Peter LICHARD CERN (NA62)1 NA62 Straw tracker electronics Study of different readout schemes Readout electronics frontend backend Plans.

Slides:



Advertisements
Similar presentations
MICE Fiber Tracker Electronics AFEII for MICE (Front end readout board) Recall: AFEs mount on ether side of the VLPC cass, with fibers going to the VLPCs.
Advertisements

Developing the Timepix Telescope Planning a Future Timepix Telescope Richard Plackett – VELO Testbeam Meeting CERN, 7th October 09.
CMS Week Sept 2002 HCAL Data Concentrator Status Report for RUWG and Calibration WG Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
RPC Electronics Status Overall system TDC –Digitizing frequency issue (determine the bin size of the TDC value) Discriminator test result Trigger module.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
RPC Electronics Overall system diagram –At detector –Inside racks Current status –Discriminator board –TDC board –Remaining task.
4 Dec 2001First ideas for readout/DAQ1 Paul Dauncey Imperial College Contributions from all of UK: result of brainstorming meeting in Birmingham on 13.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
Upgrade developments in Clermont-Ferrand Romeo Bonnefoy and François Vazeille Tilecal upgrade meeting (CERN, 13 June 2014) ● Handling tools ● Deported.
U niversity of S cience and T echnology of C hina Design for Distributed Scheme of WCDA Readout Electronics CAO Zhe University of Science and Technology.
Straw electronics Straw Readout Board (SRB). Full SRB - IO Handling 16 covers – Input 16*2 links 400(320eff) Mbits/s Control – TTC – LEMO – VME Output.
Huazhong Normal University (CCNU) Dong Wang.  Introduction to the Scalable Readout System  MRPC Readout Specification  Application of the SRS to CMB-MRPC.
Trigger Supervisor (TS) J. William Gu Data Acquisition Group 1.TS position in the system 2.First prototype TS 3.TS functions 4.TS test status.
SODA: Synchronization Of Data Acquisition I.Konorov  Requirements  Architecture  System components  Performance  Conclusions and outlook PANDA FE-DAQ.
Main Board Status MB2 v1 for FATALIC & QIE 10/06/2015Roméo BONNEFOY - LPC Clermont1 Roméo BONNEFOY François Vazeille LPC Clermont-Ferrand.
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
HBD FEM the block diagram preamp – FEM cable Status Stuffs need to be decided….
HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
Muon Electronics Upgrade Present architecture Remarks Present scenario Alternative scenario 1 The Muon Group.
Serial Data Link on Advanced TCA Back Plane M. Nomachi and S. Ajimura Osaka University, Japan CAMAC – FASTBUS – VME / Compact PCI What ’ s next?
NUMI Off Axis NUMI Off Axis Workshop Workshop Argonne Meeting Electronics for RPCs Gary Drake, Charlie Nelson Apr. 25, 2003 p. 1.
Status of NA62 straw electronics Webs Covers Services Readout.
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
NA62 straw tracker readout status Georgios Konstantinou
First Results from the NA62 Straw Spectrometer E uropean P hysical S ociety 2015, Wien Vito Palladino - CERN On Behalf of NA62 Collaboration.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
01/04/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
Performance of Programmable Logic Devices (PLDs) in read-out of high speed detectors Jack Fried INSTRUMENTATION DIVISION PLD ? PLD ? Muon Tracker PLD Muon.
KLM Trigger Status Barrel KLM RPC Front-End Brandon Kunkler, Gerard Visser Belle II Trigger and Data Acquistion Workshop January 17, 2012.
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
TTC for NA62 Marian Krivda 1), Cristina Lazzeroni 1), Roman Lietava 1)2) 1) University of Birmingham, UK 2) Comenius University, Bratislava, Slovakia 3/1/20101.
Links from experiments to DAQ systems Jorgen Christiansen PH-ESE 1.
NA62 straw readout Characterization and qualification of the frontend electronics Detector and interface to frontend Small readout system Plans Expected.
Straw electronics status  Signal generation and formation in straw  Webs + Cover  Backend  TTC  Services + DCS  New engineer on VIA program Georgios.
Peter LICHARD CERN (for NA62) 1 NA62 Straw detector read-out system Introduction to NA62 NA62 layout Straw detector Requirements for straw detector electronics.
Preparation for production phase Web – New web with HV pigtail qualified (?) – Installed on 2 views in Technical run Very little effect on noise; detector.
The NA62 Spectrometer Acquisition System TWEPP 2015, Lisbon Peter Lichard and Vito Palladino - CERN On Behalf of NA62 Straw Working Group.
Maurice Goodrick, Bart Hommels CALICE-UK Meeting, Cambridge CALICE DAQ Developments DAQ overview DIF functionality and implementation EUDET.
CBM-TOF-FEE Jochen Frühauf, GSI Picosecond-TDC-Meeting.
09/09/2010 TDAQ WG - Louvain 1 LKr L0 trigger status report V. Bonaiuto, A. Fucci, G. Paoluzzi, A. Salamon, G. Salina, E. Santovetti, F. Sargeni, F. Scarfi’
CLAS12 Central Detector Meeting, Saclay, 3 Dec MVT Read-Out Architecture & MVT / SVT Integration Issues Irakli MANDJAVIDZE.
X SuperB Workshop - SLAC Oct 06 to Oct 09, 2009 A.Cotta Ramusino, INFN Ferrara 1 SuperB IFR: outline of the IFR prototype electronics A.C.R
29/05/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
GGT-Electronics System design Alexander Kluge CERN-PH/ED April 3, 2006.
Peter LICHARD CERN (for NA62) 1 NA62 Straw detector read-out system NA62 layout Straw detector Requirements for straw detector electronics Readout electronics.
LHCb Outer Tracker Electronics 40MHz Upgrade
DAQ ACQUISITION FOR THE dE/dX DETECTOR
Development of T3Maps adapter boards
Status of NA62 straw electronics and services
Status of NA62 straw readout
Jinfan Chang Experimental Physics Center , IHEP Feb 18 , 2011
CALICE DAQ Developments
PID meeting SNATS to SCATS New front end design
NA62 Straw tracker electronics
L0 processor for NA62 Marian Krivda 1) , Cristina Lazzeroni 1) , Roman Lietava 1)2) 1) University of Birmingham, UK 2) Comenius University, Bratislava,
CMS EMU TRIGGER ELECTRONICS
COVER Full production should arrive today
Front-end electronic system for large area photomultipliers readout
VELO readout On detector electronics Off detector electronics to DAQ
LHCb calorimeter main features
RPC Front End Electronics
RPC FEE The discriminator boards TDC boards Cost schedule.
PID meeting Mechanical implementation Electronics architecture
RPC Electronics Overall system diagram Current status At detector
Digitally subtracted pulse between
PHENIX forward trigger review
Presentation transcript:

Peter LICHARD CERN (NA62)1 NA62 Straw tracker electronics Study of different readout schemes Readout electronics frontend backend Plans

Peter LICHARD CERN (NA62)2 NA62 straw tracker data flow 2 STRAW READOUT & CONTROL STRAW READOUT & CONTROL STRAW READOUT & CONTROL STRAW READOUT & CONTROL 1 chamber contains 2 modules 1 module contains 2 views 1 view is a smallest readout system 28 FE boards from 1 view (2 groups of 14 boards) 2 Straw Readout Boards 2 fibers TELL1 Serving 2 chambers (2x4 views)

NA62 straw tracker FrontEnd electronics First experience with frontend board connector already torn off and PCB damaged heavy cable, mechanical fixation not easy special thick PCB, vacuum tight, drilling not possible only SMD components, vertical (no space on the side) vertical SMD connectors usually considered board-to-board Peter LICHARD CERN (NA62)3

NA62 straw tracker FrontEnd electronics with VHDCI connector Front end connectivity Data to DAQ on 16 differential (LVDS) lines for group of 16 straws Control from DAQ on 5 differential lines (I2C, TP) Power 8V changing connectors for HONDA VHDCI, 68 pins Standard SCSI halogen- free cable Submit modifications to CERN design service this week Cable problem will stay Peter LICHARD CERN (NA62)4

NA62 straw tracker FrontEnd electronics Peter LICHARD CERN (NA62)5

NA62 straw tracker FrontEnd electronics with RJ45 connector Use smaller cable to circumvent mechanical problems Serial I/O interfaces FPGA contains TDC, derandomizer, serial link Using high speed serial links can also help with crosstalk as CARIOCA has a bandwidth of ~20 MHz Data flow from 1 FE board –30 bits BX + 3(4) bits fine time + r/f edge + 4 bits straw ID + 1 bit control = 40 bits –8B10B coding –~800 MBits/s possible in CYCLONEIII, aim for ~160 MBits/s –Category 5e ethernet cable (shielded), 5 meters –Average rate 33kHz Need 42 MBits/s 1 link 160 Mbits/s sufficient –Max rate 500kHz on some straws Need 320 Mbits/s 2 links 160 MBits/s (using spare output), can also increase the speed if needed –Derandomizer on TDC chip to prevent data loss

NA62 straw tracker FrontEnd electronics with RJ45 connector Control flow from FE board to backend –Using the same line as for data, used only in SPS gaps –Read back threshold values –Read back FPGA registers Control input –Uses 1 line, Manchester coding, 80MHz ? –FPGA control –Writing thresholds –Sending even/odd TP –Sending BC counter reset Clock –Uses 1 line –Could use control line for clock as well, but better separate line for lower jitter Spare line –Used for data transmission for highest rate straws

NA62 straw tracker FrontEnd electronics with RJ45 connector Front end connectivity ethernet connector (RJ45) 4 differential lines Data to DAQ on 1 differential (LVDS) line for group of 16 straws Control from DAQ on 1 differential line precise clock 40 MHz 1 differential line spare (output for high rate straws?) Power 8V and DCS on separate connector Use standard halogen free ethernet cable Submit modifications to CERN design service next week Peter LICHARD CERN (NA62)8 TDC and serializer CYCLONEIII FPGA in 256 pins FBGA package SMD RJ45 Vertical connector

NA62 straw tracker electronics Required TDC resolution –‘fast’ gas Ar/CO2, muon test beam –On X is bin (not resolution) –Blue, unknown R-T dependence –Red, known R-T dependence

Peter LICHARD CERN (NA62)10 NA62 straw tracker electronics plans Frontend –Equip new detector prototype with prototype FE boards based on CARIOCA and equipped with VHDCI TDC+ethernet connectors –Lab measurements CARIOCA alone connected to the prototype Signal shape (afterpulses) crosstalk, different straw terminations Noise etc 10

Peter LICHARD CERN (NA62)11 NA62 straw tracker electronics plans Backend –testbeam Build small VME readout, possibly scalable and upgradable to full DAQ –VME 9U board –8 connectors (groups of 16 straws), 68 pins VHDCI connector »4 served by FPGA TDC with 1.5ns or 3.1ns bin »4 served by HPTDC –4 ethernet connectors, 8 pins RJ45 »TDC is on the frontend »Only low level event building –Preliminary study shows TDC with ~1ns resolution (1.5ns bin) feasible for 16 straws in ALTERA CYCLONE III FPGA (~20 Euro) »~2 ns resolution (3ns bin) ?, using slower chip (~12 Euro) –Data collected by SBC through VME –Used for lab tests and testbeam

Peter LICHARD CERN (NA62)12 NA62 straw tracker electronics plans Backend –Final If serial link solution works –number of SRBs reduces to 4/chamber –All readout fits to 1 crate VME 9U Need to find housing for 2 TELL1 boards and define connection (fiber/Cu) –TELL1 needs non-standard VME crate, impossible to plug in crate with Straw Readout Boards 12