Task 4.2 Stave Core Assembly (Tim). Task 4.2 Outline Year 1: Design and construction of staves and stavelets suitable for 130nm ASICs which will be used.

Slides:



Advertisements
Similar presentations
Stave Vacuum Tool Tim WP4 Face to Face Liverpool, 13/11/14.
Advertisements

Stave 130 Tooling John Carrol & Tim Jones. Status First generation stave assembly tool model modified to incorporate… – Stave Geometry Length 1277mm Width.
Restructure of WP4 – provisional ideas and numbers to promote discussion Ian Wilmut.
25/06/2015Robert King, Oxford University - Graduate Seminar Series 1 Electronic speckle pattern interferometry at the SLHC.
Stator Plan & Schedule Chris Booth 2 nd March stators to construct for mid-April. One complete coil assembly recovered from ISIS drive. Coils recoverable.
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
Stave core assembly Stephanie Yang WP4 face to face meeting, Lancaster University 20 Feb 2014.
Stave Assembly (A random walk through stave construction)
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
Stave Core QC Peter Sutcliffe RAL 24 th Sept 2014.
Raw Material & Sub-Assembly QA (Tim) 25/09/14 25/09/2014Material & Sub-assembly QA1.
1 ATLAS Upgrade WP4 Face to Face meeting Liverpool June 2012 Richard French – The University of Sheffield Ian Mercer – Lancaster, Martin Gibson, John Mattheson,
US Stave Core Production D. Lynn (BNL), LBNL Mechanical Meeting, Sep
Low Mass Local Supports for the ATLAS Upgrade Inner Silicon Barrel Tracker Peter Sutcliffe University of Liverpool On behalf of the ATLAS Upgrade Inner.
Update on Alignment kit and Stave 250 frame and thoughts for Stave 130 M.Gibson (RAL) 2/5/13 1 Status of the frame for stave 250 Status of infrastructure.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Cooling loops for prototype staves Update on cooling pipes progress Confirmation of design of loop Discussion on design developments of loops for future.
WP4 Equipment Bids (Tim). Bids ATLAS – Case for the Purchase of Equipment for the Testing of Cooling Loops (£15k) – Case for the Purchase of Equipment.
March OsC Report and Restructuring WP4. OsC Report 4.1 Tapes Bus tape designs have been completed for modules with 130nm ASICs which incorporate options.
WP4 – Plans for next 6 months
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
A thermo-mechanical petal Sergio Díez Cornell Petal discussion, 24 Oct 2014.
Sils ATLAS Meeting 18-9 October 2003 Mechanics for the Barrel SCT.
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
Thermo-mechanical petal status Sergio Díez Cornell 23Jan 2015.
UK ILC Tracker Meeting Oxford 15 April Liverpool activities HV-CMOS Sensor development in HV-CMOS, benefitting from 2 year PRD grant (Matthew Buckland,
Agenda for Stave Working Mtg CH. Organization Status reports – Mechanical and material – DC-DC – Electrical test – HSIO Working sessions: DAQ, powering,
Stave Hybrid/Module Status. Modules Stave Module Building 2 Mechanical Chip Gluings Mechanical Wirebonding Electrical Chip Gluings Electrical Wirebondings.
Stave 130 Geometry Peter Sutcliffe ATLAS Strips WP4 Meeting 26 th March 14 Liverpool.
M. Gilchriese Stave Prototype Status Summary July 5, 2006.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
Local Supports to IDR Discussion ATLAS Upgrade Week November 2014.
Stave Core Thermo-mechanical and Electrical Performance Requirements (Tim) 10/07/2013Liverpool WP4 Meeting (11/7/13)1.
Frames and insertion Note: Stavelet holder (working) document available on wiki:
Stave130 Assembly Jig (Tim). Current Tooling Components – CF jig + ‘C’-channel jig & various face-sheet positioning aids It works! – Seems to produce.
Stave programme. 2 Staves recently build Stave#7 –I think is at QML –Intend was to aggressively thermally cycle and look for structural issues Stave#8.
While I’m away…. 2 I hope not this… 3 And not too much of this…
Stave production.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
UK Participation in phase-II tracker upgrade o Brief Overview of R&D work to date1 slide o Scope of Interest of UK institutes2 slides o Task list & Institute.
IBL – UniGe involvements UniGe Team : G. Barbier, F. Cadoux, A. Clark, S. Débieux, D. Ferrère, C. Husi, G. Iacobucci, M. Weber Other member (KEK): Y. Takubo.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Upgrade Review Meeting Introduction Craig Buttar University of Glasgow RAL 10/5/11.
Cooling Loop Update ATLAS W4 Sheffield Richard French The University of Sheffield + all UK contributors.
Preparations for working on Station 1 November 22, 2005.
WP2: On Detector Systems 2.1 Strip Sensors Layout Evaluation 2.2 ASICs Digital Design Evaluation Wafer Test 2.3 Hybrids Layout & Manufacture Die Attach.
Stave Tooling & Plans for Future Stave-building (Tim)
WP4 Face to Face #6, Oxford 14 th July 2011 Welding summary Richard French – The University of Sheffield.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
Thermo-mechanical petals Volker Prahl, Sergio Díez, on behalf of the petal community CERN AUW, 3 rd Nov 2014.
ATLAS-UK Tracker Upgrade OverviewR.Nickerson Programme StatusI.Wilmut [hat 2] WP2Peter Phillips WP3Bart Hommels WP4Tim Jones WP5Craig Buttar [hat 3] B180Todd.
Progress on Stave assembly tooling Stephanie Yang (Oxford) WP4 meeting at Liverpool University, 13 th November 2014.
(Tim Jones).  Who am I? ATLAS-UK Tracker Upgrade work-package leader for WP4 (Mechanics)  Materials, Cooling, Stave Core Assembly, Module Mounting,
Stave 130 (Intermediate Thermo-mechanical Stave) Tim.
Silicon Strip Detector Section of LOI Editors: David Lynn (primary), Nigel Hessey (secondary) Subsections: 1.Silicon Strip Sensors 2.Strip System Front-End.
Strip Stave Status & Plans at Yale Yale: Paul Tipton, Will Emmet, Tom Hurteau.
Task 5: Test / Shipping Status Report. Overview  Where are we  Chamber  Stavelet holder frame  Module mounting frame  What next QMUL Sept 10.
1 ATLAS Upgrade WP4 Face to Face meeting Sheffield 25 th August 2011 Richard French – The University of Sheffield Ian Mercer – Lancaster, Martin Gibson,
WP4 April 2013 to March 2016 (Tim). WP4 Outline 1.Scope of UK Activity 2.How the UK work fits into the international programme 3.People involved, institutes,
Stator Plan & Schedule Chris Booth 2nd March 2009
ATLAS Internal ID Service Integration
What is Stave Carrier Frame Required to Do?
Are there better ways to build a stave?
Cooling loops for prototype Staves
Mechanics: (Tim).
WP4 – Plans for next 6 months
Graham Beck, QMUL, WP4 RAL 2 May 2013
LOI Backup Document: R&D
Tests of Endcap capillary & Heat exchangers at CERN
Presentation transcript:

Task 4.2 Stave Core Assembly (Tim)

Task 4.2 Outline Year 1: Design and construction of staves and stavelets suitable for 130nm ASICs which will be used to validate the thermal and electrical aspects of the design. The final geometry of the stave core design is contingent on external factors, particularly the layout, integration with the global support structure and level-1 trigger requirements. This will be fixed, along with performance specification towards the end of the first year. Year 2: Final development of stave core thermo-mechanical design for lowest mass, based on results from the previous work and using the tuned FEA models. The tooling to manufacture face sheets and stave cores will be developed and the final prototype staves will be manufactured and tested. Year 3: Manufacture of final prototype stave cores & mounting of electrical modules for stave system tests. A production plan for the UK share of stave cores including both manufacture and QA regime will be developed. The following stave cores will be built as a minimum; – SP Stavelet core (2-3) – DCDC Stavelet core (2-3) – Further stavelets (once powering decision is taken) (2) – Thermo-mechanical stave core (12) – Final Prototype Stave core (6) 2/05/20132ATLAS Tracker WP4 Meeting at RAL

Task 4.2 Milestones 2/05/2013ATLAS Tracker WP4 Meeting at RAL3 Milestone / Deliverable Description Completion date DeliverableTask M4.1Draft stave thermo-mechanical and electrical performance requirements documentedQ3/2013D4.2? M4.2Delivery of prototype stave core for 130nm ASICsQ4/ M4.3Draft stave assembly and QA proceduresQ1/2014D D4.1Probing system for reception testing and stave life-cycle tape QAQ1/ D4.2Final stave thermo-mechanical and electrical performance requirements documentQ2/ M4.5Final stave core design frozenQ2/ D4.3Final stave assembly and QA procedures documentQ3/ /4.4 M4.6First UK final prototype stave core completeQ4/ M4.7Delivery of prototype core with GBT and VLQ2/2015D M4.8Production plan for UK stave assemblyQ3/ D4.4Delivery of six thermo-mechanical and two electrical staves and associated QA reportQ1/ /4.3/4.4 NB: Need to understand / agree which task owns which milestone!

Task 4.2: Effort 2/05/2013ATLAS Tracker WP4 Meeting at RAL4 TaskNameRoleInstituteFundingY1Y2Y3Total 4.2 Jones AP Liverpool CG Carroll JL E Liverpool CG Sutcliffe P E Liverpool CG Whitley M T Liverpool CG0.20 Mechanical Workshop T Liverpool CG Mechanical Workshop T Liverpool NM WPT-9 Technician T Liverpool NM G. Viehhauser Ac Oxford CG0.20 R. Nickerson Ac Oxford CG0.10 S. Yang E Oxford CG0.20 R. Makin E Oxford CG J. Lynn E Oxford CG Mech Tech T Oxford CG Elec Tech T Oxford CG Mech Tech T Oxford NM Elec Tech T Oxford NM Ian Mercer T Lancaster CG0.50 Paul Booker T TD 0.20 Richard French E Sheffield CG Sub-total

Specifications Aim – Need to develop a set of specifications for what a stave is supposed to be (M4.1) – Need to develop a draft assembly procedures and QA plan (M4.3) Things to think about … – How do we do this within the international context? – UK-led developments (orbital welded titanium, side- mounted EoS, Single-edge locking, etc..) – UK-team comprises most of the technical effort to design/prototype/evaluate options 2/05/2013ATLAS Tracker WP4 Meeting at RAL5

Stave 130 Geometry Aim Would like to converge with realistic designs based on proper evaluation of options/constraints by September – NB not a holiday! Lots of work to be done NOW to ensure September design is as realistic as possible. Things to think about…. – What length, width, thickness? – Where do the end locations & intermediate locking points go ? – How big is the EoS – What is the cooling loop geometry – What do the end close-outs look like? 2/05/2013ATLAS Tracker WP4 Meeting at RAL6

Stave Assembly Tooling Aim – Need to build a number of stave assembly tools for emerging stave design Things to think about… – Development of current carbon-fibre tool Feedback on design/use/etc..? – Schedule Aim to have stave geometry fairly fixed by September but tooling design could start earlier? Would like to have tooling built & being de-bugged by the end of 2013 – How many tools? Liverpool / Oxford / Brookhaven ? 2/05/2013ATLAS Tracker WP4 Meeting at RAL7

Prototype Stave(let) Manufacture Aim – To manufacture stavelet and full stave cores to UK and international community for electrical readout tests – To manufacture & test thermo-mechanical stave cores to qualify geometric accuracy, mechanical and thermal performance requirements Things to think about…. – Materials procurement & QA (pre-preg, honeycomb, foam, plastics, etc…) – Sub-component specifications, manufacture & checking; parts identification – Assembly procedure tracking – Links to 4.4 (QA) 2/05/2013ATLAS Tracker WP4 Meeting at RAL8

WP4 Schedule 13/Q213/Q313/Q414/Q114/Q214/Q314/Q415/Q115/Q215/Q315/Q416/Q1 130nm stave design 130nm tooling development 130nm thermal cores m/f & evaluation 130nm stavelet cores 130nm electrical cores 130nm module mounting 130nm electrical evaluation Final stave core design Final stave core tooling development Pre-production stave core m/f & thermo-mechanical eval. Module mounting system development Pre-production module mounting &elec. evaluation Production planning & preparation 2/05/20139ATLAS Tracker WP4 Meeting at RAL