Date Event Global Design Effort 1 GDE CCB Remarks on  GDE Meeting, Vancouver, July, 2006 Nobu Toge (CCB/KEK)

Slides:



Advertisements
Similar presentations
Participation Requirements for a Patient Representative.
Advertisements

N.Toge on SB20091 SB2009 Rebaselining Proposal Document - How do we get it done? /10/2 N.Toge (KEK) for SB2009 Efforts.
Participation Requirements for a Guideline Panel PGIN Representative.
Considerations on ILC Crossing Angle K. Yokoya LCWS13, BDS, Tokyo Univ. 2013/11/12 LCWS Yokoya1 Motivation Gamma-gamma collider CLIC.
Summary of wg2a (BDS and IR) Deepa Angal-Kalinin, Shigeru Kuroda, Andrei Seryi October 21, 2005.
BDS GDE context LC-ABD2 : WP4 - Beam Line Design 12 th April 2007, LC-ABD Plenary, RHUL Deepa Angal-Kalinin ASTeC, The Cockcroft Institute.
Calice Meeting DESY 13/2/07David Ward Guidelines for CALICE presentations Recently approved by the Steering Committee.
GDE Meeting B Barish 16-Aug-05 The GDE – who, what and how? The BCD – what is it? Internal Organization toward BCD What do we want out of Snowmass? How.
D. Peterson, “WWS R&D Panel Project Registry”, ALCPG, Snowmass, 20-August World Wide Study Detector R&D Panel Project Registry Web Site web site:
Machine-Detector Interface MDI Panel Report MDI Panel is one of several World-Wide Study (WWS) panels (R&D, Detector costing, MDI, 2 IRs) Interim panel.
PowerPoint Presentation by Charlie Cook Copyright © 2004 South-Western. All rights reserved. Chapter 7 System Design and Implementation System Design and.
Project Execution.
Problem solving in project management
Optimism R&D to be resumed! Three beam tests planned at Kek, –Hybrid target (KEKB Linac) –Liquid target (ATF Linac) –Boron-Nitride Window (KEKB) –(Starting.
This chapter is extracted from Sommerville’s slides. Text book chapter
Dec. 2005E-upgrade GDE Frascati1 “Energy Upgrade Scenario TG” Report L.Lilje, T.Raubenheimer and N.Toge Full Report:
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
1 Framework Programme 7 Guide for Applicants
BASIC IRRS TRAINING Lecture 7
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives The Mission Report Purpose and objectives What is not needed? Evolution of the.
{ The writing process Welcome. In the prewriting stage the follow must be considered:   factual information pertaining to topic   clear definition.
Charge to the Workshop (and a report from WWS) Hitoshi Yamamoto July 11, 2005 ACFA8, Daegu, Korea.
Lecture 11 Managing Project Execution. Project Execution The phase of a project in which work towards direct achievement of the project’s objectives and.
ILC BCD Crossing Angle Issues G. A. Blair Royal Holloway Univ. London ECFA ILC Workshop, Vienna 14 th November 2005 Introduction BCD Crossing Angle Rankings.
Valencia GDE Global Design Effort 1 CCB Report at Valencia GDE Meeting Nobu
 Introduction Introduction  Contents of the report Contents of the report  Assessment : Objectives OutcomesObjectivesOutcomes  The data :
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
Regular process for global reporting and assessment of the state of the marine environment, including socio-economic aspects Guidance for Authors.
27-March-10 LCWS10 - Beijing Global Design Effort 1 Barry Barish LCWS10 - Beijing 27-March-10 “Cost Containment” for the TDR.
Presented by CIDA on behalf of the Task Team on Multilateral Effectiveness.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
Revisions to Primacy State Underground Injection Control Programs Primacy State Implementation of the New Class V Rule.
Global Design Effort DR Session Introduction S. Guiducci (LNF) ILC10, Beijing 27 March 2010.
Report from ILCSC Shin-ichi Kurokawa KEK ILCSC Chair GDE meeting at Frascati December 7, 2005.
Relay DG Report (for TGm Closing Report) IEEE Presentation Submission Template (Rev. 9) Document Number: C80216m-09_2134 Date Submitted:
Systems Development Life Cycle
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
Global Design Effort - CFS GDE Plenary Session 1 LCWS10 GDE Plenary Session SB 2009 ILC CONVENTIONAL FACILITIES AND SITING GROUP A. Enomoto, V.
GDE questions, including one or two IRs Grahame Blair, Tomo Sanuki, Andrei Seryi for WG4 Snowmass, CO, August 25, 2005 Grahame Blair, Tomo Sanuki, Andrei.
1 Chapter 12 Configuration management This chapter is extracted from Sommerville’s slides. Text book chapter 29 1.
Introduction and Charge Barry Barish GDE Meeting Frascati 7-Dec-05.
ILC D RAFT P ROJECT S CHEDULE K LYCLUSTER 500GeV K Foraz & M Gastal ILC Mechanical & Electrical Review and CFS Baseline Technical Review Many thanks to.
6-7 April 06 MAC Review Global Design Effort 1 Configuration Control – Change Control Board (CCB) Report Nobu Toge GDE KEK.
Plan to go forward Peter Wilson SBN Program Coordinator 27 September 2014.
(BDS) Lattice Integration Process at ILC Benno List DESY –IPP– BDS Lattice Webex Meeting B. List, (BDS) Lattice Integration at ILC 1.
On S1Global Writeup S1G Writeup Meeting Nobu Toge 1.
Inputs from GG6 to decisions 2,7,8,15,21,27,34 V.Telnov Aug.24, 2005, Snowmass.
Organizational Structures Nonfiction texts have their own organization and features Writer use text structures to organize information. Understanding.
EVALUATION OF THE SEE SARMa Project. Content Project management structure Internal evaluation External evaluation Evaluation report.
Date Event Global Design Effort 1 CCB Report GDE Meeting, Vancouver, July, 2006 Nobu Toge KEK/GDE.
Goals of the ILC-Asia Meeting at Pohang Fumihiko Takasaki PAL, Feb. 17, 2006.
Global Design Effort1 September 20-22, 2006 MAC Review Response to 1 st MAC Mtg Barry Barish GDE.
LNF Frascati, July 8, 2011 DR Technical Baseline Rev. Global Design Effort 1 DR Technical Baseline Review INFN LNF · Frascati, Italy July 7 and 8, 2011.
RD’s Report SiD Group Sakue Yamada December 14, 2011 (remote participation) 2011/12/141SiD-meeting Sakue Yamada.
Presentation of Nominations to the World Heritage Committee by the Advisory Bodies Presentation by ICOMOS Paris, January 2013.
1 Status of the BCD GDE Area System Leaders Meeting (Jan.19-20, 2006) Nobu Toge (KEK)
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
AWLC14 - FERMILAB May 12-16, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, A Enomoto, J Osborne.
Status of GDE BDS Design Talk based on several talks presented by BDS area leaders Andrei Seryi, Hitoshi Yamamoto, Deepa Angal-Kalinin at and after Vancouver.
Implication of gamma-gamma on 14mr tunnels discussion (questions for discussion with WG-C and WG-A) Valery Telnov Budker INP IRENG07, Sept.19, 2007, SLAC.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Regular process for global reporting and assessment of the state of the marine environment, including socio-economic aspects Guidance for Authors.
Technical Design Report preparation
IRRS REFRESHER TRAINING Lecture 4
Sponsor Ballot Comment Resolution
TV White Space Coexistence Plan
Presentation transcript:

Date Event Global Design Effort 1 GDE CCB Remarks on  GDE Meeting, Vancouver, July, 2006 Nobu Toge (CCB/KEK)

Date Event Global Design Effort 2 CCB Basics Members: C.Pagani, G.Blair, D.Schulte, T.Markiewicz, S.Mishra, W.Funk, K.Kubo, M.Kuriki, N.Toge Wiki main (with official procedure): d_home d_home Change History: d_history d_history Public Communications: Leaders of GDE Area Groups, Global Groups, EC and Board Chairs can submit change requests. Classification: 0 – trivial, 1 – light, 2 – heavy.

Date Event Global Design Effort 3 BCD History #SubmittedAreaRequesterClassStatusDate /6/12LinacAdolphsen1Accepted2006/7/ /5/17BDSSeryi1Returned2006/7/ /4/21Param/LayoutPaterson, Toge1Accepted2006/5/ /4/20BDSSeryi0Accepted2006/4/ /4/13RTMLTenenbaum1Accepted2006/4/ /3/22White PaperTogeFixed2006/3/ /3/20RTMLTenenbaum1Accepted2006/3/ /3/4CF/SEnomoto0Accepted2006/3/ /2/28ParamsYokoya1Accepted2006/3/ /2/24RTMLTenenbaum1Accepted2006/3/ /2/7DRWolski1Accepted2006/2/ /2/4OPSHimel0Accepted2006/2/ /1/27RTMLTenenbaum1Not Accepted2006/2/ /12/20CF/SHuedemAccepted2005/12/23

Date Event Global Design Effort 4 In This Talk I will explain – –The logic of internal discussion that CCB followed with regards to the  change request of May, 2006, –Which led to the CCB conclusion of “returning” the  change request, on the basis of lack of system-wide analysis + system-wide proposal for this “Option”. –However, it is NOT that CCB concluded “  NEVER”. The door can be knocked and it will open, when you bring in the material that we said we need.

Date Event Global Design Effort 5 BDS Change Config Request on  Submitted by A.Seryi on May 17, Classified as Class-1 Requester: –Stated that  requires  cross > 25mrad + a 250m long gas/water beam dump. This is not compatible with e+e- beam dump requirements. –Stated that if it is desirable to be able to alternate e+e- vs  runs. Hence, it is desirable to find a configuration that allows for the simultaneous presence of both these dumps.

Date Event Global Design Effort 6 BDS Change Config Request on  (2) Requester (continued): –Suggested that either the baseline  cross of 20 mrad or the alterative configuration crossing angle of 14 mrad could allow future civil modifications to the tunnel geometry. This geometry, with relatively modest and reversible changes to beamline and detector position, would permit an extraction line dedicated to  at 25mrad. –Dismissed modifying the 2mrad baseline crossing angle layout, as being akin to digging a new (3rd?) interaction region (It can be left as being dedicated to e+e- runs).

Date Event Global Design Effort 7 Examination from Scientific and Technical Standpoint (1) The reference  Snowmass Summary Report –Provides an outline of the  scheme that mainly relates to production of high-energy photons through the laser-beam interactions. –More systematic and thorough evaluations and design proposals are necessary in the areas of beam parameters, beam sources (if they are affected by gamma-gamma specific requirements), operation mode, hardware equipment related to high-power laser, and others. –This Change Request is the first of the gamma- gamma-related request which attempts to bring in substantial inputs to BCD.

Date Event Global Design Effort 8 Examination from Scientific and Technical Standpoint (2) H.Yamamoto and F.Richard (MDI) contributed remark stating –That discussion on the gamma-gamma option has not yet been done extensively. –That, however, the proposed description of the BDS upgrade for gamma-gamma would be very useful for forming a consensus on how to consider the gamma-gamma option. A.Enomoto (CF/S) contributed remarks which offered –A rough evaluation of the size of the gamma-gamma beam dump together with his assessment on the required tunneling work. –It was indicated that the cost impact in terms of CF/S work for the additional gamma-gamma dumps is consistent with a Class-1-type configuration change. –However, this estimate does not yet include the work associated with installation of beamline equipment and any other work that may be required in other areas of ILC, nor studies on the schedule implications of e+e- vs  change overs.

Date Event Global Design Effort 9 Examination from the Configuration Control Standpoint With the given focus of GDE efforts on the Reference Design Report and the first-round costing associated with it, –This Change Request ought to be flagged as “an entry for future discussion for the upgrade/alternative-type issues”. CCB finds that it is its duty to reorganize and improve its scheme of classifying incoming Change Requests, and to more adequately treat and tag similar cases in the near future. –CCB notes the fact that while a reference has been made on the desirability of  option by the “Parameter Subcommittee Report” submitted to ILCSC in 2003, little progress has been made on studies of the gamma-gamma case at LC from a system integration viewpoint. As mentioned earlier, no discussion exists in the present BCD for the operating parameters with gamma-gamma, for instance, whether as a Baseline or an Alternative configuration. Therefore, this Change Request submitted by the Leaders of the BDS Area Group is in an unfortunate position where it has to stand out without the backup of substantial supporting design materials in other parts of BCD.

Date Event Global Design Effort 10 CCB Statement on  Change Request -- Conlusions The CCB expresses its whole-hearted gratitude to the Leaders of the BDS Area Group, Andrei Seryi and his colleagues, –for their attempt at examining the  implications to BDS and for offering possible scenarios for revising the BDS to accommodate gamma-gamma running. However, CCB notes the fact that an outline description does not yet exist for the design studies of the gamma-gamma option within the present BCD. –The text offered by the requesters is an important part of it, but, naturally, it does not discuss the full impact of maintaining the gamma-gamma option on the whole of the ILC project. –Nor, as is recognized with the R&D to-do list, does it include adequate input from the relevant technical systems for even the BDS specific portion. In this situation, the CCB cannot accept the proposal, as submitted, into the baseline. –It is not appropriate that technical discussion which is part of a major system upgrade with significant changes to facility capability be made unilaterally when the full impact of the change on the rest of the project is not fully known.

Date Event Global Design Effort 11 CCB Statement on  Change Request -- Conlusions Therefore, while again gratefully noting the submission, we hereby return it to the submitters while awaiting further developments on the topic, made in cooperation with the other Area, Global and Technical groups at the appropriate time. –CCB suggests that such a taskgroup, under guidance of GDE Executive Committee, could be formed in the TDR timescale. CCB also recommends the WWS group to more systematically survey the  upgrade option, including detector integration, possible impact on the interaction region and other related issues, thereby providing GDE with inputs to consider from the physics and detector perspectives. –It would be highly desirable if a rough timetable for addressing these issues is made available by the time when RDR becomes finalized. CCB acknowledges the need for reorganizing its scheme for adequately classifying incoming Change Requests on Alternative Configurations or System Upgrade Scenarios.

Date Event Global Design Effort 12 Now, What Do These All Mean? (1) First, –It is important that a serious system config baseline always gets to be made part of BC. Otherwise, that part of config baseline won’t be designed, be costed, and be built. Second, –BC is something that we (CCB) “maintain” and “evolve” for GDE. Not a Bible that is not allowed to be rewritten Can be revised, if the rest of GDE and CCB agree.

Date Event Global Design Effort 13 Now, What Do These All Mean? (2) Third, for CCB to be able to assess incorporating  option into BC –Need descriptions of system-wide picture of , eg. Parameters Beam Sources (electron/positron beams, photon beams) Baseline (+alternative) scheme for producing, controlling, diagnozing and disposing of photons and electron/positron beams. Other HW equipment of relevance –Need descriptions of system-wide implications of , eg. Who else, besides BDS, get affected by incorporation of , and how? Fourth, it looks to me that an organized effort will be required to do the work above. This point is my personal observation, somewhat being outside my capacity as CCB chair, since CCB is NOT a body to direct or coordinate the design efforts.

Date Event Global Design Effort 14 Summary I have explained – –The logic of internal discussion that CCB followed with regards to the  change request of May, 2006, –Which led to the CCB conclusion of “returning” the  change request, on the basis of lack of system-wide analysis + system-wide proposal for this “Option”. –However, it is NOT that CCB said “  NEVER”. The door can be knocked and it will open, when you bring in the material that we said we need.