WorldFIP Infrastructure E.Gousou | BE-CO |15 Oct 2014 | R2E | Maintenance | Availability.

Slides:



Advertisements
Similar presentations
Upgrading from Calibration Manager to Blue Mountain RAM
Advertisements

Chamonix 2010: January 27 th Session 6 – Radiation To Electronics: R2E Summary Radiation 2 Electronics Session th January 2010 Radiations to Electronics.
Julien PALLUEL BE/CO/FERadiation To Electronics ‘1st Combined Workshop & School-Days’ June 2nd/ 3rd Julien Palluel BE/CO/FE.
Will we still see SEEs? (a word trick game) R2E Project Meeting - draft presentation for Chamonix 2012 – 19 th January 2012 M. Calviani (EN/STI) for the.
, a rad-tol FPGA-based WorldFIP agent E. Gousiou, P.Alvarez, E.van der Bij, G.Penacoba, J. Serrano | CERN TWEPP 2011 nan FIP.
WorldFIP optical repeaters 1 | status Feb 2013: 66 repeaters ordered to HLP; never delivered Feb 2014: HLP announced eminent closure Jun 2014: 40 of the.
Survey and Alignment Equipment R2E and Availability Workshop – CERN Mateusz Sosin EN/MEF-SU.
controls Middleware – OVERVIEW & architecture 26th June 2013
CERN IT Department CH-1211 Genève 23 Switzerland t Some Hints for “Best Practice” Regarding VO Boxes Running Critical Services and Real Use-cases.
Status Report on Tier-1 in Korea Gungwon Kang, Sang-Un Ahn and Hangjin Jang (KISTI GSDC) April 28, 2014 at 15th CERN-Korea Committee, Geneva Korea Institute.
RADWG 6 TH TH OCTOBER 2012 G. Spiezia (EN/STI/ECE)
TE-MPE-EP, RD, 06-Dec QPS Data Transmission after LS1 R. Denz, TE-MPE-EP TIMBER PM WinCC OA Tsunami warning:
Radiation Tolerant Electronics New Policy? Ph. Farthouat, CERN.
TE-MPE-CP, RD, 23-Nov Summary of Radiation Induced QPS Events in LHC 2010 R. Denz TE-MPE-CP.
Summary Actel ProAsic/3E Irradiation Tests Antonio Pellegrino (work by Syracuse group) Nikhef, OT FE Architecture Mini-Review o introduction.
NanoFIP Progress Report Eva. Gousiou BE/CO-HT & the nanoFIP team RadWG 23Nov11.
MAINFRAMES.
1 Case Study – Replacing our Claims Applications Jerry Dalla Corte Vice President, Head Office Operations March 27, 2008.
Nov 28, 2013 Power Converters Availability for post-LS1 LHC TE-EPC-CCE.
Radiation Tolerant Electronics Expected changes Ph. Farthouat, CERN.
JCOP/DCS Plans for HW Upgrade A. Augustinus (ALICE), C
RADWG 4 TH TH JULY 2012 G. Spiezia (EN/STI/ECE)
R2E and Availability Workshop Interlock Systems I.Romera, M.Zerlauth, B.Todd, S.Gabourin, P.Dahlen, R.Mompo, Y.Bastian, C. von Siebenthal + many colleagues.
MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE Upgrade, IST and Powering tests of the Upgrade, IST and Powering tests of the 600A Energy Extraction Systems.
J. Pedersen, ST/EL Consolidation of the CERN technical infrastructure and civil engineering. J. Pedersen ST 6 th ST workshop, Thoiry, 1 – 3 April 2003.
J. MEKKI (1/8) 06/03/12 – RadWG meeting CNRAD plan Beam schedule – 1 st Slot Overall beam schedule for 2012 Equipments to be installed o Higher flux locations.
QPS R2E Status R2E Internal Meeting, October 24 th 2013Discussion 1 LS1 developments Digital Quench Protection insertion region magnets Delivery/installation.
CERN Converter Control Electronics Setting the Scene
TE-MPE-CP, RD, 06-Oct Radiation Induced Faults in QPS Systems during LHC run 2011 R. Denz TE-MPE Technical Meeting October 6 th.
R2E Availability October 15 th 2014 Experience from Past LHC and Injector Operation and scaling to the future G. Spiezia.
LS1 Review P.Charrue. Audio/Video infrastructure LS1 saw the replacement of BI and RF analog to digital video transport Was organised in close collaboration.
BE-CO Presentation FESA and O/S Support Post-ACCOR renovations until LS2 Front-End Platforms BE-BI TB, May 21 st, 2015 M.Vanden Eynden on behalf of BE-CO.
OPERATIONS REPORT JUNE – SEPTEMBER 2015 Stefan Roiser CERN.
Radiation monitoring: what do we have and what do we need? M. Calviani, M. Brugger, P. Peronnard, J. Saraiva, G. Spiezia (EN/STI) R2E/Availability Workshop.
AB/CO - TC – Cl.Deh. HT section 1 Lessons from Point 8 HW installation Better idea of Where, When and … What ! Periodic meeting (every 2 weeks)
PS-EA Update RadWG August 23 rd 2012 Radiation 2 Electronics (R2E) LHC Activities RadWG August 23 rd 2012 PS East Area Update M. Brugger on behalf of the.
LHC Cryogenics Schneider PLCs: Radiation tests at H4IRRAD Mitigation measures M. Calviani, M. Brugger, G. Spiezia (EN/STI) E. Blanco, J.M. Beckers, D.
R2E Mitigation Project Review November 21 st – 24 th 2011 Intense program (link)link A few facts/highlights per session/task Calculations & Monitoring.
Report on Controls, TCC meeting 23 th June 2005 – Cl.Dehavay & Co - AB/CO/HT 1 Claude DEHAVAY - CERN/AB/CO/HT Installation Readiness Report - Controls.
RADWG Meeting April 2015 Salvatore Danzeca EN/STI/ECE.
Feedback on Controls from 2015 Operation Marine Pace, on behalf of BE-CO. Evian Workshop Dec 2015 Marine Pace, BE-CO -Evian Workshop 2015.
TE-MPE-CP, RD, 28-Sep Problems with QPS DAQ Systems During LHC Operation, 1 st Results from 2010 CNRAD Tests R. Denz TE-MPE-CP.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
CERN Converter Control Electronics Strategy for LHC Machine Electronics : Limitations & Risks
Mar 26, 2014 FGClite Power Control TE-EPC-CCE.
R2E/Availability Workshop Report - RadWG October 22 nd 2014 R2E/Availability Workshop 2014 October th 2014 R2E/Availability Workshop RadWG - Brief.
Operations Coordination Team Maria Girone, CERN IT-ES GDB, 11 July 2012.
V4.
nanoFIP 5th WorldFIP Insourcing Meeting Progress Report
Technical Services: Unavailability Root Causes, Strategy and Limitations Data and presentation in collaboration with Ronan LEDRU and Luigi SERIO.
JTAG feature nan FIP Stephen Page TE/EPC-CC
CONS and HL-LHC day Analysis of needs from BE-CO
Cryo equipment strategy in the R2E context
nan FIP The project April Eva. Gousiou BE/CO-HT
New developments and inventory
Outline Introduction to LHC Power Converters Remaining Inventory Observed Availability New inventory – FGClite Cumulative & SEE Effects Maintenance.
Current Status of ITER I&C System as Integration Begins
Javier Serrano CERN AB-CO-HT 29 February 2008
RADMON Salvatore Danzeca (EN/STI) on behalf of the R2E Project and RADMON team Thanks to all the RADMON Team!
6th WorldFIP Insourcing Meeting
Preventive Maintenance Program – TabWare
Renovation of the Accelerators Controls Infrastructure and its Assets Management Asset and Maintenance Management Workshop November 14th, 2013 Cl.Dehavay.
What does “Zero Client” means?
Application and content management framework for railway operators
CERN Windows Roadmap Tim Bell 8th June 2011.
LS BI Jóhann Einarsson Solution lead LS BI
Comparison of LAN, MAN, WAN
MICROFIP-Do we need further tests? 28th June 2011
Production Manager Tools (New Architecture)
Radiation Working Group RADWG
Presentation transcript:

WorldFIP Infrastructure E.Gousou | BE-CO |15 Oct 2014 | R2E | Maintenance | Availability

WorldFIP Infrastructure | Architecture E.Gousou | BE-CO |15 Oct 2014 | R2E | Maintenance | Availability

front-end E.Gousou | BE-CO |15 Oct 2014 WorldFIP Infrastructure | Architecture master client node diagnostic node user app Cu- opt Opt -Cu Cu-Opt repeater Cu-Cu repeater Cryo, QPS, EPC,..

front-end E.Gousou | BE-CO |15 Oct 2014 WorldFIP Infrastructure | Architecture master client node diagnostic node user app Cu- opt Opt -Cu Cu-Opt repeater Cu-Cu repeater Cryo, QPS, EPC,.. Designed for reliability | Solid results Run1 | Run1 Lessons learnt

front-end E.Gousou | BE-CO |15 Oct 2014 WorldFIP Infrastructure master client node diagnostic node user app Cu- opt Opt -Cu Cu-Opt repeater Cu-Cu repeater Cryo, QPS, EPC,.. Designed for reliability | Solid results Run1 Lower rad-tolerance of newer uFIP nodes Obsolescence of WorldFIP components | Run1 Lessons learnt

front-end E.Gousou | BE-CO |15 Oct 2014 WorldFIP Infrastructure | New Developments master client node diagnostic node user app Cu- opt Opt -Cu Cu-Opt repeater Cu-Cu repeater Cryo, QPS, EPC,.. Lower rad-tolerance of newer uFIP nodes Obsolescence of WorldFIP components | Run1 Lessons learnt

front-end E.Gousou | BE-CO |15 Oct 2014 WorldFIP Infrastructure | New Developments client node diagnostic node user app Cu- opt Opt -Cu Cu-Opt repeater Cu-Cu repeater Cryo, QPS, EPC,.. Issues of master board in newer front ends master [Currently: short term solution] Lower rad-tolerance of newer uFIP nodes Obsolescence of WorldFIP components [2015 Q4: proto of new master]

front-end E.Gousou | BE-CO |15 Oct 2014 WorldFIP Infrastructure | New Developments client node diagnostic node user app Cu- opt Opt -Cu Cu-Opt repeater Cu-Cu repeater Cryo, QPS, EPC,.. Issues of master board in newer front ends master [Currently: short term solution] Lower rad-tolerance of newer uFIP nodes Obsolescence of WorldFIP components [2015 Q4: proto of new master] [ ] master development [2016] finalizing insourcing of repeaters [2017] replacement of FielDrive/TR Roadmap Complete insourcing of the technology [ ] client node

front-end E.Gousou | BE-CO |15 Oct 2014 WorldFIP Infrastructure client node diagnostic node user app Cu- opt Opt -Cu Cu-Opt repeater Cu-Cu repeater Cryo, QPS, EPC,.. master [Currently: short term solution] [2015 Q4: proto of new master] [ ] master development [2016] finalizing insourcing of repeaters [2017] replacement of FielDrive/TR Roadmap Complete insourcing of the technology [ ] client node | Radiation-tolerance: nanoFIP | New Developments

E.Gousou | BE-CO |15 Oct 2014 WorldFIP Infrastructure Location RR|MB|MQ [95%] TID OK till 2035! [>400Gy] Run2+Run3 Tech ProASIC3 HL-LHC < 1 SEU/y SEE Stock 10’000 [> 100% current inventory] No need for relocations | no preventive maintenance [ageing tests to be scheduled] < 1 SEU [till end of Run3] Stock of 10’000 nanoFIP units enough till 2035 [climate controlled storage] In case of ProASIC3 obsolescence -> IGLOO2 client node [system of 1’000 units] | Radiation-tolerance: nanoFIP

E.Gousou | BE-CO |15 Oct 2014 WorldFIP Infrastructure Location RR|MB|MQ [95%] OK till 2035! [>400Gy] Run2+Run3 Tech ProASIC3 HL-LHC < 1 SEU/y SEE Stock 10’000 [> 100% current inventory] < 1 SEU [till end of Run3] client node [system of 1’000 units] | Radiation-tolerance: FielDrive/TR | Radiation-tolerance: nanoFIP No need for relocations | no preventive maintenance [ageing tests to be scheduled] Stock of 10’000 nanoFIP units enough till 2035 [climate controlled storage] In case of ProASIC3 obsolescence -> IGLOO2 TID | NIELTID

E.Gousou | BE-CO |15 Oct 2014 WorldFIP Infrastructure Location RR|MB|MQ [95%] TID | NIEL OK till 2035! [>400Gy] [>6e12] Tech CMOS+ Passive Stock 4’000 [~60% current inventory Users+BE/CO] FielDrive/TR Plans for complete replacement of FielDrive/TR [2017] Run2+Run3HL-LHC < 1 SEU/y SEE < 1 SEU [till end of Run3] [system of 1’000 units] | Radiation-tolerance: FielDrive/TR No need for relocations | no preventive maintenance [ageing tests pending] Components still available for purchase

E.Gousou | BE-CO |15 Oct 2014 WorldFIP Infrastructure Location RR|MB|MQ [95%] OK till 2035! [>400Gy] Tech CMOS Stock 4’000 [~60% current inventory Users+BE/CO] FielDrive/TR Run2+Run3HL-LHC < 1 SEU/y SEE < 1 SEU [till end of Run3] [system of 1’000 units] | Radiation-tolerance :FielDrive/TR | Radiation-tolerance: repeater Plans for complete replacement of FielDrive/TR [2017] No need for relocations | no preventive maintenance [ageing tests pending] Components still available for purchase TID | NIEL

E.Gousou | BE-CO |15 Oct 2014 WorldFIP Infrastructure Location above MB OK till 2035! [>300Gy] Tech Antifuse Antilatch-up Stock 60 [20%] Run2+Run3HL-LHC < 1 SEE/y SEE < 1 SEE [till end of Run3] [system of 200 units] | Radiation-tolerance: repeater No need for relocations | no preventive maintenance Plan to produce more at CERN [2016] In case of Antifuse obsolescence -> ProASIC3 -> IGLOO2 TID | NIEL

E.Gousou | BE-CO |15 Oct 2014 WorldFIP Infrastructure | Radiation-tolerance: repeater Location above MB OK till 2035! [>300Gy] Tech Antifuse Antilatchup Stock 60 [20%] Run2+Run3HL-LHC < 1 SEE/y SEE < 1 SEE [till end of Run3] [system of 200 units] No need for relocations | no preventive maintenance Plan to produce more at CERN [2016] In case of Antifuse obsolescence -> IGLOO2 TID | NIEL | Run2 Inventory

E.Gousou | BE-CO |15 Oct 2014 WorldFIP Infrastructure | Run2 Inventory masters Cu-Opt repeater nodes diagnostic node Cu-Cu repeater POQPSCryoRadMonSurveyBI ’700 2’200 2’

E.Gousou | BE-CO |15 Oct 2014 WorldFIP Infrastructure | Run2 Inventory masters Cu-Opt repeater nodes diagnostic node Cu-Cu repeater POQPSCryoRadMonSurveyBI ’700 2’200 2’ Run2 Total Qty 300 7’

E.Gousou | BE-CO |15 Oct 2014 WorldFIP Infrastructure | Run2 Inventory masters Cu-Opt repeater nodes diagnostic node Cu-Cu repeater ’700 2’000 2’ POQPSCryoRadMonSurveyBI Run2 Total Qty 300 7’

E.Gousou | BE-CO |15 Oct 2014 WorldFIP Infrastructure | Run2 Inventory masters Cu-Opt repeater nodes diagnostic node Cu-Cu repeater Run2 Total Qty 300 7’ Run2 %Insourced 12% % 13% 100% 0 - 5% Partial migration to new masters during Run2

E.Gousou | BE-CO |15 Oct 2014 WorldFIP Infrastructure | Run2 Inventory masters Cu-Opt repeater nodes diagnostic node Cu-Cu repeater Run2 Total Qty 300 7’ Run2 %Insourced 12% % 13% 100% 0 - 5% 17% [70 unt] RadMon % [1100 unt] PO 0% QPS 0% Cryo 0% Survey 0% BI Partial migration to new masters during Run2

E.Gousou | BE-CO |15 Oct 2014 WorldFIP Infrastructure | Run2 Inventory masters Cu-Opt repeater nodes diagnostic node Cu-Cu repeater Run2 Total Qty 300 7’ Run2 %Insourced 12% % 13% 100% 0 - 5% 17% [70 unt] RadMon % [1100 unt] PO 0% QPS 0% Cryo 0% Survey 0% BI 100% all replacements 16% 100% Run3 %Insourced Run3 Total Qty no significant changes all replacements HL-LHC Total Qty HL-LHC %Insourced Same as Run3 16% +CRYO?+QPS?

E.Gousou | BE-CO |15 Oct 2014 WorldFIP Infrastructure | Run2 Inventory | Availability improvement masters Cu-Opt repeater nodes diagnostic node Cu-Cu repeater Run2 Total Qty 300 7’ Run2 %Insourced 12% % 13% 100% 0 - 5% 17% RadMon % PO 0% QPS 0% Cryo 0% Survey 0% BI 100% all replacements 16% 100% Run3 %Insourced Run3 Total Qty no significant changes all replacements HL-LHC Total Qty HL-LHC %Insourced Same as Run3 16% +CRYO?+QPS?

E.Gousou | BE-CO |15 Oct 2014 WorldFIP Infrastructure | Availability improvement Run1 2x Cu-Cu repeaters failure due to overheating Repeaters overheating Action: LS1 campaign for lowering their temperature Last batches of uFIP were showing a high σ, giving SEUs in LHC Client node SEUs Action: nanoFIP development; σ nanoFIP < x100 σ uFIP LS1 showed some misbehaving of the Master boards installed in newer computers Master compatibility with newer computers Action: masterFIP development

E.Gousou | BE-CO |15 Oct 2014 WorldFIP Infrastructure | Availability improvement Run1 2x Cu-Cu repeaters failure due to overheating Repeaters overheating Action: LS1 campaign for lowering their temperature Last batches of microFIP were showing a high σ, giving SEUs in LHC Client node SEUs Action: nanoFIP development; σ nanoFIP < x100 σ microFIP LS1 showed some misbehaving of the Master boards installed in newer computers Master compatibility with newer computers Action: masterFIP development | A new system? … 2035

E.Gousou | BE-CO |15 Oct 2014 WorldFIP Infrastructure | A new system? LS1Run … 2035 HL-LHC WorldFIP proven to be a reliable solution Support till the end of HL-LHC Run1Run2LS2LS3

E.Gousou | BE-CO |15 Oct 2014 WorldFIP Infrastructure | A new system? LS1Run1 … Run2LS2Run3LS HL-LHC WorldFIP proven to be a reliable solution Support till the end of HL-LHC

E.Gousou | BE-CO |15 Oct 2014 WorldFIP Infrastructure | A new system? LS1Run1 … Run2LS2Run3LS HL-LHC Do the users need a new system for HL-LHC? WorldFIP bandwidth issues? o Expansion of WorldFIP to 5Mbps o Study of a new solution | Development in a centralized way | PH collaboration

E.Gousou | BE-CO |15 Oct 2014 WorldFIP Infrastructure | A new system? LS1Run1Run2LS2Run3LS … 2035 HL-LHC Do the users need a new system for HL-LHC? WorldFIP bandwidth issues? o Expansion of WorldFIP to 5Mbps o Study of a new solution | Development in a centralized way | PH collaboration | Conclusions

E.Gousou | BE-CO |15 Oct 2014 WorldFIP Infrastructure | Conclusions Actions for even higher availability Good stock management & insourcing provide margins for maneuver if needed Expansion of WorldFIP up to 5Mbps Explore other systems Compete insourcing of the WorldFIP technology Run1 Experience WorldFIP support will be essential till the end of life of the LHC | HL-LHC Run2 & beyond BE-CO to understand users’ needs New system for HL-LHC

E.Gousou | BE-CO |15 Oct 2014 WorldFIP Infrastructure Location above MB OK till 2035! [>200Gy] Tech Antifuse Antilatchup Stock not much [plan to produce] Run2+Run3HL-LHC < 1 SEU/y SEE < 1 SEU [till end of Run3] [system of 300 units] | Radiation-tolerance diagnostic Need for dedicated tests Plan to produce more at CERN Case of Antifuse obsolescence -> IGLOO2 TID | NIEL