Role of Consultants in Developing Sustainable Projects Pooja Kapoor Head (Business Development)

Slides:



Advertisements
Similar presentations
Methodologies for Assessing Social and Economic Performance in JESSICA Operations Gianni Carbonaro EIB - JESSICA and Investment Funds JESSICA Networking.
Advertisements

Achieve Benefit from IT Projects. Aim This presentation is prepared to support and give a general overview of the ‘How to Achieve Benefits from IT Projects’
Water for a food-secure world IFAD agricultural water management investments in “challenging contexts”: IFAD context, commonalities across countries, &
Course: e-Governance Project Lifecycle Day 1
FEASIBILITY STUDIES INFORMATION SESSION. OVERVIEW  Background and approach the feasibility studies  Guidelines ♦Discussion of terms of reference ♦Sustainability.
UNRESTRICTED Infrastructure Assessment as Viewed by Technology Holders IAEA Technical Meeting December 10-12, 2008 R. Godden.
Project Management Process. Project Complexity means that: a team of people are needed to supply expertise the work needs to be broken into manageable.
Hydropower Development: Experience of Nepal
Racco industrial consulting working according to investment law to prepare Engineering, Economic, Technology, Environmental Studies for industrial projects.
Managing the Information Technology Resource Jerry N. Luftman
ENVIRONMENTAL MANAGEMENT PLAN
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Effective Programme Management
Jeff Delmon FEU Financial Solutions World Bank. Why PPP? Procurement efficiency Lifecycle management Design/construction/operation management Monetizing.
Public Private Partnership- Identification, Viability and Implementation Prof. Yashvir Tyagi Prof. Yashvir Tyagi Department of Economics Department of.
Improving the Energy Efficiency of the Heat and Hot Water Supply Presenter: Bayramgul Garabaeva, Programme Officer Decentralization and Community Development.
Cash Based Interventions in unhcr
Advancing environmental sustainability in WHO/PAHO and in the health sector.
FIDIC CONFERENCE 2005, BEIJING Workshop 13 Design & Build - Role of Consulting Engineers in the Tender Process Tse Yau Shing.
The Role of Local Government in implementing Biogas Projects Barry Coetzee, Head: Integrated Waste Management, Strategy & Policy Solid Waste Management.
IAEA International Atomic Energy Agency How do you know how far you have got? How much you still have to do? Are we nearly there yet? What – Who – When.
S/W Project Management
PEIP National workshop in Montenegro: developing environmental infrastructure projects in the water sector Feasibility Study Preparation Venelina Varbova.
M i c r o E n e r g y I n t e r n a t I o n a l MicroEnergy International INAISE Conference st June 2012.
PROJECT IDENTIFICATION AND FORMULATION
Institutional Evaluation of medical faculties Prof. A. Сheminat Arkhangelsk 2012.
USING THE PUBLIC PROCUREMENT MODEL OF EXCELLENCE (PPME) TOOL TO IDENTIFY CAPACITY DEVELOPMENT NEEDS A PRESENTATION BY A.B. ADJEI CHIEF EXECUTIVE – PUBLIC.
Studi Kelayakan (Feasibility Study)
Will Speller Economist, Investment Issues Section United Nations Conference on Trade and Development Investment Contracts for Agriculture: Practical Guidelines.
Consultation seminar on the preparation of full Application Form for LSP 6 December 2011, Tartu Consultation seminar on the preparation of full Application.
European Broadband Portal Phase II Application of the Blueprint for “bottom-up” broadband initiatives.
PADI Action Agenda for China(draft) History of Poverty Reduction in China History of Monitoring & Evaluation in Poverty Reduction Objectives.
Volunteering Hawkes Bay Supervision, Support and Recognition of Volunteers Looking After your Paid and Unpaid Carers.
Specification & Quantities Estimating
INTRODUCTION Mark Heggli, Meteorologist/Hydrologist Expert Real-time Hydrology Information Systems Innovative Hydrology, Inc. Consultant to the World Bank.
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PHASED ACTIVITIES AND BASELINE DOC’s FOR UTIILITIES ACQUISITION BULK SERVICE LIF-CYCLE APPROACH IDENTIFICATION & ANALYSIS APPLICABLE TECHNOLOGY / RESEARCH.
THE PROJECT CYCLE By Dr. Peter Quartey (ISSER, Univ. of Ghana)
Environmental Management Plan (EMP) Required for: Full EIA based on Palestinian EIA Policy Category A projects based on World Bank Policy.
MiniGrid Group NEP Off Grid Electrification Breakout session.
College of Environment Design Construction Engineering Technology Assessment of Constructability Practice Among General Contractors in The Eastern Province.
The global energy landscape and its impact on Bangladesh Dr. Boris Gehring TÜV SÜD Slide 1 13/10/15‘Safe Future Now’ Summit on Power and Energy in Bangladesh.
Process of Planning, Designing and Financing a Hospital
International Atomic Energy Agency Workshop feedback “ Roles & Responsibilities of Vendor Countries and Countries Embarking on Nuclear Power Programmes.
1 UNEP/IETC EST Initiative Proposed Cooperation Framework 4 December 2003 Otsu, Japan.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
SOLUTION What kind of plan do we need? How will we know if the work is on track to be done? How quickly can we get this done? How long will this work take.
ISMS Implementation Workshop Adaptive Processes Consulting Pvt. Ltd.
Development through partnership Infrastructure Delivery Management Toolkit: 2010 Edition Delivery Process 2: Project Management 1.
Technology Needs Assessments under GEF Enabling Activities “Top Ups” UNFCCC/UNDP Expert Meeting on Methodologies for Technology Needs Assessments
DEVELOPING THE WORK PLAN
Demonstrating and Promoting Best Techniques and Practices for Reducing Health Care Waste to Avoid Environmental Releases of Dioxins and Mercury Project.
Presentation to the Ad-hoc Joint Sub-Committee on Parliamentary Oversight and Accountability Wednesday 20 March 2002 PUBLIC SERVICE MONITORING AND EVALUATION.
BIMILACI 2007 Best Practice Procurement of Engineering Services Washington, D.C. May , 2007 Gregs Thomopulos, P.E., FACEC Executive Committee Member,
Dr. Nyamajeje C. Weggoro Director, Productive and Social Sectors EAC Secretariat THE DAR ES SALAAM-TANGA- MOMBASA NATURAL GAS PIPELINE AND EAST AFRICAN.
Lecturer: Lina Vladimirovna Zhornyak, Associate Professor.
Quality Improvement.
GEF governance reforms to enhance effectiveness and civil society engagement Faizal Parish GEC, Central Focal Point , GEF NGO Network GEF-NGO Consultation.
Standards for success in city IT and construction projects
HP-II Workshop on Real-time Hydrological Information Systems
Title: Introduction of Standard Steps in Planning and Implementation of Water Sector Projects in Ethiopia. Prepared by: Dr.-Ing. Asie Kemal Jabir, Addis.
HP-II Workshop on Real-time Hydrological Information Systems
Controlling Project Cost and Schedule
#BIM TOP BENEFITS OF IMPRESSIVE BIM CONSTRUCTION MANAGEMENT FIRMS & BIM PRECONSTRUCTION SERVICES #BUILDINGINFORMATIONMODELING BIM Engineering U.S.,L.L.C.
Contract Award to TMG Utility Advisory Services, Inc
Project delivery RIBA stages Define design deliver Key Objectives 1 2
Industry Engagement Program Medical Diagnostic Imaging (MDI) Equipment
Obtaining & Retaining Funds for RWS Schemes from Outside Sources
The Role of Local Government in implementing Biogas Projects Barry Coetzee, Head: Integrated Waste Management, Strategy & Policy Solid Waste Management.
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

Role of Consultants in Developing Sustainable Projects Pooja Kapoor Head (Business Development)

Sustainable Project Project Design & Supervise Convert the Project into a SUSTAINABLE PROJECT Need a Consultant "Development that meets the needs of the present without compromising the ability of future generations to meet their own needs.”

SUSTAINIBILITY PILLARS OF SUSTAINIBILITY

A Technical Consultant is like a Doctor As a specialized doctor is needed To diagnose the disease To provide the right medication in the right amount To cure a patient An expert technical consultant is needed To understand the project To understand client specific requirements Suggest solutions

To Work Smart not Hard Why an Expert Consultant is needed ? To achieve the target and project objectives To achieve the right balance between cost benefits and risk

 Policy Studies / Development of Master Plans  Pre-investment Studies / Financial Engineering  Evaluate Viability and Risks  Technology Promotion  Create opportunities for Indian Exports (Goods/Projects)  Catalyst for timely and quality delivery of the Project  Confidence of borrower in Project Sustainability  Transfer of Technology and Technical Expertise Borrowing Govt. Funding Agency  Can be appointed by Lender’s Engineer Recommended by Funding Agency to develop the Project from Concept to Commissioning and appointed by borrowing Govt. Project Developer Owner’s Engineer Project Developer

 General Layout  Cost Estimates  Techno-Economic Viability  Project Implementation Schedule  Phasing of Expenditure Other Reports Consultant Vetting Borrowers Proposals Previous Projects Resident Mission Project Identification FR/ER

Consultants are required right from the stage of identification of project/supply requirements to successful building/construction or delivery of equipment/material  Review & Checking of Feasibility Report  Technical viability  Financial Analysis  Evaluation of DPR  Design of Project Components  Socio-economic Impact Assessment  Construction Programme & Methodology  Financial Analysis  O&M Plan  Pre-Shipment Testing/Inspection  Equipment testing & Certification  Factory Acceptance Tests  Project Management Consultancy  Construction Supervision  Quality Control  Measurement of Works  Post Evaluation

 Project Management Consultancy  Construction Supervision  Quality Control  Measurement of Works  Testing & Commissioning  Post Evaluation  Tender Engineering  Pre-Shipment Testing/Inspection  Equipment testing & Certification  Factory Acceptance Tests  Preparation of DPR  Detailed Design of Project Components  Environmental Impact Assessment  Financial Analysis (IRR, BCR)  O&M Plan  Preparation of Feasibility Report  Technical viability  Financial Analysis Consultants are required right from the stage of identification of project / supply requirements to successful building/construction or delivery of equipment/material  Capacity Building  Training  Transfer of Technology  Survey and Investigation

 Feasibility Studies  Survey & Investigations  Detailed Project Report  Pre-Contract Services  Tendering  Bid Evaluation  Award of Works  Implementation Schedule  Preparation of Construction Drawings  Pre-Shipment Testing/Inspection  Construction Supervision  Contract Management  Quality Control  Training  Operations & Maintenance Consultants are required right from the stage of identification of project / supply requirements to successful building/construction or delivery of equipment/material

Better Quality of Work Catalyst or Facilitator in guiding multi- step process Minimize Operational Mechanism Avoid conflict of Interest Develop Vision to create a more inclusive growth Fill a short-term gap in the staffing structure Overall Guidance throughout the project Completion of the Project in cost effective manner

Making the Owner Self Sustainable Training and transfer of technology Organizing workshops and study tours Training for Running & Maintenance Formation of Water User’s Association Participation in Project Execution and Management Preparation of Operation and Management Plans

Thank You

SUSTAINIBILITY PARADIGM