ASAS TN Session 4 summary Billy Josefsson, LFV Rob Ruigrok, NLR.

Slides:



Advertisements
Similar presentations
ASAS TN Second Workshop, 6-8 October 2003, Malmö ASAS-TN Implementation Strategy Plan Tony Henley BAE SYSTEMS.
Advertisements

ASAS Dream or reality? ASAS TN Workshop April 2003 Presented by Thomas Fixy Manager Air Traffic Information Management.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-101/PIA-3 ACAS Improvements Workshop on preparations for ANConf/12.
Direction générale de l’Aviation civile direction de la Technique et de l’Innovation sous-direction Etudes et Recherche appliquée direction des services.
1 Data Link Roadmap Overview Mike Shorthose, Helios Technology Jorge Grazina, European Commission 25 September 2002.
Advanced Safe Separation Technologies and Algorithms (ASSTAR) Project ASAS-TN2 Workshop #1 Malmö 26 th -28 th September 2005 ASSTAR is a Specific Targeted.
Applications from packages I to III
1st ASAS-Thematic Network 2 Workshop Malmoe 26th-28 th September 2005 “Implementation planning and future packages” Session Moderator: Giorgio MATRELLA.
International Civil Aviation Organization Block Upgrades Next Steps & AN-Conf/12 Alexander Korsakov Air Navigation Commissioner International Civil Aviation.
Workshop on preparations for ANConf/12 − ASBU methodology
CASCADE From Concept to Implementation SUR Division Meeting Brussels, 17 December 2007 Alex Wandels, Jörg Steinleitner, Sorin Muresean CASCADE Programme.
Gate-to-Gate Project: Implementing Sequencing, Merging, and Spacing Captain Bob Hilb September 11, 2006.
International Civil Aviation Organization and ISO/TC 211 ISO/TC 211 Seminar Berlin, 29 October 2003 ISO/TC 211 Seminar Berlin, 29 October 2003.
The ICAO Standardization Process. 2 Introduction Not going to attempt an introduction to ICAO Nor all its documentation ICAO produces international standards.
April 2003ASAS TN April 2003 Workshop1 ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Towards Implementation of ASA/GSA Package I” Pieter van der.
Page 1 Aircraft Surveillance Applications (Extracts from ASA MASPS, DO-289) Presented to ASAS-TN 3 rd Workshop Steve Koczo - Rockwell Collins Inc. Jonathan.
ASSTAR User Forum #1 Rome 4th April 2006 ASAS-TN2 Second Workshop ASSTAR Safety Approach and Preliminary Issues Dr Giuseppe GRANIERO, SICTA
SAFETY REGULATION COMMISSION SAFETY REGULATION COMMISSION Harmonisation of ATM Safety Regulation & ESARRs SAFETY REGULATION COMMISSION SAFETY REGULATION.
Clustering ASAS Applications ASAS-TN2 First Workshop, Malmö 26 to 28 September 2005 Fraser McGibbon BAE Systems.
ASAS-TN Second Workshop, 6-8 October 2003, MalmöSlide 1 Airborne Surveillance Applications included in ‘Package I’ Francis Casaux CARE/ASAS manager.
ASAS-TN Workshop Glasgow 11 September 2006 Alex Wandels CASCADE Programme Manager EUROCONTROL European Organisation for the Safety of Air Navigation CASCADE.
ASAS TN2 WP3: Assessing ASAS Applications Maturity Eric Hoffman EUROCONTROL.
1 EUROCAE EUROCAE Dedicated to Aviation Standardisation ASAS Standards: “From concept to equipment” David Bowen (Technical Secretary) April 24 th 2007.
3rd ASAS TN Workshop 19 April – 21 April rd ASAS TN Workshop Session 4: Strategy and Implementation Package I Requirements Focus Group (“Rapid.
Session 1: Progress and Status of Implementation and Standardisation CASCADE & RFG ASAS-TN2 5 th Workshop Toulouse 17 September 2007 Jörg Steinleitner.
International Data Link Symposium st October 2003, Newbury, UK FEASIBILITY STUDY FOR CIVIL AVIATION DATA LINK FOR ADS-B BASED ON MIDS / LINK16 Bob.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-84 Initial Capability for Ground-based Cooperative Surveillance SIP/2012/ASBU/Nairobi.
1 RFG Overview ASAS-TN Malmö September 2005 Jörg Steinleitner CASCADE Infrastructure WP Leader, EUROCONTROL European Organisation for the Safety.
ASAS WORKSHOP Roma April 2003 Airlines’ perspective Nicolas Zvéguintzoff Assistant Director- Technical / Financial Liaison – Europe.
ASAS-TN 3rd Workshop - Airbus ASAS Vision ASAS-TN 3 rd Workshop AIRBUS and Airborne Surveillance ASAS-TN 3 rd Workshop - Airbus and Airborne Surveillance.
1 ADS-B-NRA Status ASAS-TN Malmö September 2005 Jörg Steinleitner (prepared by Gilles Caligaris) CASCADE Infrastructure WP Leader, EUROCONTROL European.
Federal Aviation Administration AP23 : a snapshot on Package2 ASAS-TN2 Seminar 14 April Paris By Dragos Tonea, Eurocontrol Roberta Massiah, FAA.
1 Presentation to ASAS TN2 17 th September 2007 Mel Rees Head of Surveillance EUROCONTROL EUROCONTROL SURVEILLANCE STRATEGY.
ASAS TN2 Final Seminar Paris, April 2008 Recommendations by the ASAS Thematic Network Ken Carpenter.
Air Systems Division GROUND ASAS EQUIPMENT Michel Procoudine Gorsky ASAS TN2 – Workshop 5 Toulouse 17th-20th September 2007.
ASAS Thematic Network 2.5 Towards an ASAS-Global Network.
April 2003ASAS TN April 2003 Workshop1 ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Package I Architecture and CBA Activities” Pieter van der.
2 nd Workshop, April 2006 Session 4: Integrating ASAS in an evolving ATM system.
C-ATM User Group and ASAS…….. Presented on Behalf of the C-ATM User Group Billy Josefsson, LFV Group ASAS Thematic Network 2, Malmö /28.
ENAV S.p.A. 1 AENA / ENAV / DFS / LFV ASAS Thematic Network Workshop Malmoe, ASAS /ADS-B: SAMPLE ANSPs STRATGIES & EXPECTATIONS.
SSAP The European Strategic Safety Action Plan (SSAP) The History & Rationale.
Certification Considerations for the Implementation of ASAS Applications on Aircraft Kevin Hallworth: UK CAA ASAS-TN Seminar – October 2004.
Ensuring the Safety of Future Developments
ASAS TN Third Workshop, April 2004, Toulouse 1 Session 2 Functional and Technical issues and Solutions Chairperson : JC Richard Secretary : G Matrella.
Session 1: Progress and Status of Implementation and Standardisation RFG Status ASAS-TN2 4 th Workshop Amsterdam April 2007 Jörg Steinleitner CASCADE.
ASAS TN2 Final Seminar Paris, April Jean-Marc Loscos, DSNA chairman of the Airborne Surveillance Subgroup of the Aeronautical Surveillance.
A consolidated starting point from DFS / AENA / LFV ASAS Thematic Network Workshop Toulouse, Is ASAS /ADS-B needed for ANSP strategy?
ASAS in ATC Domain plans ADAS Initiative Dragos TONEA Eurocontrol Glasgow,13 th of September 2006 European Organisation for.
The CASCADE Programme Blueprint for ADS-B Deployment ASAS-TN2 Workshop – Amsterdam April 2007 Christos Rekkas CASCADE Deputy Programme Manager, EUROCONTROL.
4 th Workshop, Amsterdam, April 2007 Progress since 2003 First workshop in 2003 (Rome) Large number of successful R&D projects in US and Europe.
DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels ASAS operational improvements:
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
AVIATION SYSTEM BLOCK UPGRADES (ASBU)
Workshop on preparations for ANConf/12 − ASBU methodology
ADS-B OUT - IATA VIEW ADS-B SITF/11 – Jeju, Korea 24 – 27 April 2012
Chris Shaw, EUROCONTROL Experimental Centre
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Chris Shaw, EUROCONTROL Experimental Centre
EUROCONTROL SURVEILLANCE STRATEGY
International Civil Aviation Organization
ASSTAR Project Overview & User Forum Objectives
LSSIP Objective AOP04.1.
ASAS-TN2 5th Workshop Toulouse 17 September 2007 Jörg Steinleitner
COSCAP – SOUTH ASIA 19th MEETING OF THE STEERING COMMITTEE
P AIRPORT SURFACE DATALINK
International Civil Aviation Organization
Presentation transcript:

ASAS TN Session 4 summary Billy Josefsson, LFV Rob Ruigrok, NLR

Session STRATEGY and IMPLEMENTATION Martine Blaize, EUROPEAN Harmonisation in ATM safety regulation Jörg Steinleitner, Package I Requirements Focus Group (“Rapid Global Harmonisation”) DISCUSSION Jonathan Hammer, Aircraft Surveillance Applications (Extracts from ASA MASPS, DO-289) Tony Henley, ASAS TN Implementation Strategy DISCUSSION

EUROPEAN Harmonisation in ATM safety regulation EUROCONTROL SRC aims at ensuring a harmonised ATM safety regulatory framework across ECAC “TREND” ANSP separation from Regulator Binding requirements: -Eurocontrol SRC (ESARRs) -SES (regulations) -EASA (airworthiness)

ATM Safety codes Airport Safety codes Airworthiness codes Flight Operations Certification codes ICAO Annex 14 and associated doc ICAO Annex 11 and associated doc ICAO Annex 8 and associated doc ICAO Annex 6 ICAO Annex 6 and associated doc Total System Approach, valid for the ASAS case

ASAS implementations: -difficult to meet all safety regulations -difficult to get all actors involved approved by the authorities ESARR means of compliance: -ED78A /Do264 partial -Eurocae WG 53 complete SAF ASAS document is relevant Mathematical and operational proof needed EUROPEAN Harmonisation in ATM safety regulation

Package I Requirements Focus Group (RFG) (“Rapid Global Harmonisation”) The RFG was established in April 2003 to perform the “Co-ordinated Requirements Determination” of Package I –Involvement of all relevant stakeholder categories. The work of the group is a very important step towards world-wide interoperability, related to both the operational procedures and the technical infrastructure of Package I. In accordance with the rationale of the definition of Package I, the RFG supports a pragmatic approach towards the early and efficient implementation of Package I. –Taking benefit of the work already performed.

Package I Requirements Focus Group (“Rapid Global Harmonisation”) The RFG is a joint European/US activity : –Open to additional membership (e.g. Australia, Japan) OSED, SPR and INTEROP documents will be delivered : –Target date for final versions: December 2005; –Respecting pragmatic top-down and bottom-up relationships with other Package I deliverables; –Ownership is defined at regional level and is a key issue for acceptance (e.g. EUROCAE for SPR and INTEROP, EUROCONTROL for OSED)F

Package I Requirements Focus Group (“Rapid Global Harmonisation”) Use of RFG deliverables by : –States (to develop operational & technical ICAO standards); –Industry (to develop e.g. EUROCAE/RTCA standards); –Regulatory Authorities (to facilitate the end-to-end approval of the Package I applications). In this respect, the RFG supports but does not replace existing standardisation bodies and processes. In serving the needs of their “customers” with good material in an efficient way, the RFG has a huge responsibility for the early implementation of ‘Package I’.

Fast track applications: -Non Radar and Sequencing & Merging “Do not overload the fast track” OSED Harmonisation group = RFG Urgent need for educational effort towards stakeholders about ADS-B out and synergies with mode S update. (RFG should notify IATA) Package I Requirements Focus Group (“Rapid Global Harmonisation”), Issues

Overview of ASA MASPS – RTCA DO-289 ASA MASPS –Aircraft Surveillance Applications (ASA) Minimum Aviation System Performance Standards (MASPS) Provides system and sub-system performance requirements that to support ASA applications –Intended to provide framework for current and future applications ASA applications considered in MASPS –Detailed analyses Enhanced Visual Acquisition (EVAcq) Enhanced Visual Approach (EVApp) Airport Surface Situational Awareness (ASSA) Final Approach and Runway Occupancy Awareness (FARAO) Conflict Detection (CD) –‘Probing’ analyses (evaluation of future requirements) Approach Spacing for Instrument Approaches (ASIA) Independent Closely Parallel Approaches (ICSPA) Airborne Conflict Management (ACM)

Relationship between ASA MASPS and other RTCA Documents ASAS MOPS ASA MASPS (ASA System Requirements and appendices for descriptions and performance specifications for all initial ASA applications) ADS-B MASPS TIS-B MASPS Link MOPS (1090 ES, UAT, VDL-4) Surveillance Systems Other ASA Functions ASSAPCDTI MASPS MOPS SC186 Surveillance Systems Other Surveillance Systems Other Systems SC186 Systems FIS-B Navigation TISTCAS Weather Radar Terrain & Obstacles

Aircraft Surveillance Applications (ASA MASPS, DO-289) issues Mainly US involvement Applications categorized (ACL): -transmit –only -basic -intermediate -advanced 1 and 2 Allows for additional applications, backwards compatibility RFG to provide harmonised input to update ASA MASPS and MOPS

ASAS TN Implementation Strategy ASAS-TN WP3 Recommendations –Datalink –Applications –Implementation The Way Forward –Local implementations beneficial subsets of package 1 –Progressive introduction of package 2/3

Local Implementations Beneficial subsets of package 1 Non Radar area surveillance (ADS-B-NRA), Airport Surveillance (ADS-B-APT), Spacing (ASPA-S&M), (On Board Situation Awareness on airport surface (ATSA-SURF)) Small numbers of aircraft high local density retrofit avionics global interoperability

ASAS TN Implementation strategy,issues Minimal change to ground infrastructure How to be successful without 100% equipage Retrofit avionics should be affordable, ADS B in / out No change in separation responsibility Manoeuvre ‘advisor’ computation function required onboard Manual control of manoeuvres via autopilot No changes to ACAS Funding/ incentives

…so… What can be done? What will be done? What is allowed to be done?