CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 1/15 Jeroen van Tilburg (Universität Zürich) LHCb: Preparation for LHC.

Slides:



Advertisements
Similar presentations
LHCb Alignment 12 th April 2007 S. Viret Coseners Forum « LHC Startup » 1. Introduction 2. The alignment challenge 3. Conclusions.
Advertisements

B. List, ETH Zürich Page 1 Report from H1: PRC Open Session, H1: Status and Prospects Benno List Institute for Particle Physics, ETH Zürich.
H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
IV Convegno Nazionale Fisica ALICE, Palau, Andrea Dainese 1 Cosmics in ITS: tracking & alignment A.Dainese (INFN Legnaro) ITS alignment group:
Olivier Callot LHCb commissioning What had to be done Technical challenges Before first beam: Cosmics First beams TED shots Circulating beam What will.
27 th June 2008Johannes Albrecht, BEACH 2008 Johannes Albrecht Physikalisches Institut Universität Heidelberg on behalf of the LHCb Collaboration The LHCb.
J. Leonard, U. Wisconsin 1 Commissioning the Trigger of the CMS Experiment at the CERN Large Hadron Collider Jessica L. Leonard Real-Time Conference Lisbon,
The LHCb Inner Tracker Marc-Olivier Bettler SPS annual meeting Zürich 21 February 2007.
Increasing Field Integral between Velo and TT S. Blusk Sept 02, 2009 SU Group Meeting.
Introduction Silicon Tracker project: design production Tracking strategy and performance Design and performance of the LHCb Silicon Tracker Kim Vervink.
1 CMS Tracker Alignment and Implications for Physics Performance Nhan Tran Johns Hopkins University CMS Collaboration SPLIT
Beam profile measurements based on modern vertex detectors and beam-gas interactions Slides from: Colin Barschel - TIPP 2014 third international conference.
1 Track reconstruction and physics analysis in LHCb Outline Introduction to the LHCb experiment Track reconstruction → finding and fitting Physics analysis.
 A GEANT4-based simulation was performed of the production target, solenoid, selection channel, and spectrometer.  The acceptance was found to be 8.3x10.
Jeroen van Hunen The LHCb Tracking System. May 22, 2006 Frontier Detectors for Frontier Physics, Elba, Jeroen van Huenen 2 The LHCb Experiment LHCb.
1 Performance of the LHCb VELO Outline LHCb Detector and its performance in Run I LHCb Detector and its performance in Run I LHCb VELO LHCb VELO VELO performance.
Tracking at LHCb Introduction: Tracking Performance at LHCb Kalman Filter Technique Speed Optimization Status & Plans.
Chris Parkes First results from the LHCb Vertex Locator Act 1: LHCb Intro. Act 2: Velo Design Act 3: Initial Performance for LHCb VELO groupVienna Conference.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
ATLAS Forward Detector Trigger ATLAS is presently planning to install forward detectors (Roman Pot system) in the LHC tunnel with prime goal to measure.
Installation and operation of the LHCb Silicon Tracker detector Daniel Esperante (Universidade de Santiago de Compostela) on behalf of the Silicon Tracker.
Operation of the CMS Tracker at the Large Hadron Collider
Muon-raying the ATLAS Detector
The Status of the ATLAS Experiment Dr Alan Watson University of Birmingham on behalf of the ATLAS Collaboration.
Luca Spogli Università Roma Tre & INFN Roma Tre
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
18 december 2002, NIKHEF Jamboree Tracking and Physics Studies, Jeroen van Tilburg 1 Tracking and Physics Studies in LHCb Jeroen van Tilburg NIKHEF Jaarvergadering.
1 1 The LHCb Upgrade Outline LHCb Detector LHCb Detector Selected Physics Results Selected Physics Results Upgrade Plans Upgrade Plans Summary Summary.
26 June 2006Imaging2006, Stockholm, Niels Tuning 1/18 Tracking with the LHCb Spectrometer Detector Performance and Track Reconstruction Niels Tuning (Outer.
Status of the LHCb experiment Andrei Golutvin ( Imperial & CERN & ITEP ) on behalf of the LHCb Collaboration Outline:  Introduction  Detector Subsystems.
First CMS Results with LHC Beam
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
CP violation in B decays: prospects for LHCb Werner Ruckstuhl, NIKHEF, 3 July 1998.
The Detector Performance Study for the Barrel Section of the ATLAS Semiconductor Tracker (SCT) with Cosmic Rays Yoshikazu Nagai (Univ. of Tsukuba) For.
1. Efficient trigger for many B decay topologies Muon System CALORIMETERS PRS + ECAL+ HCAL RICH1 VERTEX LOCATOR Efficient PID Good decay time resolution.
Abraham Gallas for the LHCb Silicon Tracker Group 7 th International Hiroshima Symposium on Development and Application of Semiconductor Tracking Devices.
AEM, Sept Frank Chlebana (Fermilab) Status of the LHC and CMS Frank Chlebana (Fermilab) All Experimenter’s Meeting Sept
A novel approach to detector calibration parameter determination and detector monitoring Eduardo Rodrigues On behalf of the LHCb VELO Group CHEP 2010,
LHCb trigger: algorithms and performance Hugo Ruiz Institut de Ciències del Cosmos March 12 th -17 th 2009, Tsukuba, Japan On behalf of the LHCb Collaboration.
3 May 2003, LHC2003 Symposium, FermiLab Tracking Performance in LHCb, Jeroen van Tilburg 1 Tracking performance in LHCb Tracking Performance Jeroen van.
Alignment Challenge at LHCb Steven Blusk Syracuse University LHC Alignment Workshop, Aug 3-5, 2006.
Run II preparations Test beam plans Moving from 156 to 169 DT-LHCb coordination meeting June 2, 2015.
LHCb Alignment Strategy 26 th September 2007 S. Viret 1. Introduction 2. The alignment challenge 3. Conclusions.
1/20 LHCb upgrade, Jeroen van Tilburg Nikhef Jamboree, 14 Dec 2015 Preparing for the LHCb upgrade.
CMS Status & Commissioning Menu: 1 Recent Progress Commissioning Prior to and After First Beam Commissioning with first LHC Events Outlook Wolfgang Funk.
Real data in the Muon Spectrometer Bernardo RESENDE and a lot of other people not named here NIKHEF Jamboree, December 2008.
Iterative local  2 alignment algorithm for the ATLAS Pixel detector Tobias Göttfert IMPRS young scientists workshop 17 th July 2006.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
First collisions in LHC
ST software status, Jeroen van Tilburg
IOP HEPP Conference Upgrading the CMS Tracker for SLHC Mark Pesaresi Imperial College, London.
Simulated vertex precision
Preparation of LHCb for data taking
LHCb Velo: commissioning, performance and High flux tests.
5% The CMS all silicon tracker simulation
The LHC collider in Geneva
UNIZH and EPFL at LHCb.
Preparation of the CLAS12 First Experiment Status and Time-Line
Niels Tuning (Outer Tracker Group LHCb)
Bringing the ATLAS Muon Spectrometer to Life with Cosmic Rays
The LHCb vertex detector
T. Bowcock University of Liverpool For the LHCb Collaboration
8th International Conference on Advanced Technology and
The LHCb Level 1 trigger LHC Symposium, October 27, 2001
Setup for testing LHCb Inner Tracker Modules
Installation, Commissioning and Startup of ATLAS & CMS Experiments
The LHCb VErtex LOcator
The LHCb Front-end Electronics System Status and Future Development
First results from the LHCb Vertex Locator
Presentation transcript:

CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 1/15 Jeroen van Tilburg (Universität Zürich) LHCb: Preparation for LHC beam CHIPP meeting Appenberg, August 2009

CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 2/15 LHCb setup Muon Calorimeters RICH2 IT+OT RICH1 VELO Magnet TT

CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 3/15 LHCb setup Muon Calorimeters RICH2 IT+OT RICH1 VELO Magnet TT

CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 4/15 LHCb setup Muon Calorimeters RICH2 IT+OT RICH1 VELO Magnet TT Inner Tracker VELO Swiss contributions TT EPFLUni Zürich Electronics

CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 5/15 Shutdown activities Many shutdown activities from Sep 08 – now. → Never-ending improvements (apart from M1 installation). Many shutdown activities from Sep 08 – now. → Never-ending improvements (apart from M1 installation). Many tests and improvements Hardware replacements (repairs) and improvements (safety, reliability). Optimization of the control system. Integration of all components. Improvement and development of online monitoring. Installation of full readout network for 1 MHz data acquisition. FEST: exercise data flow up to Tier1s by injecting simulated events into farm. Continuously checking for cable swaps, bad connections, hardware failures, debugging, better understanding of detector. A large fraction of LHCb readout channels working without problems Many tests and improvements Hardware replacements (repairs) and improvements (safety, reliability). Optimization of the control system. Integration of all components. Improvement and development of online monitoring. Installation of full readout network for 1 MHz data acquisition. FEST: exercise data flow up to Tier1s by injecting simulated events into farm. Continuously checking for cable swaps, bad connections, hardware failures, debugging, better understanding of detector. A large fraction of LHCb readout channels working without problems VELO99.0% TT99.75% IT99.7% Fraction of working channels

CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 6/15 Cosmic events Mean of track residuals Module number After alignment (with different sample)  Few Hz trigger on cosmics.  About 3 M triggers acquired in summer  Muon and Calo synchronized to few ns.  Commissioning of L0 trigger.  Muon aligned to ~200 micron (130k tracks used).  OT aligned to ~100 micron (20k tracks used). IT lacks statistics: → only 90 tracks pass 2 IT stations → only 2 tracks pass all 3 IT stations. IT lacks statistics: → only 90 tracks pass 2 IT stations → only 2 tracks pass all 3 IT stations. OT alignment LHCb geometry not ideal to measure cosmics → only large systems benefit from cosmics (Muon, Calo and OT)

CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 7/15 Beam induced events (beam 1)  Data taken on Sep 10 th  Circulating beam 1 (“right direction”).  Detected halo & splash events (beam on collimator).  Muon, Calo, RICH2 and OT on. Silicon detectors off.  Useful for synchronization and experiment operation.  Successful start for LHCb, yet too short. Splashy event in Outer Tracker (not all tracks reconstructed) Splash in calorimeter & muon detector Photon blast in RICH2 Muon Calo Muon Calo OT An hour of circulating beam is more interesting than a month of cosmics.

CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 8/15 LHCb LHC T I8 TED (located 350m before LHCb) Beam induced events (TED) Beam dump (TED) before injection to LHC ring. Shot every 48 seconds with 2x10 9 – 5x10 10 protons. Particles (mainly ~10 GeV muons) in “wrong direction”. Trigger provided by calorimeter (SPD) Useful exercise for fine-timing of subdetectors (few ns). Very different strip occupancies (at 5x10 9 protons): → VELO: < 0.2%, IT: 6%, TT: 10%. Beam dump (TED) before injection to LHC ring. Shot every 48 seconds with 2x10 9 – 5x10 10 protons. Particles (mainly ~10 GeV muons) in “wrong direction”. Trigger provided by calorimeter (SPD) Useful exercise for fine-timing of subdetectors (few ns). Very different strip occupancies (at 5x10 9 protons): → VELO: < 0.2%, IT: 6%, TT: 10%. TED09: Intensity 2x10 9 – 5x10 10 protons. Single shots every 48 seconds. Bunch trains (12 shots with 25 ns spacing). TED09: Intensity 2x10 9 – 5x10 10 protons. Single shots every 48 seconds. Bunch trains (12 shots with 25 ns spacing). TED runs: Aug/Sep 2008 June 2009 Oct 2009 (expected) TED runs: Aug/Sep 2008 June 2009 Oct 2009 (expected) → LHC injection tests very useful for commissioning silicon detectors! TED08: Intensity ~5x10 9 protons. Single shots every 48 seconds. TED08: Intensity ~5x10 9 protons. Single shots every 48 seconds.

CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 9/15 VELO TED results TED08: VELO in open position tracks (about 6 tracks per event). Modules within 10 μm of metrology. Module alignment precision about 5 μm. TED08: VELO in open position tracks (about 6 tracks per event). Modules within 10 μm of metrology. Module alignment precision about 5 μm.  Two retractable halves.  21 modules, each with a r- and φ-measuring sensor.  Strip pitch: 36–102 μm.  S/N > 20 VELO Reconstructed tracks from TED event TED09: VELO in (almost) closed position → alignment of two halves possible (1k tracks). More than 50k tracks (6–14 tracks per event) → sensor alignment possible. Module alignment precision 1.4 μm. TED09: VELO in (almost) closed position → alignment of two halves possible (1k tracks). More than 50k tracks (6–14 tracks per event) → sensor alignment possible. Module alignment precision 1.4 μm.

CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 10/15 VELO TED results Moved VELO halves during the TED09 run by 450 μm Reconstruction sees movement of 445 ±10 μm (blind analysis!) Reconstructed distance between halves Before movement After movement Two halves can be aligned with high accuracy!

CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 11/15 Landau distribution S/N~11 TT TED results TT  Four layers (0º,+5º,−5º,0º) of 150 x 130 cm.  Strip pitch: 183 μm. 64 modules with 14 sensors each.  Module (supports) surveyed to 50 μm precision.  Only 4 layers → no standalone track reconstruction. Residuals of TT hits from extrapolated VELO tracks. Use TED08 data for alignment (TED09 under study). Extrapolate VELO tracks to TT (~550 tracks found). Tracks limited around beam pipe. Alignment of full station (2 dof). Use TED08 data for alignment (TED09 under study). Extrapolate VELO tracks to TT (~550 tracks found). Tracks limited around beam pipe. Alignment of full station (2 dof). Survey improves residuals

CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 12/15 S/N~14 Landau distribution IT TED results Inner Tracker  3 stations with 4 boxes each.  Each box has 4 layers (0º,+5º,−5º,0º).  Strip pitch: 198 μm.  Standalone track reconstruction. Fighting combinatorics Use run with lowest occupancy (~3% occupancy). Start from initial pre-aligned detector. Iterate track finding and alignment with evolving χ² cuts. Require tracks to point back to TED. Fighting combinatorics Use run with lowest occupancy (~3% occupancy). Start from initial pre-aligned detector. Iterate track finding and alignment with evolving χ² cuts. Require tracks to point back to TED. IT tracks in TED09 x (mm) y (mm) Origin of IT tracks

CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 13/15 IT TED results σ~25 μm TED09 using 2008 alignment Confirms 2008 ladder alignment precision TED08: IT in closed position. Lowest occupancy runs: 5k tracks. Alignment of boxes (3 dof), layers (2 dof) and ladders (1 dof). Layer alignment precision ~10 μm. Ladder alignment precision ~25 μm. TED08: IT in closed position. Lowest occupancy runs: 5k tracks. Alignment of boxes (3 dof), layers (2 dof) and ladders (1 dof). Layer alignment precision ~10 μm. Ladder alignment precision ~25 μm. TED08 before alignment TED08 after align- ment with low occupancy run σ~150 μm σ~25 μm TED09: IT in open position (±60 cm). Runs with lowest occupancy: 12k tracks (total: 50k) Alignment of boxes (3 dof), layers (2 dof) and ladders (1 dof). Estimated ladder alignment precision ~10 μm. Data currently under study. TED09: IT in open position (±60 cm). Runs with lowest occupancy: 12k tracks (total: 50k) Alignment of boxes (3 dof), layers (2 dof) and ladders (1 dof). Estimated ladder alignment precision ~10 μm. Data currently under study. Mean track residual for each ladder

CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 14/15 Physics analysis Many Swiss physics activities Key features: High trigger efficiency. Use control channels to normalize BR. Good mass resolution of 20 MeV (requires well-aligned detector). Key features: High trigger efficiency. Use control channels to normalize BR. Good mass resolution of 20 MeV (requires well-aligned detector). Example: B s → μ + μ − Luminosity (fb −1 ) BR(x10 −9 ) Charmonium production (X,Y,Z states) Λ (and K s ) production Forward electroweak physics Higgs and exotic SUSY Charmonium production (X,Y,Z states) Λ (and K s ) production Forward electroweak physics Higgs and exotic SUSY LFV in τ→3μ β s mixing phase from B s →J/ψ φ B → l + l − K (*) decay Rare decay B s → μ + μ − Improve upper limit with 2009/2010 data.

CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 15/15 Summary  LHCb is fully installed and commissioned using cosmic and beam-induced events.  Control software, DAQ, trigger farm being tested regularly and improved.  Beam-induced and cosmic events very useful to align detectors, develop tools, exercise data acquisition, understand detector.  Wide variety of physics analysis pursued. Promising analysis with first data.  LHCb is ready for beam and looking forward to exciting physics in the heavy flavour sector.  LHCb is fully installed and commissioned using cosmic and beam-induced events.  Control software, DAQ, trigger farm being tested regularly and improved.  Beam-induced and cosmic events very useful to align detectors, develop tools, exercise data acquisition, understand detector.  Wide variety of physics analysis pursued. Promising analysis with first data.  LHCb is ready for beam and looking forward to exciting physics in the heavy flavour sector.