Evolution and Prospects of Relay Protection and Automation Systems Evolution and Prospects of Relay Protection and Automation Systems Moderator: Janez.

Slides:



Advertisements
Similar presentations
SUBSTATION AUTOMATION SYSTEM
Advertisements

Study Committee Representatives Annual Report December, 2012
SIPROTEC 4 Distance Protection 7SA6 1 1.
G GE Power Management DDS Integrated P&C System INTGRATED PROTECTION AND CONTROL SYSTEM DDS INTEGRATED PROTECTION INTEGRATED CONTROL.
Microprocessor-Based Relays: Implementation, Conflicts, and Corrective Actions Steven V. Deases AEP – Station Engineer.
EVD4 - The Smart eVolution Primary distribution circuit-breaker with integrated protection, control and sensors © ABB Group 15. April 2017 | Slide 1 1.
Megger - Substation overview product groups, 2600 products.
SYMAP-BC SYMAP-BC.
SC B5 - Protection and Automation Report to the Canadian National Committee of CIGRÉ 2010 Simon R. Chano Protection Specialist Hydro Québec TransÉnergie.
EVENT LOGGER Contd..  Process of Data Down Load  Data Down Load to Station Monitoring System.
© ABB Group June 10, 2015 | Slide 1 1MRS A self healing power system for the accurate fault location and zone concept T&D Smart Grids Europe 2012.
ABB Connectivity & Smart Grid Ahmed Fahmy,Senior Technical Promoter Novmber 2014 NEMA technical workshop.
Unit Transformer Unit transformer are step up transformer which is connected to generating house & step up voltage from 15kV voltage to 132 voltage level.
1 PCA2 On-load Protection Condition Analyser. 2 PCA2 online testing concept Concept introduction: PCA2 is a new system test approach intended to save.
Industrial Systems Introducing the L90 Universal Relay Advanced transmission line protection and control High-speed current differential protection for.
FIRE ALARM SYSTEMS AND FUNDAMENTALS
MIG II DIGITAL FEEDER PROTECTION
INTEROPERABILITY Tests IOP11/ IEC Interoperability with IEC IEC INTEROPERABILITY BETWEEN ABB, ALSTOM and SIEMENS STATUS REVIEW.
G650 Generator Protection & Control System
THE ELECTRIC SUB STATION
Scheduled Versus Event Driven Testing of Distribution Protection IEDs Dr. Alexander Apostolov, Benton Vandiver, Will Knapek, OMICRON electronics.
Adaptive Protection of Distribution Feeders Alexander Apostolov, Benton Vandiver.
Frankfurt (Germany), 6-9 June 2011 V Ramesh – India – Session 1: Network components – 1096 Integrated Switching Devices (ISD) V.RAMESH ABB Limited, Nashik,
POWER SYSTEM PROTECTION
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
All rights reserved MV SWITCHGEAR.
A. Lisowiec 1, A. Nowakowski 1, Z. Kołodziejczyk 1, B. Miedziński 2 1 Centre For Tele-Information Systems and Hardware Applications, Tele and Radio Research.
1200 kV AC Substations - Products and Integrated Solutions International UHV Symposium New Delhi, 29. January 2009 Edelhard Kynast Siemens AG, Energy.
1 POWER QUALITY -- Bhanu Bhushan -- April, Simple examples around us : Ceiling fan regulators Tube lights Lap-tops & peripherals Domestic inverters.
SC B5 - Protection and Automation Report to the Canadian National Committee of Cigré 2007 Simon R. Chano Protection Specialist Hydro Québec TransÉnergie.
PS ERC New Pserc Projects Mladen Kezunovic. PS ERC Newly approved projects "...Enhanced Reliability..." Kezunovic "...Automated Integration..." McCalley.
Summary Rich Bauer, Senior Reliability Engineer Event Analysis Subcommittee – LL Update March 04, 2014.
©2009 Mladen Kezunovic. Improving Relay Performance By Off-line and On-line Evaluation Mladen Kezunovic Jinfeng Ren, Chengzong Pang Texas A&M University,
SC B5 - Protection and Automation Report to the Canadian National Committee of CIGRÉ 2009 Simon R. Chano Protection Specialist Hydro Québec TransÉnergie.
Protection & Switchgear
Electricity in the Home CBE. Wiring a plug DC and AC DC stands for “Direct Current” – the current only flows in one direction: AC stands for “Alternating.
A PRESENTATION OF PRACTICAL TRAINING ON “400KV GSS “ \
A Presentation On 132 KV GSS BEHROR
1 © ABB Automation Technologies AB, PTSX/TP/A Janez Zakonjsek PS03_Q11_SE Janez Zakonjsek.
Department of Electrical Engineering
132KV GSS PIPAR CITY JODHPUR
Submitted To:- Submitted By:- Mr.
Presentation Topic: Circuit Breakers Represented to: Dr. M. Riaz Khan Represented by: M. Mujahid.
Survey of Smart Grid concepts and demonstrations Smart substation Ari Nikander.
Distribution Solution. Distribution Solution - Topics Substation Automation Conventional vs New Technology RED 500 protection relays REJ, REU Multipurpose.
This project on Primary sub station of Visakhapatnam port trust at Visakhapatnam. It is 132kv/11kv substation with incoming feeder from APTransco and 11.
April 7, 2015 Washington, D.C. Area Low-Voltage Event Operations Training Seminar 2016 Erik Johnson System Operations Training (ERCOT)
© ABB - Page 1 IEC proven technology and innovation IEC UCA 2.0 IEC Communication concepts Data Models Ethernet Technology Process.
AUTOMATIC CIRCUIT RECLOSER
 The figure below shows a protection system for a transmission line, consisting of a CT, PT, a relay and its associated circuit breaker.
Power System Protective Relaying-Part One
6 Week industrial Training Presentation
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
Question 1.3: a) Is the evolution towards more integration and more fixed design solutions compatible with the variety of applications ? b) What.
Intelligent grid expansion – RheinEnergie AG, Germany
Protection Specialist
Summary Rich Bauer, Senior Reliability Engineer
CIGRE SC B5 COLLOQUIUM CALGARY
Cigre SCB5 Colloquium 2005 September, Calgary Preferential Subject 2
ABB INDIA DEVELOPMENT CENTER
Chapter 7 System Protection
Peter Erning, PSP-T11, Power Gen 2010
Protection Philosophy
Wojciech Szela, Edward Gdowik – PECO
Presentation transcript:

Evolution and Prospects of Relay Protection and Automation Systems Evolution and Prospects of Relay Protection and Automation Systems Moderator: Janez V. Zakonjšek

2 SC B5 Colloquium, Madrid 2007 Preferential Subject 2 – “Acceptable Functional Integration in Substation P&C for Transmission Systems” Question PS2-11 Is any user already planning to employ the “two boxes per bay” solution in transmission, or the “two boxes per substation” system? Are there equipment available in the market? When can these solutions be adopted? Which are the advantages and disadvantages or obstacles? How can these obstacles be overcome?

3 1 - Distance protection 2 - Three-phase power swing unit 3 - Directional earth fault protection 4 - AC supervision circuits 5 - DC supervision circuits 6 - STUB protection 7 - Auxiliary relays 8 - Fault locator 9 - (Printer for fault locator) 10 - Disturbance recorder 11 - Signaling unit 12 - Parts of event recorder 13 - Breaker failure protection - 1 CB 14 - Tripping relays 15 - Autoreclosing for one CB 16 - Synchrocheck for one CB 17 - Auxiliary transformers for disturbance recorder Two relay panels 600 mm x 650 mm x 2250 mm Functional Integration Functional Integration

4 1 - Distance protection 2 - Three-phase power swing unit 3 - Directional earth fault protection 4 - AC supervision circuits 5 - DC supervision circuits 6 - STUB protection 7 - Auxiliary relays 8 - Fault locator 9 - (Printer for fault locator) 10 - Disturbance recorder 11 - Signaling unit 12 - Parts of event recorder 13 - Breaker failure protection - 1 CB 14 - Tripping relays 15 - Autoreclosing for one CB 16 - Synchrocheck for one CB 17 - Auxiliary transformers for disturbance recorder Two relay panels 600 mm x 650 mm x 2250 mm E C Functional Integration Functional Integration

5 1 - Distance protection 2 - Three-phase power swing unit 3 - Directional earth fault protection 4 - AC supervision circuits 5 - DC supervision circuits 6 - STUB protection 7 - Auxiliary relays 8 - Fault locator 9 - (Printer for fault locator) 10 - Disturbance recorder 11 - Signalling unit 12 - Parts of event recorder 13 - Breaker failure protection - 1 CB 14 - Tripping relays 15 - Autoreclosing for one CB 16 - Synchrocheck for one CB 17 - Auxiliary transformers for disturbance recorder Two relay panels 600 mm x 650 mm x 2250 mm E C + SELF SUPERVISION +COMMUNICATION+++++ Functional Integration Functional Integration

6 And What Shall We Do Now? And What Shall We Do Now? RCC

7 And What Shall We Do Now? And What Shall We Do Now? RCC IEC61850

8 And What Shall We Do Now? And What Shall We Do Now? RCC IEC61850

9 And What Shall We Do Now? And What Shall We Do Now? RCC IEC61850

10 And What Shall We Do Now? And What Shall We Do Now? RCC IEC61850

11 And What Shall We Do Now? And What Shall We Do Now? RCC IEC61850 iiii

12 And What Shall We Do Now? And What Shall We Do Now? RCC IEC61850 iiii

13 And What Shall We Do Now? And What Shall We Do Now? RCC IEC61850 iiii Power

14 No problem with problems Power And What Shall We Do Now? And What Shall We Do Now? RCC iiii