1 14th CAA Cross-Calibration meeting, York, 5-7 Oct 2011 STAFF CAA products & Cross-Calibration activities Patrick ROBERT & STAFF Team 5) STAFF-SC CWF.

Slides:



Advertisements
Similar presentations
LIGO-G Z Update on the Analysis of S2 Burst Hardware Injections L. Cadonati (MIT), A. Weinstein (CIT) for the Burst group Hannover LSC meeting,
Advertisements

Status of data production and delivery. 2 17th CAA CrossCal Meeting – 25 March Status of dataset delivery 2.Status of data production pipeline.
CAA 10th Cross Calibration Workshop, Paris, France, 2-4th Nov CLUSTER / STAFF Action items C. Burlaud, P. Robert, M. Maksimovic, N. Cornilleau-Wehrlin,
STAFF Report. 1.Status of data delivery 2.Delivery Plan 3.Status of data pipeline 4.STAFF/FGM cross calibration 5.Conclusions 2 15th Cross-Calibration.
STAFF-SC / FGM Comparison I. Spectrograms comparison II. Average spectra comparison III. Wave Forms comparison IV. Noise Level Conclusions Cross_Calibration.
FGM report 10 th Cross calibration workshop Elizabeth Lucek, Patrick Brown, Chris Carr, Tim Oddy, André Balogh I mperial College London November 2009.
FGM report 9 th Cross calibration workshop Elizabeth Lucek, Patrick Brown, Paul French, Chris Carr, Tim Oddy, André Balogh I mperial College London March.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
11 14th CAA Cross-Calibration meeting, York, 5-7 Oct 2011 STAFF CAA products & Cross-Calibration activities Patrick ROBERT & STAFF Team 5) STAFF-SC CWF.
1 10th CAA Cross-Calibration meeting, Paris, 2-4 November 2009 STAFF/SC cross-calibration activities Patrick ROBERT, C. Burlaud & STAFF Team 2) The Calibrated.
0. Short reminder of STAFF-SC and STAFF-SA experiment I. status of open action items II. status of data production III. status of calibration IV. status.
Planck Science Team – UniMi-Milano – 02 – 04 November 2005 Andrea Zacchei / Davide Maino Planck ST #25 – UniMi, November 2005 Inputs from: SISSA,
CAA 12th Cross-cal meeting Toulouse Oct STAFF status report N. Cornilleau-Wehrlin,P. Robert, V. Bouzid, and STAFF team.
GIST 19: GGSPS status Status of GGSPS development and operations Andy Smith GGSPS software project manager.
Comparison of STAFF-SA and WBD Magnetic components of intense whistler-mode chorus Prepared by Ondrej Santolik 14th CAA Cross-Calibration meeting, York,
CAA 9th Cross-Calibration Workshop, Cambridge, England, 25th-27th March CLUSTER / STAFF ● status of calibration and archiving activities ● archiving.
CLUSTER/STAFF DATA at CAA. 11th Cross-Calibration Meeting, 7-9th April 2010, Goslar. C. Burlaud, P. Robert, O. Santolik, N. Cornilleau-Werhlin, P. Canu,
B. Caron, G. Balik, L. Brunetti LAViSta Team LAPP-IN2P3-CNRS, Université de Savoie, Annecy, France & SYMME-POLYTECH Annecy-Chambéry, Université de Savoie,
STAFF Report Patrick Robert, Rodrigue Piberne & STAFF team.
1 12th CAA Cross-Calibration meeting, Toulouse, Oct 2010 STAFF/SC Calibration & Cross-Calibration activities Patrick ROBERT & STAFF Team, LPP 2)
17/09/19991 Status of the  Dalitz analysis Paolo Dini Luigi Moroni Dario Menasce Sandra Malvezzi Paolo Dini Luigi Moroni Dario Menasce Sandra Malvezzi.
STAFF Report Prepared by R. PIBERNE. 2 1.Status of software development 2.Status of Experiment Calibration / Cross Calibration 3.Status of dataset delivery.
WHISPER action items Gábor Facskó, Jean-Gabriel Trotignon,Séna Kougblénou, Xavier Vallières, Guillaume Lointier LPC 2 E/CNRS, Orléans, France 10th CAA.
1 CAA 2009 Peer Review, Jesus College, Cambridge, UK, March CAA Peer Review: Selected Recommendations.
Feb. 3, 2007IFC meeting1 Beam test report Ph. Bruel on behalf of the beam test working group Gamma-ray Large Area Space Telescope.
Analysis of IMS Data By Ed Sittler CAPS Team Meeting #28 Marseille, France July 26-28, 2004.
DAA PEACE Status A. Fazakerley, B. Mihaljčić, I. Rozum, A. Lahiff, G. Watson, D. Kataria UCL Department of Space and Climate Physics Mullard Space Science.
October 2, 2008 TAC Texas Nodal Market Implementation: Program Update Ron Hinsley.
9 th CAA Cross-Calibration Workshop, Jesus College, Cambridge, UK, March /17 CAA Graphics: Pre-generated/On-demand Panels and Cross-Calibration.
CAA 8th Cross-Cal meeting Kinsale (Ireland), 28 Oct 2008 Edita Georgescu EDI Status of Calibration and Archiving Activities.
Cross-Calibration Meeting, ESTEC, February Comparison of the EDI and FGM Measurements of the Magnetic Field Magnitude Plot shown.
CAA PEACE Status A.N. Fazakerley, I. Rozum, B. Mihaljcic.
15th CAA Cross-calibration workshop CIS archiving activities report University College of London 2012, April
Cluster Active Archive Status of DWP Data Activities Simon Walker, Keith Yearby, Michael Balikhin Automatic Control and Systems Engineering, University.
14 th CAA Cross-Calibration Workshop, 5th – 7th October 2011, York, UK PEACE OPS TEAM Presented by Natasha Doss UCL Department of Space and Climate Physics.
Double Star Active Archive - STAFF-DWP Data errors and reprocessing Keith Yearby and Hugo Alleyne University of Sheffield Nicole Cornilleau-Wehrlin LPP.
Cluster Active Archive Status of DWP Data Activities Simon Walker, Keith Yearby, Michael Balikhin Automatic Control and Systems Engineering, University.
Laboratoire de Physique des Plasmas C ROSS C ALIBRATION STAFF R EPORT TH M ARCH 2015 L EIDEN Prepared by R. Piberne & R. Katra Laboratoire de Physique.
CIS Action Items 10 th Cross-Calibration Workshop Observatoire de Paris, Nov
8th Cross-calibration Workshop CIS data delivery report Kinsale – October 2008.
FGM Report 17 th Cross Calibration Workshop Chris Carr, Elizabeth Lucek, Patrick Brown, Leah-Nani Alconcel, Barry Whiteside, Tim Oddy, Peter Fox, André.
Double Star Active Archive - DWP/STAFF 1 Double Star Active Archive STAFF/DWP Keith Yearby and Hugo Alleyne University of Sheffield Nicole Cornilleau-Wehrlin.
1 11 th CAA Cross-Calibration Workshop, Hotel die Tanne, Goslar, Germany 7-9 April 2010 CAA 11 th Cross-Calibration Workshop Hotel die Tanne, Goslar, Germany.
Laboratoire de Physique des Plasmas 20 TH CAA CROSS-CAL M EETING CLUSTER-STAFF REPORT O CTOBER 2014 G ÖTTINGEN The STAFF Team Laboratoire de Physique.
DAA Status/Progress B. Mihaljčić, A. Fazakerley, G. Watson, C. Anekallu UCL Department of Space and Climate Physics Mullard Space Science Laboratory 21.
WHISPER report whisper team 16th CAA Cross-Calibration workshop Toulouse, France, 7-8 November 2012 CENTRE NATIONAL DE LA RECHERCHE SCIENTIFIQUE Laboratoire.
Status of CIS Calibration Work Iannis Dandouras and the CIS Team presented by: Harri Laakso 3 rd CAA Cross-Calibration Meeting MSSL, October 2006.
CAA PEACE Status PEACE Operations Team Presented by Iryna Rozum MSSL Cross-Calibration Meeting, Uppsala, Sweden, April 2011.
1 CAA 20 th Cross Calibration Meeting, MPS, Gottingen 16th Oct 2014 CAA Cross Cal Meeting Oct 2014 Pipeline Automation Chris Perry.
Quality Control of Soil Moisture and Temperature For US Climate Reference Network Basic Methodology February 2009 William Collins USCRN.
WEC meeting TED status and WEC timing.
DAA Status/Progress B. Mihaljčić, A. Fazakerley, N. Doss, G. Watson UCL Department of Space and Climate Physics Mullard Space Science Laboratory 18 th.
21st CAA Cross Calibration Workshop Leiden, March 2015 WHISPER report WHISPER team LPC2E/CNRS.
26th Oct 2006CAA cross cal meeting, MSSL RAPID Calibration Status RAPID team.
FGM Report 21 st Cross Calibration Workshop Chris Carr, Patrick Brown, Leah-Nani Alconcel, Tim Oddy, Peter Fox Imperial College London 24 March 2015.
14 th CAA Cross-calibration Workshop CIS archiving activities York October 5-7, 2011.
Double Star Active Archive - STAFF- DWP 1 K.H. Yearby, S.N. Walker, M. Balikhin University of Sheffield.
Cluster Active Archive
Status Report of EDI on the CAA
Chapter 7 Process Control.
LFR first PFM calibration results
16th CAA Cross-calibration Workshop
10th CAA Operations Review Annual Report of the CIS Experiment
Cluster Active Archive – Wideband data BM2 mode
1. Introduction: general information
20th CAA/DAA Cross Calibration Meeting
H. Rème, I.Dandouras and A. Barthe IRAP, Toulouse, France
Cluster Active Archive 1st Operations Review May 16-17, 2006
RCM Turbo SQL Version.
Annual Report of the DWP Experiment 9th CAA Operations Review
Presentation transcript:

1 14th CAA Cross-Calibration meeting, York, 5-7 Oct 2011 STAFF CAA products & Cross-Calibration activities Patrick ROBERT & STAFF Team 5) STAFF-SC CWF 0) STAFF management 1) STAFF-SC DWF 4) STAFF Complex Spectra 8) Conclusions 2) STAFF-SC new calibration tables 3) STAFF-SC/FGM new comparisons 6) STAFF-SA PPP 7) STAFF-SC -EFW timing / Poynting vector

2 ● To be reprocessed, because some important information was missing. ● Corinne Burlaud leaved the team at the end of September ) STAFF management 1) STAFF-SC DWF ● At the end of September 2011, Rodrigue Piberne is not still hired !!! ● Block status has been added to indicate a true time or an interpolated time. ● The whole L1 data base will be remade with same Ted version and Tcor ON (given in DWF files). ● A part of the software has been re-written to be clearer and more efficient : - factor 2.5 on C decommutation program. - factor 11 (NBR) or 7 (HBR) for TFN program producing interpolated DWF. ● ONE YEAR without ESA support due to administration problems in France. ● A new software is currently used to produce DWF. 14th CAA Cross-Calibration meeting, York, 5-7 Oct 2011

3 2) STAFF-SC new calibration tables ● A great effort has been done by the technical staff to correct the transfer function of S/C 2,3 & 4. Previous bad estimate was due to a distortion (with time) of the Helmholtz's coils devices used to estimated the transfer function. ● For S/C1, there is nothing to do (FM5, spare of 1 st mission). Average of 3 other will be taken. ● Technical staff has computed a correction function to apply to the cal tables. ● New calibration system is currently updated for further mission (MMS…). ● Preliminary results are given hereafter.

4 3) STAFF-SC/FGM new comparisons FGM STAFF FGM STAFF 4° unchanged 10% to 1%, great ! CLUSTER / Tango (#4) 2001 Sep 23 Old cal table Corrected cal table 14th CAA Cross-Calibration meeting, York, 5-7 Oct 2011

5 3) STAFF-SC/FGM new comparisons (suite) CLUSTER / Tango (#4) 2001 Sep 23 Wave packet at 6 Hz (TF corrected) 4° unchanged 1% on DC 14th CAA Cross-Calibration meeting, York, 5-7 Oct 2011

6 3) STAFF-SC/FGM new comparisons (suite) CLUSTER / Tango (#4) 2001 Sep 23 Wave packet at 1 Hz (TF corrected) 14th CAA Cross-Calibration meeting, York, 5-7 Oct ° unchanged 1% on DC FGM STAFF

7 14th CAA Cross-Calibration meeting, York, 5-7 Oct ) STAFF-SC/FGM new comparisons (suite) CLUSTER / Tango (#4) 2001 Sep 23 Wave packet at 1 Hz (TF corrected) 1.1% shift (3.3nT/296nT)

8 14th CAA Cross-Calibration meeting, York, 5-7 Oct 2011 ● software ready and optimized. ● starting production as soon as new DWF will be available. 5) STAFF-SC CWF 4) STAFF Complex Spectra ● to be reprocessed with new cal tables, as corresponding to graphical products. ● priority are: new DWF, CWF, new CS, new graphical products, year after year.

9 ● years 2001 & 2002 are delivered. Few days failed the CAA validation and will be reproduced as soon as possible. ● years 2003, 2004, 2005, 2006 & 2007 are produced. These years need further completion and validation to be delivered. ● due to several bugs and problems encountered with the computer dedicated to the production of these data, production was slower than expected. However, we still think that we can delivered data on time. 14th CAA Cross-Calibration meeting, York, 5-7 Oct ) STAFF-SA PPP ● study to synchronize STAFF and EFW L2 data is in progress. (Y. Khotyaintsev, P. Robert, B. Grison, A. Tenerani) 7) STAFF-SC -EFW timing / Poynting vector Poynting vector computation has been done with correct results but some more work remain to be done.

10 ● production chain of DWF has been entirely revised and optimized, with new inputs. Production will start at very short term. DWF STAFF-EFW timing ● Poynting vector computation has been done with correct results but some more work remain to be done. Manpower ● sudden C. Burlaud leave has desorganized the team but a special effort has been done to continue activities and software development. Nevertheless, one year without external support was very hard to live. SA PPP ● despite several bugs and computer problems, production software is finally operational and delivery will follow as soon as validation will be done. 14th CAA Cross-Calibration meeting, York, 5-7 Oct ) Conclusions (1) CWF ● despite a lack of dedicated manpower, CWF software has been successfully optimized and is ready for production, immediately after new DWF

11 Conclusion (2) ● Sensitivity, noise instrument, minimum signal recordable versus frequency, etc… have to be defined accurately (already planned action). ● Cross calibration between STAFF-SC/HBR and STAFF-SA must be refreshed after STAFF-SC transfer function correction,. ● Continuity of sensitivity, noise instrument etc… must be checked between STAFF-SC and STAFF-SA. using recent special Burst mode operations Don’t forget: many things remain to be done (but with low priority): Roproc software ● Allow calibration of DWF, spectrograms computation, wave polarisation parameters etc... (used to produce plots available on ) ● works on STAFF-SC L1, L2, FGM CAA data ● Allow computation of Curl(B), div(B) etc... And many processing on FGM data ● available (exe files) on Windows, Linux/64, Linux32, Mac/Darwin is license free THANK YOU 14th CAA Cross-Calibration meeting, York, 5-7 Oct 2011

12