MICE RF review 7-12-2011 Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.

Slides:



Advertisements
Similar presentations
1 paul drumm; Jan’05; MICE RF Needs MICE RF Power Paul Drumm ISIS Facility Rutherford Appleton Laboratory & MICE.
Advertisements

Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
FIGURE OF MERIT FOR MUON IONIZATION COOLING Ulisse Bravar University of Oxford 28 July 2004.
MICE the Muon Ionization Cooling Experiment Emilio Radicioni, INFN EPS-HEP Aachen 2003.
The Muon Accelerator Program “High”- Gradient Normal Conducting RF R&D Alan BrossUS HG Workshop February 9-10, Meeting the RF in Magnetic Field Challenge.
Changing the absorbers: how does it fit in the MICE experimental programme? Besides the requirement that the amount of multiple scattering material be.
CHIPP Sept 2005Jean-Sébastien GraulichSlide 1 What is MICE  Muon Ionisation Cooling Experiment  What is Ionisation Cooling ? Cooling = Reduction of Beam.
Alain Blondel MICE: Constraints on the solenoids 2.Field Homogeneity: or ? this will be dictated by the detector requirements. TPG will be.
MICE: The International Muon Ionization Cooling Experiment Diagnostic Systems Tracker Cherenkov Detector Time of Flight Counters Calorimeter Terry Hart.
MICE Project Board Alain Blondel 1 MICE running Preamble ISIS running Step I Step(s) IV Step V (and VI)
MICE analysis meeting Alain Blondel 5 August MICE -- what running strategy? disclaimer: of course we will evolve the running strategy as problems.
DPNC Sept 2007Jean-Sébastien Graulich MICE The international Muon Ionization Cooling Experiment o o Introduction o o Beam Line o o Cooling Channel o o.
MANX meeting 15 July 2008 Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment MICE in 2011.
CMPB Alain Blondel 14 April STATUS OF MICE.
MICE at STFC-RAL The International Muon Ionization Cooling Experiment -- Design, engineer and build a section of cooling channel capable of giving the.
MICE Video meeting Alain Blondel 7 December MICE -- what running strategy? reflections on steps I and II.
17 March 2005Edda Gschwendtner1 MICE Cooling Channel: Can we predict cooling to ? Edda Gschwendtner Challenge Systematics Cooling Channel Beam Line.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
MUCOOL RF Program Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MUTAC Review at BNL April 18, 2007.
201 MHz NC RF Cavity R&D for Muon Cooling Channels
MICE CM15 wrap-up Alain Blondel 11 June MICE News Collaboration meeting 8-11 June 2006 at Fermilab complete review of the project. for those who.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
Goals and Status of MICE The International Muon Ionization Cooling Experiment J.S. Graulich.
Status of the Muon Ionization Cooling Experiment (MICE) Yagmur Torun Illinois Institute of Technology April 1, 2013.
Particle Production in the MICE Beam Line Particle Accelerator Conference, May 2009, Vancouver, Canada Particle Production in the MICE Beam Line Jean-Sebastien.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
Results from Step I of MICE D Adey 2013 International Workshop on Neutrino Factories, Super-beams and Beta- beams Working Group 3 – Accelerator Topics.
MICE Step 1: First Emittance Results with Particle Physics Detectors Linda R. Coney EuCARD Meeting – 10 May 2011.
ICHEP 2012 Melbourne, 7 July 2012 Paul Soler on behalf of the MICE Collaboration The MICE Beam Line Instrumentation (Trackers and PID) for precise Emittance.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
Alain Blondel. AIDA-Neutrino meeting AIDA Neutrino detector studies 1. News from the neutrino scene 2. Beam requirements for AIDA 3. Discuss.
-Factory Front End Phase Rotation Gas-filled rf David Neuffer Fermilab Muons, Inc.
MCTF 8/17/06 A. Bross MTA Activities and Plans MCTF August 17, 2006 A. Bross.
MICE at STFC-RAL The International Muon Ionization Cooling Experiment -- Design, engineer and build a section of cooling channel capable of giving the.
MICE CM16 Goals Alain Blondel 8 October MICE CM 16 Collaboration meeting 8-11 October 2006 at RAL Goals of the meeting thanks to John Cobb & Marco.
MICE RF Workshop Alain Blondel MICE = critical R&D for neutrino factory and muon collider 1 neutrino factory: accelerate muons and store to produce.
RF studies at Fermilab MuCool Test Area Fermilab MuCool Test Area MuCool Test Area (MTA) at Fermilab is a dedicated facility at the end of the LINAC built.
Recent progress of RF cavity study at Mucool Test Area Katsuya Yonehara APC, Fermilab 1.
MICE CC visit at CERN Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
MICE: The International Muon Ionisation Cooling Experiment MOPLT106 Abstract The provision of intense stored muon beams would allow the properties of neutrinos.
MICE CMPB Alain Blondel 1 Highlights on MICE.
MICE FAC open session Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
DOE Program Review 5/17/06 A. Bross Muon Accelerator R&D DOE Program Review May 17, 2006 A. Bross.
29 September 2006M.Sakuda NuFact06 Asian Regional Outlook (Japan) -by Y.Kuno (Osaka) (1) SuperBeam (T2K) (2) J-PARC current upgrade plan (3) T2HK or T2KK.
A. Bross MICE CM17 February MuCool RF Program 805 and 201 MHz Studies.
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
CHIPP Aug 2010J.S. GraulichSlide 1 MICE and the Neutrino Factory Jean-Sebastien Graulich, Geneva.
- MICE - The Muon Ionization Cooling Experiment Jean-Sebastien Graulich, Univ. Genève o Introduction: Aims And Concept o Design o Infrastructure: Hall,
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
1 Alan Bross AEC March 31, 2008 MuCool RF Program Muon Cooling R&D Alan Bross.
Alain Blondel 4 March 2011 NEU2012 summary NEU2012: towards a concrete proposal by the neutrino community (emphasis on long baseline accelerator expts)
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
1 Neutrino detector test beam requirements 0. Disclaimer 1. News from the neutrino scene 2. Beam requirements for AIDA and others.
ch/~bdl/lepc/lepc.ppt 1 MICE Status and Plans Rikard Sandström Université de Geneve International Scoping Study CERN,
MICE CM30 Goals of the Meeting Alain Blondel 1 MICE CM30 – Goals and Status.
CHIPP Oct 2007Jean-Sébastien Graulich Status of MICE Jean-Sebastien Graulich, Univ. Genève o o Introduction o o Beam Line o o Technical Design o o PID.
Monte Carlo simulation of the particle identification (PID) system of the Muon Ionization Cooling Experiment (MICE) Mice is mainly an accelerator physics.
(one of the) Request from MPB
MICE S TEP IV P HYSICS ‘D ELIVERABLES ’ V. Blackmore MAP 2014 Spring Meeting 30 th May, /15 AKA “What will we learn from Step IV?”
Muons, Inc. Feb Yonehara-AAC AAC Meeting Design of the MANX experiment Katsuya Yonehara Fermilab APC February 4, 2009.
K. Long, 28 June, 2016 Introduction to MICE — and the role of the Hydrogen Delivery System.
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
MICE at STFC-RAL The International Muon Ionization Cooling Experiment -- Design, engineer and build a section of cooling channel capable of giving the.
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
Experimental Tests of Cooling: Expectations and Additional Needs
MuCool Test Area Dedicated facility built at the end of the Linac to address MuCool needs RF power 805MHz, 201MHz)
The Accelerator Complex from the International Design Study
Alain Blondel 11 October 2010 GDR NEU2012 summary
(Muon Ionization Cooling Experiment)
Design of the MANX experiment
Presentation transcript:

MICE RF review Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment

MICE RF review Alain Blondel MICE = critical R&D for neutrino factory and muon collider 2 neutrino factory: accelerate muons and store to produce neutrinos -- flux known to <±1% -- high energy electron neutrinos long baseline oscillation manifests itself by wrong sign muons: LARGE (100kton) magnetized iron detector Golden channel: Or opposite charges (and anti-) + unique ability to test e  

MICE RF review Alain Blondel Slide 3 T2KK: T2K 1.66 MW beam to 270 kton fid volume Water Cherenkov detectors in Japan (295km) and in Korea (1050 km); DUSEL: a WBB from Fermilab to a 300 kton WC in Dusel (1300km); SPL 4 GeV, EU-BB and BB+SPL: CERN to Fréjus (130km) project; NF bl is the Neutrino Factory baseline (4000km and 7000km baselines) and NF Py+INO represents the concrete baseline from CERN to Pyhasalmi mine in Finland (2285 km) and to INO in India (7152 km); PS2-Slanic is a preliminary superbeam study at 1500km based on an upgrade of PS2 to 1.66MW and a 100kton Liquid Argon TPC CERN – SPC panel report, Figure 2 A representative compilation of sensitivities of some future long baseline projects. Here the fraction of  CP where CP violation can be observed at 3 standard deviations is plotted as a function of  13.

MICE RF review Alain Blondel Neutrino Factory and Muon Collider rest heavily on -- ionisation cooling -- more generally manipulations of muon beams within solenoid magnetic fields -- MANY VARIANTS! High Brilliance muon beams Principle is straightforward… transverse longitudinal Empty magnet + wedge absorber Magnet filled with (gas) absorber

MICE RF review Alain Blondel 5 Practical realizations are more delicate… IDS Neutrino Factory Cooling Figure of Merit MICE (from Study II 2001)

MICE RF review Alain Blondel 6 Practical realizations vary… But all contain solenoid magnets (for transport and focus) RF cavities (for re-acceleration) and absorbers (for cooling itself. Best is Liq H2)

MICE RF review Alain Blondel 7  Incoming muon beam Variable Diffuser Beam PID TOF 0 Cherenkov TOF 1 Trackers 1 & 2 measurement of emittance in and out Liquid Hydrogen absorbers 1,2,3 Downstream particle ID: TOF 2 KL, EMR RF cavities 1RF cavities 2 Spectrometer solenoid 1 Matching coils 1&2 Focus coils 1 Spectrometer solenoid 2 Coupling Coils 1&2 Focus coils 2Focus coils 3 Matching coils 1&2 10% cooling of 200 MeV/c muons requires ~ 20 MV of RF single particle measurements => measurement precision can be as good as  out /  in ) = never done before either…

MICE RF review Alain Blondel 8  Incoming muon beam Variable Diffuser Beam PID TOF 0, TOF 1 Cherenkovs Trackers 1 & 2 Liquid Hydrogen absorbers 1,2,3 Downstream particle ID: TOF 2, KL EMR RF cavitiesRF power Spectrometer solenoid 1 Spectrometer solenoid 2 Coupling Coils 1&2 Focus coils MICE Collaboration across the planet

MICE RF review Alain Blondel  MICE SCHEDULE update October 2011 STEP I STEP IV Q and 2013 STEP V STEP VI Run date: Completed EMR run Q Under construction:

MICE RF review Alain Blondel Coupling coil (Harbin China) 10 EMR (Geneva) Diffuser (Oxford) RF Amplifier (Daresbury) RF cavities (Berkeley) absorber windows (Mississippi) LiqH2 absorber (KEK) MICE construction: world-wide team effort! AFC Magnet (RAL/Oxford) Trackers (JP-UK-US) Aim for completion in 2016

MICE RF review Alain Blondel 11 RF requirements: 1.Baseline mode, step V and step VI 2.Beyond the baseline

MICE RF review Alain Blondel 12

MICE RF review Alain Blondel 13 MICE should cool by 10%. For 200 MeV particles this requires 23 MV of RF voltage. This could be reached with 4 RF cavities operating at 16MV/m, 201MHz However: 1.It is not clear that RF cavities could operate stably at this voltage in magnetic field 2.This would require 16 MW of peak RF power at room temperature  which we do not have 3.This would likely cause so much dark current that operation of detectors would be impossible. Dark current (electrons) grow as E 9 4. It was preferred to operate MICE with 8 cavities at 8MV/m

MICE RF review Alain Blondel 14 Nominal MICE step VI  will operate with 8 RF cavities at 8MV/m. This requires 1MW of peak RF power per cavity, shared among two RF couplers  Frequency 201 MHz. Value is not critical within ~1MHz RF cavities themselves are equipped with tuners Should be tuned to maximize RF cavities performance and then fixed and stable  Duty factor about e.g. 1ms RF pulse every second or 2ms every 2s if this is preferred are compatible with MICE beam operations (target dips in ISIS beam for 2ms) pulse longer than 2ms is not useful for MICE beam pulse shorter than 0.5 ms becomes inefficient

MICE RF review Alain Blondel 15 2 ms MICE particle spill Presently 1 every 2.56 seconds

MICE RF review Alain Blondel 16 Step V STEP V “sustainable” cooling: cooling happens in the absorbers but production of cool beam requires acceleration with RF cavities old simulation (at 88MHz) RF phase E out -E in -1- running with shutters to commission RF cavities (no beam needed) -1’- running with LH2 and RF first with no beam to check RF noise -2- running with beam with no RF and no LH2 to check optics -3- running with beam with LH2 no RF -4- running with beam with LH2 and RF -5- or running with solid absorbers? limited in optics and performance  step VI!

MICE RF review Alain Blondel 17 MICE is an R&D experiment Phases of individual cavities should be tunable to match changes in muon momentum from 140 to 240 MeV/c this should be routine operation and not require a specialist (presently done several times a day) Phase and Volts should be recorded in real time to match with muon measured arrival time Possibility to run higher gradients should be preserved -- by feeding more RF power to fewer cavities -- by cooling cavities at LN2 rather than water This is *not* routine operation (change over a shut down)

The main MICE issue What about RF in Magnetic Field?

The RF Challenge Significant degradation in maximum stable operating gradient with applied B field 805 MHz RF Pillbox data –Curved Be windows –E parallel B –Electron current/arcs focused by B Degradation also observed with 201 MHz cavity –Qualitatively, quite different Page 19 MICE Project Board September 23, 2010 Alan Bross

RF Test Facility MuCool Test Area (MTA) – RF power 201 MHz (5MW) 805 MHz (12 MW) – Class 100 clean room – 4T SC solenoid 250W LHe cryo-plant – Instrumentation Ion counters, scintillation counters, optical signal, spectrophotometer – 400 MeV p beam line Page 20 MICE Project Board September 23, 2010 Alan Bross

201 MHz Cavity Test Treating NCRF cavities with SCRF processes The 201 MHz Cavity – Achieved 21 MV/m – Design gradient – 16MV/m – At 0.75T reached MV/m However, No observed damage! Page 21 MICE Project Board September 23, 2010 Alan Bross