Noteworthy Items (1/2) Product Software Update Process – What is the process? – When can updates be done? – How nimble and timely can it be? – Prioritization.

Slides:



Advertisements
Similar presentations
Roadmap for Sourcing Decision Review Board (DRB)
Advertisements

Information Security Level 2 – Sensitive© 2009 – Proprietary and Confidential Information of Amdocs Recommend Friends Program.
ATC Conference Call January 10, 2008 Thank you for joining the call. We will start the call shortly. Please enter * 6 to mute your line and # 6 to unmute.
Processing Himawari-8 Geostationary Satellite Data Using GOES-R Algorithms for Algorithm Continuity in Operations Jonathan Wrotny1, A. Li1, H. Xie1, M.
SE 555 Software Requirements & Specification Requirements Management.
Lecture 2b: Software Project Management CSCI102 - Introduction to Information Technology B ITCS905 - Fundamentals of Information Technology.
Calibration Working Group L1b Cal/Val Update 1 Presented by Changyong Cao NOAA/NESDIS/STAR GOES-R Calibration Working Group January 9, 2014.
OHT 6.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Development plan and quality plan objectives The elements of the development.
WRAP Technical Support System Project Update AoH Call October 19, 2005.
Change Request Management
User Centered Design April 1-3, 2009 Joshua Ganderson Laura Baalman Jay Trimble.
PopMedNet Software Development Life Cycle Chayim Herzig-Marx Harvard Pilgrim Health Care Institute Daniel Dee Lincoln Peak Partners.
May 15, 2013 Space Weather Product Team (SWPT) Making Sense of the Nonsensical.
Release & Deployment ITIL Version 3
Fundamental of Software Project Management
1 Configuration Management 101 ITS Professional Capacity Building Program T3 Webinar February 21, 2008.
ISO STANDARDS FOR QUALITY MANAGEMENT
Chapter 10.
2013 GOES-R AWG 2 nd Validation Workshop January 2014 Status of Activities and Plans for the GOES-R Core Ground System 1 Satya Kalluri Ph.D. GOES-R.
Test Organization and Management
What if you suspect a security incident or software vulnerability? What if you suspect a security incident at your site? DON’T PANIC Immediately inform:
Test Roles and Independence of Testing Telerik Software Academy Software Quality Assurance.
1 ISA&D7‏/8‏/ ISA&D7‏/8‏/2013 Systems Development Life Cycle Phases and Activities in the SDLC Variations of the SDLC models.
U.S. Department of the Interior U.S. Geological Survey Richard Huffine September 15, 2009 Council for Data Integration Planning Team Summary.
Thomas C. Stein PDS Geosciences Node Washington University in St. Louis 1MS Supporting Active Surface Missions and Adding Value.
CMM Level 2: Repeatable Copyright, 2000 © Jerzy R. Nawrocki Quality Management.
NMP EO-1 TECHNOLOGY WORKSHOP Section 2 Meeting Objectives.
© Mahindra Satyam 2009 Configuration Management QMS Training.
GSICS EP Meeting 2015 – Report from the GSICS Data Management Working Group 1 Report from the GSICS Data Management Working Group Peter Miu / Masaya Takahashi.
2015 GLM Annual Science Team Meeting: Cal/Val Tools Developers Forum 9-11 September, 2015 DATA MANAGEMENT For GLM Cal/Val Activities Helen Conover Information.
NOAA Science Week – Kansas City, MO. 30 April 2012 Non Export-Controlled Information GOES-R – System Validation and User Readiness Planning Stephen D.
Principles of Computer Security: CompTIA Security + ® and Beyond, Third Edition © 2012 Principles of Computer Security: CompTIA Security+ ® and Beyond,
Mentoring: The Right Thing to Do Revisions to the FTM Facilitator Training and Approval Process.
 Establishing state-of-the-art coding, documentation, configuration management standards for the AWG.  Software development process comparable with CMMI.
Consensus Validation A Tool for Teams GALA Leadership Symposium October 11, 2013 Presenter: Mindy Taylor.
Electronic Reporting Tool Ron Myers OAQPS/SPPD/MPG 9/12/2006 Software to Standardize Source Test Planning, Reporting and Assessment and Assessment.
1 GOES-R AWG Product Validation Tool Development Hydrology Application Team Bob Kuligowski (STAR)
National Workshop on ANSN Capacity Building IT modules OAP, Thailand 25 th – 27 th June 2013 KUNJEER Sameer B Pool of experts database and further enhancements.
ASPEC February 2015 Incidents –0 incidents, 0 near misses Hours 31/01/15-27/02/15 11% Site, 1% Travel, 88% Office ASPEC QSHR February 2015 Minutes.
Session 2: Developing a Comprehensive M&E Work Plan.
Software Engineering Process - II 7.1 Unit 7: Quality Management Software Engineering Process - II.
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
1 PG-UR Annual Meeting: Welcome from the GOES-R Program Scientist Steven J. Goodman GOES-R Program Senior Scientist NOAA/NESDIS Annual NOAA Satellite Proving.
Matt Seybold (OSPO/SPSD) GOES-R Data Operations Manager & PRO Team Lead NOAA Satellite Proving Ground and User Readiness Meeting May 9, /9/2016NOAA.
1 Meeting Objectives and Agenda Presented by Jaime Daniels AWG Program Manager (Acting) NOAA/NESDIS/STAR.
Welcome to the MyLearningPlan.Com
Security Development Lifecycle (SDL) Overview
Agenda Item 2: Catch up session 15 May 2017
Test Roles and Independence of Testing
Supporting quality devices
VitaScan Online Calibration
Managing the Project Lifecycle
GOES-R AIT: Updating the Data Processing System with data from the Himawari-8 Geostationary Satellite Jonathan Wrotny1, A. Li1, A. Ken1, H. Xie1, M. Fan1,
NESDIS-JMA AHI Collaboration
Testing Process Roman Yagodka ISS Test Leader.
JMA Agency Report 2017 Arata Okuyama, Masaya Takahashi and Hidehiko Murata Meteorological Satellite Center, Japan Meteorological Agency.
CASSINI-UVIS TEAM WEBSITE
CASSINI-UVIS TEAM WEBSITE
CASSINI-UVIS TEAM WEBSITE
CASSINI-UVIS TEAM WEBSITE
JMA Agency Report 2018 Masaya Takahashi, Yusuke Yogo and Hidehiko Murata Meteorological Satellite Center, Japan Meteorological Agency.
Process Name ___________________
CASSINI-UVIS TEAM WEBSITE
CASSINI-UVIS TEAM WEBSITE
Engineering Processes
Project Management Group
GSICS Collaboration Servers 2019
ET-WISC structure and work plan
PSS verification and validation
CASSINI-UVIS TEAM WEBSITE
Presentation transcript:

Noteworthy Items (1/2) Product Software Update Process – What is the process? – When can updates be done? – How nimble and timely can it be? – Prioritization and approval process? – More discussion is needed GOES-R Product Operations Science Support Team (POSST): Planning for GOES-R Cal/Val – AWG members should review Bob’s presentation – Review who the cal/val players are and expected roles & responsibilities – Review product maturity levels. When do we declare victory? User engagement in the process? GORWG should be used to guage user satisfaction – Is the necessary infrastructure/capabilities in place that will allow the AWG/CWG to perform their cal/val work? – Review GOES-R System-level Cal and Product Measurement Val CONOPS/OPSCON document – STAR/AWG – Please provide comments/feedback Himawari-8 Data Access – Critical data for GOES-R risk reduction activities (calibration, L2 products). High on Steve Goodman’s list. – Plenty of coordination with JMA underway to facilitate this – We need to begin process of securing the necessary storage for these data now

Noteworthy Items (2/2) Candidate Field Programs identified by Steve Goodman – Others? – These address the ADEB finding of “Insufficient Validation” – Continue GSICS cross-validation, being careful this aspect not diminished at expense of field campaigns Independent Product Evaluation – Further discussions needed on this as to how we might achieve this ABI Version 2 SRFs are now available – CRTM updates needed (Frank P. to check) AHI-8 SRFs – Verify if available SRFs are latest version (Frank P) AWG now has been given access to Harris Product Software – AWG scientists need to familiarize themselves with it – Can it be integrated within AIT framework? Will be pursued. Validation Tools – AWG presentations showed many tools to validate products have been developed (routine and deep-dive). Should be in good shape at launch. – Provide list of tools to POSST Other items?

Actions Schedule a meeting to discuss software update process (S. Kalluri/J. Daniels) AWG teams review Cal/Val Plan Volume2 (L2 Products) and provide any updates for their products Check if CRTM updates are needed as a result of updated ABI SRFs (F. Padula) Check if AHI SRFs on JMA site are the latest version (F. Padula) Send AWG team leads JMA presentations on AHI (J. Daniels) AWG to provide a list of its product validation tools to Dave Pogorzala Others?

Thank You! To all of our presenters Attendees