Univ. Subpanel Global Design Effort 1 ILC Report Barry Barish Caltech / GDE 1-Dec-06 RDR Design Freeze.
D. Peterson, “WWS R&D Panel Project Registry”, ALCPG, Snowmass, 20-August World Wide Study Detector R&D Panel Project Registry Web Site web site:
ILCSC and WWS News David J. Miller: ILCSC news for MDI workshop, 6 January ILCSC Membership Recent ILCSC meetings Worldwide Study Plans.
Machine-Detector Interface MDI Panel Report MDI Panel is one of several World-Wide Study (WWS) panels (R&D, Detector costing, MDI, 2 IRs) Interim panel.
Summary Remarks By Jonathan Dorfan. We Are Living In a Remarkable Time – We Stand at the Door to a A scientific Revolution  Discoveries of the past five.
ILCTRP WWS  ILCSC D.J.Miller for WWS; 16/11/ Report to ILCSC from the World-Wide Study of Physics and Detectors for a Linear Collider. 1.Proposed*
Closing remark Weiguo Li, IHEP 9 th ACFA workshop and GDE Meeting Feb. 7, 2007 IHEP, Beijing.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
Charge to the Workshop (and a report from WWS) Hitoshi Yamamoto July 11, 2005 ACFA8, Daegu, Korea.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
Our mandate has been completed The physics and detector perspective of the ILC-TDR Sakue Yamada May 27, /05/271Sakue Yamada ECFA.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
27-March-10 LCWS10 - Beijing Global Design Effort 1 Barry Barish LCWS10 - Beijing 27-March-10 “Cost Containment” for the TDR.
1 1 LCC Physics and Detector Hitoshi Yamamoto ECFA LC2013, DESY May 27, 2013.
Executive Session Director’s CD-1 Review of the LBNE Project September 25, 2012 Jim Yeck.
Octobre MPI Munich FCAL Workshop in Munich W. Lohmann, DESY The 14 mrad X-angle, two IPs The push-pull option The next calendar dates Where we are.
ILD workshop 119 participants (including last minute registrations which are not on the WEB) 2 days of contributions lively discussions, which had to be.
7 August, 2006Gakujyutsu Sousei Monthly Meeting1 The Detector Chapter of The Detector Concept Report 学術創成定例月会議 8月7日 宮本彰也.
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
27 September, 2006Gakujyutsu Sousei Monthly Meeting1 The Detector Chapter of The Detector Concept Report 学術創成定例月会議 9月27日 宮本彰也 8 月 7 日の報告も見てください
RD’s Report on Detector Activity General Overview Project Advisory Sakue Yamada December 14, 2012 Sakue Yamada.
Jim Brau for WWS to ICFA at Uppsala, 3 July Report of WorldWide Study on Physics and Detectors for ILC 1. LCWS at Stanford March Discussing.
6-10 Nov. 06 ILCWS Valencia Global Design Effort 1 RDR Management Board Overview K. Yokoya KEK.
ILD Optimization Why – when – what Ties Behnke, DESY Henri Videau, LLR.
WWSWWS David J. Miller for WWS to ILCSC at Frankfurt, 10 May from the WorldWide Study on Physics and Detectors for ILC 1. LCWS at Stanford
Report from ILCSC Shin-ichi Kurokawa KEK ILCSC Chair GDE meeting at Frascati December 7, 2005.
MDI DBD Editors Report Tom Markiewicz/SLAC SiD Collaboration Meeting, SLAC 22 August 2012.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
WWSWWS The WWS Roadmap for ILC Detectors by F. Richard LAL/Orsay.
CHARGE TO THE 2007 LINEAR COLLIDER WORKSHOP Jim Brau University of Oregon DESY Hamburg May 30, 2007.
1J. Brau - ILCSC Meeting - Beijing - August 19, 2004 Organizing the Global Experimental Program The ILCSC has asked the Worldwide Study, as its Physics.
Report from Worldwide Study and Charge to the Workshop ACFA04, Taipei 11/8/2004.
February, INP PAN FCAL Workshop in Cracow W. Lohmann, DESY The BCD (Baseline Configuration Document) The next calendar dates Where we are with FCAL.
Introduction and Charge Barry Barish GDE Meeting Frascati 7-Dec-05.
Recent Development of Detector Activities for ILC CCAST07 Nov Introduction Call for LOI & mechanism of selection IDAG Benchmarks Common.
J. Brau SiD Workshop (RAL) April 14, Recent Developments on Global Detector Coordination.
News Y2K June 25, Summary of June 12 Face-to-Face Meeting.
Introduction to the seminar ILC Detectors: Status and Prospects Akiya Miyamoto KEK IPNS 18 July
Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.
Detector Cooperation with CLIC PAC Pohang meeting November 3, 2009 F. Richard LAL/Orsay 11/03/20091.
Philip Burrows MDI Panel Meeting 15/08/06 Philip Burrows John Adams Institute Oxford University SiD and IR/MDI Issues.
3 October, 2006GLD Meeting1 The Detector Chapter of The Detector Concept Report GLD Meeting 3 October, 2006 Akiya Miyamoto.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Report from SB2009 Working Group Akiya Miyamoto 8-July-2010 DESY ILD Software and Integration Workshop.
Global Design Effort1 September 20-22, 2006 MAC Review Response to 1 st MAC Mtg Barry Barish GDE.
Global Design Effort Progress and Plans of the Beam Delivery Systems and Machine Detector Interface WG Daniel Schulte (CERN), Brett Parker (BNL), Andrei.
RD’s Report SiD Group Sakue Yamada December 14, 2011 (remote participation) 2011/12/141SiD-meeting Sakue Yamada.
The ILC Outlook Barry Barish HEP 2005 Joint ECFA-EPS Lisbon, Portugal 23-July-05.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
MDI Overview Hitoshi Yamamoto Tohoku University GDE/LCWS06, Bangalore, March 9, 2006.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
Status of the DCR Detector Chapter International Linear Collider (ILC) Workshop ILC-ECFA and GDE Joint Meeting in Valencia 7 November 2006 Detector Concept.
ILC Physics and Detector - Status and Goals for LCWS14 – Hitoshi Yamamoto LCWS14, Belgrade October 6,
Nouvelles Récentes. 2 WWS WorldWide Study on Physics and Detectors for Future Linear Colliders  Recognize and coordinate studies on whole detector concepts,
The SiD LOI Proposed Milestones and Schedules SiD Collaboration Phone Meeting September 6, 2007 John Jaros.
GDE and ASIA ACFA ALCSC.
For ILD joint steering board
The SiD Detector Outline Overview
ILC-ECFA, November 7, 2006, Valencia, Spain
Water and Energy Cycle Project Office (WECPO)
Presentation transcript:

1 BILC07/ACFA Charge Hitoshi Yamamoto BILC07, Beijing

2 Detector Timeline ( ) Acc.Baseline Configuration Document Detector R&D report (by R&D panel) (2006.2) Detector Outline Document (one for each detector concept) (2007.2) Acc. RDR (Reference Design Report) DCR (Detector Concept Report : one document) Accelerator Detector Synchronized with the accelerator benchmarks Accelerator EDRDetector EDR (within ±1 year of acc. EDR)

3 DCR panel of editors –Physics The physics section of the RDR/CDR/exec summary set A grand summary of ILC physics studies up to now Editors: K. Moenig, A. Djouadi, S. Yamashita, Y. Okada, M. Oreglia, J. Lykken –Detector Concepts Editors: J. Jaros, A. Miyamoto, T. Behnke, –Required R&Ds Editor: C. Damerell (R&D panel chair, GDE RDB member) –Costs Cost panel (M. Breidenbach, A. Maki, H. Videau) A preliminary version is released during this workshop. DCR is still not finalized now. DCR (Detector Concept Report) Y. Okada’s talk T. Behnke’s talk

4 Accelerator Timeline beyond Beijing ◆ Feb 8, 2007 ◆ A draft RDR release ◆ Summer 2007 ◆ Finalize RDR ◆ Reorganize GDE toward EDR ◆ EDR completed in 2~3 years ◆ T0 + 7 years ◆ Beam commissioning ◆ +1 year : physics run

5 Detector EDR Timeline ■ Surface assembly requires the detector assembly to start earlier (by ~2.5 years) than otherwise. ◆ Possible to assemble while the exp. hall is prepared. ◆ Needed for beam commissioning at t0+7yrs. ■ This forces the detector EDRs to be ready about the same time as the accelerator EDR. ■ Need to converge to two detectors as early as possible. (Why two? Why not one?)

6 Case for two detectors ■ Sociology and scientific opportunity ◆ Greater scientific interest and greater support ■ Cross-check and scientific redundancy ■ Complementarity ◆ Different systematics ◆ Aggressive designs ■ Competition ■ Efficiency, reliability, and insurance ◆ Maintenance/upgrade + running ■ Historical examples supports the above

7 Baseline: 1IR Cost savings since Vancouver BDS 1IR is the largest single cost-saving item. Two detector, 1IR → push-pull. Barry Barish

8 Push-pull → Baseline ■ Push-pull task force was proposed by GDE (~Sep.06) ◆ WWS offered to provide names from the detector side ◆ GDE and WWS agreed that the push-pull task force reports both to GDE and WWS ◆ Summary and discussion on push-pull Tuesday morning (MDI session) ■ CCB (Change Control Borad) asked WWS and MDI panel for inputs ■ WWS has collected responses from detector concepts, put its own statement as a cover letter, and sent to CCB ■ WWS and MDI accepted the push-pull option conditionally :

9 WWS statement on push-pull ■ Since we cannot conclude with certainty that the push-pull option can meet the requirements of engineering and physics, if the push-pull approach is implemented in the reference design we think a two IR option must be maintained as a back-up in the RDR … ■ …provisions should be included in the baseline design to facilitate a change to the 2 IR design (later)… ■ …urge the GDE and the WWS to give a new charge to the push- pull task force to continue the study of the technical implementation of the push-pull option. (present charge ended at Valencia Nov/06) MDI panel statement on push-pull

10 CCB Response to push-pull ■ CCB recommends … incorporating the "1IR with two detectors push-pull" as Baseline Configuration. ■ CCB recommends … to maintain the previous Baseline with "2IR, single hall, two detectors" as part of Alternative Configuration. ■ CCB recommends … to reinforce a taskforce on Machine- Detector-Interface issues. The taskforce should be specifically charged, and be recognized as such, by both the GDE and WWS, to facilitate pertinent design development efforts and discussions on relevant executive matters.

11 MDI panel ■ Members ◆ Chair: Hitoshi. Yamamoto ◆ LEP (Luminosity, Energy, Polarization) Wolfgang Lohmann, Tsunehiko Omori, Eric Torrence ◆ GDE Philip Bambade, Witold Kozanecki, Tom Markiewicz, Andei Seryi ◆ Detector concepts Phil Burrows, Karsten Buesser, Toshiaki Tauchi ■ Tasks: ◆ Maintain oversight of IR/MDI issues that are relevant both to accelerator and detectors ◆ Report to WWS and GDE ’ s BDS Area Group. ◆ Organize joint MDI sessions of LCWS and some regional meetings Probably a framework of communication between GDE and WWS at higher level. A discussion on this at a MDI session (Tue. Morning)

12 CCRs and WWS/MDI panel ■ 14mrad+14mrad 2IRs (approved) ◆ WWS asked inputs from MDI panel ◆ CCB asked WWS and MDI panel and others for inputs ◆ WWS/MDI both supported the CCR (provided that 2mrad R & Ds be maintained - SUSY search ) ■ Muon wall reduction (approved) ◆ CCB asked MDI panel and others for inputs ◆ MDI panel supported the CCR (provided that space is kept for the full muon walls - muon background may be serious) ■ Surface assembly of detectors (approved) ◆ CCB asked WWS and MDI panel and others for inputs ◆ WWS/MDI supported the CCR (time scheduling, also a rational way of assembly ← CERN visit by MDI panel)

13 Other modification proposals and WWS ■ Bunch number reduction (not an CCR: dropped) ◆ Proposal : Reducing the number of bunches by 1/2 (cost saving of 2~3 % ) ◆ WWS’s informal comment: ‘we would like GDE to double the luminosity by increasing the cost by 2~3%’ ■ Elimination of 3.5% energy overhead (CCR: re-submitted) ◆ CCB asked WWS (and MDI panel) for inputs ◆ WWS: we would not oppose this CCR... express our concern in general with cost-cutting measures which jeopardize the full physics capability of the machine, particularly when they do so irreversibly.

14 Detector Roadmap ■ How to converge to two detectors? ◆ Currently we have 4 : SiD, LDC, GLD, 4th. ◆ More may come (and we should not discourage it) ■ Do we need a ‘panel’ to recommend how? ◆ Can bottom-up efforts accomplish it? ■ Do we need a CDR from each concept? ◆ Good competition, or too many documents to write? Discussion session later today (5pm) Need to strengthen both vertical(concepts) and horizontal(subdetectors) efforts

15 Detector R&D reviews (horizontal effort) ■ Purpose: ◆ ‘Improved communication leading to enhanced R&D programmes’ ■ Format ◆ 1 day open sessions + 1 day closed sessions + 1 day reporting ■ Attached to each ILC phys/det workshops ◆ Beijing (2007/2) : Trackers (TPC, silicon trackers ) ◆ DESY (LCWS 2007/6) : Calorimeters ◆ Fermilab (2007/10) : Vertexing ◆ Asia (2008 spring) : all others (PID, DAQ, Muon, etc.) ■ Review panel members : ◆ WWS R&D panel + external experts on each subdetector ◆ One representative per region close to funding agencies

16 We need to: ■ Finalize DCR ◆ Time scale: as soon as possible ◆ Perform further studies ■ Work toward EDRs ◆ Strengthen concept studies ◆ Strengthen horizontal efforts ◆ Form consensus on how to converge to two detectors ■ Establish better communications with the accelerator camp ◆ Including the push-pull study ■ Prepare (brace..) for physics results from LHC ■ Involve more people and countries

17 GDE management’s idea of push-pull Surely, you jest…