GLAST LAT Project LAT Instrument Analysis Meeting – June 30, 2006 Hiro Tajima, TKR Efficiency Trending, NRL 1 GLAST Large Area Telescope: TKR.

Slides:



Advertisements
Similar presentations
Tracker Subsystem1 GLAST LAT Project FM8/14 PSR, Oct. 5, 2005 GLAST LAT Tracker Towers 8/14 Pre-Ship Review INFN-Pisa.
Advertisements

GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT ProjectLAT F2F Mgrs Meeting November 17, Tanya Boysen LAT Project Controls Manager WBS Instrument Management.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Safety Overview.
GLAST LAT Project Instrument Analysis Workshop 6 – 06/02/27 F. Piron & E. Nuss (LPTA) 1 Trending CAL performance and mapping crystals Gamma-ray Large Area.
GLAST LAT Silicon Tracker Marcus ZieglerAPS April Meeting The GLAST Silicon Tracker Marcus Ziegler Santa Cruz Institute for Particle Physics University.
GLAST LAT Project Instrument Analysis Meeting– May 27, 2005 Hiro Tajima, TKR Bad Strips 1 GLAST Large Area Telescope: TKR Bad strips analysis update Hiro.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
GLAST LAT Instrument GLAST Monthly Mission Review October 29, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview October 29, 2007 Ken.
GLAST LAT Project CCB Review – June 2 nd, 2005 GLAST LAT I&T Online A.T.Kavelaars 1 GLAST Large Area Telescope: I&T CCB Review June 2 nd, 2005 E-Logbook.
GLAST LAT Project June 6, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall.
GLAST LAT Project TKR Tower 4 and 5 hand-off review – June 8,2005 Hiro Tajima, TKR Tower 4 and 5 hand-ff review 1 GLAST Large Area Telescope: TKR Hand-off.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test A. T. Kavelaars 1 GLAST Large Area Telescope: I&T Integration Readiness.
GLAST LAT Project Integration and Test SVAC Peer Review 1 GLAST Large Area Telescope: I&T Integration Readiness Review SVAC Peer Review July 21,
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test J. Panetta 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope:
GLAST LAT Project Instrument Analysis Workshop 5 – 05/08/29 F. Piron & E. Nuss (IN2P3/LPTA – Montpellier) 1 Comprehensive review of CAL calibrations Gamma-ray.
A.Chekhtman1 GLAST LAT ProjectInstrument Analysis meeting, June, 24, 2005 CAL retriggering study with SLAC data. Alexandre Chekhtman NRL/GMU Gamma-ray.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: On-Orbit Calibration and.
GLAST LAT Project LAT Instrument Analysis Meeting – May 26, 2006 Hiro Tajima, TKR Efficiency Trending 1 GLAST Large Area Telescope: TKR Efficiency Trending.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 1 GLAST Large Area Telescope Pre-Environmental Test.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
GLAST LAT Project Analysis Meeting March 22, 2004 E. do Couto e Silva 1/8 LAT Instrument Test Analysis Eduardo do Couto e Silva March 23, 2004.
IA meeting, Feb. 3, 2006 Mutsumi Sugizaki TKR Noise Stdudy 1 LAT TKR Noise Study Current Status Mutusmi Sugizaki (and short comment about TOT=255 event)
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
9/23/2005 Inst. Ana. MeetingTKR trigger efficiency with ACD&CAL 1 Study of TKR trigger efficiency with ACD and CAL Mutsumi Sugizaki, Hiro Tajima SLAC.
GLAST LAT Project Instrument Analysis Meeting– Dec 9, 2005 Takuya Kawamoto, TKR Noisy Strip determination 1 Noisy Strip determination Takuya Kawamoto (Hiroshima.
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
GLAST LAT ProjectTest Planning Meeting Aug 2, 2004 E. do Couto e Silva 1/6 SVAC EM2 Goals Develop distributions for E2E tests that involve comparison of.
GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT Project SE Test Planning meeting October 4, 2004 E. do Couto e Silva 1/13 SVAC Data Taking during LAT SLAC Oct 4, 2004 Eduardo.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
Tracker Subsystem1 GLAST LAT Project FM6 PSR, July 21, 2005 GLAST LAT Tracker Tower6 Pre-Ship Review INFN-Pisa.
GLAST LAT Project Analysis Meeting April 22, 2004 E. do Couto e Silva 1/5 SVAC Status SVAC Status Eduardo do Couto e Silva April 22, 2004.
10/21/2005 Inst Ana Meeting TKR Noise Flares1 TKR Noise Flares observed in TKR #11 and #8 Mutsumi Sugizaki, Hiro Tajima, and TKR team.
By: Kiana and Meagan. Purpose  To measure solar magnetic fields  To understand how energy generated by magnetic-field changes in the lower solar atmosphere.
06/02/2006 M.Razzano - DC II Closeout Meeting Pulsars in DC2 preliminary results from an “optimized” analysis Gamma-ray Large Area Space Telescope Massimiliano.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Diagnostics Framework James Swain Stanford Linear Accelerator.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project DOE/NASA Review, March 31, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager
GLAST LAT Project LAT Instrument Analysis Workshop – Feb 27, 2006 Hiro Tajima, TKR Data Processing Overview 1 GLAST Large Area Telescope: TKR Data Processing.
Feb. 7, 2007First GLAST symposium1 Measuring the PSF and the energy resolution with the GLAST-LAT Calibration Unit Ph. Bruel on behalf of the beam test.
GLAST LAT Project Technical/Cost/Schedule Review 06/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
LAT-MD August 2006 LAT Requirement Sell-off Package GLAST Large Area Telescope Gamma-ray Large Area Space Telescope GLAST Large Area Telescope.
GLAST User’s Committee Meeting– 1 – June 6-7, 2005 GLAST Burst Monitor (GBM) Chip Meegan NASA/MSFC.
GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 9 of 12 LAT Test Results 1 GLAST Large Area Telescope LAT Pre-Shipment Review LAT.
GLAST LAT ProjectGSFC Monthly, 30 March 2006 LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering LAT Quality Assurance Pat Hascall.
GLAST LAT Project Instrument Analysis Meeting– Feb 28, 2006 Tsunefumi Mizuno TowerTrend_ ppt 1 Tracker Parameters Trending Monitor GLAST I and.
GLAST LAT Project IFC Tour – Sep 5,2003 Larry Wai 1 GLAST Large Area Telescope: Integration and Facility Status Larry Wai SU-SLAC Integration and Facility.
Gamma-ray Large Area Space Telescope Tower 1 TVAC tests Bad ladders issues.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 D. Nelson 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectMRB 09/14/2005 L. Latronico1 Tower 14 – Layer Y0 malfunction MRB Meeting – 14 September 2005.
GLAST LAT Project LAT Instrument Analysis Meeting– Aug 29, 2005 Hiro Tajima, TKR Updates at SLAC 1 GLAST Large Area Telescope: TKR Updates at SLAC Hiro.
GLAST LAT Project13 June 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST LAT System Engineering
GLAST LAT System Engineering
LAT Test Results GLAST Large Area Telescope LAT Pre-Shipment Review
Overview Goal Study GEM variables in SVAC ntuple
Mini Tower Preliminary Results
GLAST LAT System Engineering
GLAST Large Area Telescope: I&T Test Readiness Review
GLAST Large Area Telescope:
Studies of the Time over Threshold
SVAC Configuration Verification
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT Project LAT Instrument Analysis Meeting – June 30, 2006 Hiro Tajima, TKR Efficiency Trending, NRL 1 GLAST Large Area Telescope: TKR Efficiency Trending during EMI/EMC NRL Hiro Tajima (SLAC) Mutsumi Sugizaki (SLAC) TKR Gamma-ray Large Area Space Telescope

GLAST LAT Project LAT Instrument Analysis Meeting – June 30, 2006 Hiro Tajima, TKR Efficiency Trending, NRL 2 Analyzed runs Efficiency is trended for runs during EMI/EMC NRL. –Run# range analyzed: –Basic analysis is integrated with SVAC analysis and automatic. Only runs with duration > 1000 seconds are trended. –Minimum necessary for efficiency calculation. –Not intended to catch inefficiency due to EMI/EMC. –Exercise efficiency trending. Summary of newly observed anomalies. –Bay 3 Y6, Bay 5 X14, Bay 5 Y12, Bay 6 Y3, Bay 7 Y16, Bay 8 X11, Bay 8 X7 No new disconnected strips. Consistently lower efficiencies (2–4%) for all EMI runs. No plausible reason for inefficiencies. –Bay 10, Y6: Noise flare –Bay 15, X11: First evidence of the inefficiency on adjacent ladder by noise flare due to high rate of noise flare. Known anomalies. –Bay 13, X13: Due to extremely hot strips.

GLAST LAT Project LAT Instrument Analysis Meeting – June 30, 2006 Hiro Tajima, TKR Efficiency Trending, NRL 3 Bay 3 (FM15) Y6 Almost all EMI/EMC runs affected. Known hot/dead strips –757, 758, 1338, 1339 Many more inefficient region for no reason. –Further investigation. — this run — reference

GLAST LAT Project LAT Instrument Analysis Meeting – June 30, 2006 Hiro Tajima, TKR Efficiency Trending, NRL 4 Bay 5 (FM1) X14 Known disconnected strips. – Mysterious inefficiency — this run — reference

GLAST LAT Project LAT Instrument Analysis Meeting – June 30, 2006 Hiro Tajima, TKR Efficiency Trending, NRL 5 Bay 5 (FM1) Y12 Known disconnected strips – — this run — reference

GLAST LAT Project LAT Instrument Analysis Meeting – June 30, 2006 Hiro Tajima, TKR Efficiency Trending, NRL 6 Bay 6 (FM12) Y3 No known bad strip. — this run — reference

GLAST LAT Project LAT Instrument Analysis Meeting – June 30, 2006 Hiro Tajima, TKR Efficiency Trending, NRL 7 Bay 7 (FM13) Y16 No known bad strip. — this run — reference

GLAST LAT Project LAT Instrument Analysis Meeting – June 30, 2006 Hiro Tajima, TKR Efficiency Trending, NRL 8 Bay 8 (FM5) X11 No known bad strip. — this run — reference

GLAST LAT Project LAT Instrument Analysis Meeting – June 30, 2006 Hiro Tajima, TKR Efficiency Trending, NRL 9 Bay 8 (FM5) X7 No known bad strip. — this run — reference

GLAST LAT Project LAT Instrument Analysis Meeting – June 30, 2006 Hiro Tajima, TKR Efficiency Trending, NRL 10 Bay 10 (FM7) Y6 Entire ladder shows ~10% inefficiency due to noise flare. No effect on adjacent ladder on the same GTRC. — this run — reference

GLAST LAT Project LAT Instrument Analysis Meeting – June 30, 2006 Hiro Tajima, TKR Efficiency Trending, NRL 11 Bay 13 (FM4) X13 Inefficiency due to known “new” hot strips, 1141 and New mask xml files released to I&T about a month ago, but they have not been incorporated yet. –Masking hot strips will not help if preamplifiers are saturated. — this run — reference

GLAST LAT Project LAT Instrument Analysis Meeting – June 30, 2006 Hiro Tajima, TKR Efficiency Trending, NRL 12 Bay 15 (FM11) X11 Known to flare. –First evidence that noise flare affect efficiencies on adjacent ladder. — this run — reference