May 19, 2008SSWG #19 Göttingen1 Robert Stobie Prime Focus Imaging Spectrograph Status Optics repair positive progress: –UV efficiency –Some (repair-caused)

Slides:



Advertisements
Similar presentations
University College London, Optical Science Laboratory bHROS Progress bench-mounted High Resolution Optical Spectrograph bHROS bHROS Progress General.
Advertisements

MMIRS 1 MMIRS MMT and Magellan Infrared Spectrograph Brian McLeod.
1 ATST Imager and Slit Viewer Optics Ming Liang. 2 Optical layout of the telescope, relay optics, beam reducer and imager. Optical Layouts.
SALT RSS-NIR MID-TERM REVIEW MAY 20 & 21, 2009 ANALYTIC OPTICS KENNETH NORDSIECK UNIVERSITY OF WISCONSIN.
ARCTIC Post-PDR Optical Design Study
VLBI: Visible Light Broadband Imager Instrument Conceptual Design Presentation Tom Berger Lockheed Martin Solar and Astrophysics Lab.
Upcoming Review of the Hall D Photon Beam and Tagger Richard Jones, University of Connecticut, for the GlueX collaboration GlueX Collaboration Meeting.
Optimizing power to the detectors To avoid dark-current errors and bit-noise errors in your data, all four PSD detectors need a high SUM reading. However.
M2FS: Michigan/Magellan Fiber System. M2FS (Michigan/Magellan Fiber System) Fiber-fed MOS w/2 independent and identical spectrograph arms 256 total fibers.
MMT AO run Jan Timeline: –Night 1: Install hardware during MMT engineering –Nights 2-4: AO engineering with fast-framing H camera (Indigo) –Nights.
Figure 1, MODS exploded Figure 2, Blue Camera Design Figure 3, Blue Camera Structure Figure 4, MODS CCD Dewar Figure 5, MODS I 4k x 4k CCD Figure 6, QE.
SDW2005, juin, Taormina The Corot Space instrument.
Astronomical Spectroscopy
Oct 17, 2001SALT PFIS PDR - Structure1 Structure Interface/ constraints Loads Structure design rationale Truss Weight and CG Finite Element Analysis/ Image.
Oct 22, 2007SSWG #18 UKZN1 Robert Stobie Prime Focus Imaging Spectrograph Status Optics repair Schedule Status of other fix and improvement projects Budget.
SIAMOIS, kickoff meeting, Paris, may, SIAMOIS: optical test bench BOSS (Banc Optique SiamoiS) Pernelle Bernardi Observatoire de Paris-Meudon,
August 2 and 3, 2010 KOSMOS Design Considerations Jay Elias.
SALT Technology Development Lisa Crause India-South Africa Astronomy Workshop – SAAO 6 August 2012.
SALT HRS Lisa Crause for Durham CfAI & SALT Ops SALT Board Meeting #35, Chapel Hill, 5 June 2014.
Magellan F/5 System Status A.Szentgyorgyi/SAO/30 Apr 2005.
Nov 6, 2005SSWG1 Robert Stobie Prime Focus Imaging Spectrograph Status Reassembly and retesting in Cape Town Estimated CTC $343,000 (7.3%) over PDR cap.
August 2 and 3, 2010 Project Cost, Schedule, Risk and Contingency Jay Elias.
DEIMOS Presentation to the SSC January 25, Outline Quick overview of Budget and Schedule (web version has no Budget figures) Progress Since Last.
ZTFC 12-segment field flattener (and related) options R. Dekany 07 Aug 2012.
17/18 May 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 17/18 May 2003 Univ. of Michigan,
Oct 17, 2001SALT PFIS Preliminary Design Review Optical Integration and Test Plan 1 Southern African Large Telescope Prime Focus Imaging Spectrograph Optical.
Magellan F/5 System Status A.Szentgyorgyi/SAO/25 Sept 2004.
High Resolution Echelle Spectrograph for Chinese Weihai 1m Telescope. Leiwang, Yongtian Zhu, Zhongwen Hu Nanjing institute of Astronomical Optics Technology.
Integral Field Spectrograph Eric PRIETO CNRS,INSU,France,Project Manager 11 November 2003.
Telescope Integration and Tests Tuesday Afternoon.
Multiplexed High Res Spectroscopy at Keck – J. Cohen (PI), H. Epps (Optical Design), M. Rich (Project Scientist) Keck instruments for optical spectroscopy.
Page 1lOhcO 9 meeting From MDI to HMI Jesper Schou Stanford University
The Hobby-Eberly Telescope Mirror Alignment Recovery System Marsha Wolf Graduate Student UT Astronomy Department.
Magellan F/5 System Status A.Szentgyorgyi / Ann Arbor 25 Sept 2005.
6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 6-7 October.
May 22, 2007SSWG #17 UNC1 Robert Stobie Prime Focus Imaging Spectrograph Status Optics repair - in progress! Status of other fix and improvement projects.
Oct 30, 2003PFIS - Student Wkshop1 The Prime Focus Imaging Spectrograph – Old Challenges and New Ones K. Nordsieck, Principal Investigator Jeff Percival,
The Prime Focus Imaging Spectrograph Design and Capabilities
Oct 26, 2007SALT Workshop UKZN1 Robert Stobie Prime Focus Imaging Spectrograph Science Rationale Modes –Fabry-Perot Spectral Imaging –Grating Spectroscopy;
Oct 17, 2001SALT PFIS Preliminary Design Review1 Southern African Large Telescope Prime Focus Imaging Spectrograph Mechanical Mechanism Design Michael.
Binospec - Next Generation Optical Spectrograph for the MMT
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
Oct 24, 2006SSWG1 Robert Stobie Prime Focus Imaging Spectrograph Status On-telescope throughput analysis Ghost analysis Repair plan Status of other current.
DBSP-R Upgrade Progress Review The DBSP-R Team DBSP-R Progress Review.
Jan 15, 2004WFC3 TIPS – John W. MacKenty1 WFC3 TIPS Presentation January 15, 2004 Optical Stimulus.
9/24/05MagE Update SAC meeting Developments with MagE Complete layout of Spectrograph structure and camera by B. Bigelow –Structure will be all anodized.
Page 1HMI/AIA Science Meeting – February 13, 2006 HMI Instrument Status HM/AIA Science Meeting February 13, 2006 Barbara Fischer HMI Deputy Program Manager.
IFS prototype – PM3 LAM, 13/06/2003 Prototype testing at CRAL Tests at room temperature in the visible.
Apr 29, 2003SSWG1 Prime Focus Imaging Spectrograph Status Passed CDR- moving into fabrication phase Mechanism design complete: fabrication drawing packages.
Oct 17, 2001SALT PFIS PDR - Optics1 Optics Refractive Optics - Design rationale Performance Slitmasks Gratings Polarimetric Optics Risks and Concerns Kenneth.
Oct 10, 2002SSWG1 Prime Focus Imaging Spectrograph Status Engineering Status Optics Mechanical Control System Management Budget Schedule.
FIRE: Status update and Preliminary Commissioning Plan Rob Simcoe (A. Burgasser, M. Smith, R. Bernstein, B. Bigelow, J. Pipher, C. McMurtry, W. Forrest)
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
PACS IBDR MPE 27/28 Feb 2002 AIV 1 PACS IBDR Test Cryostat and OGSE Gerd Jakob MPE.
Apr 29, 2003SSWG - CDR Comments1 PFIS Critical Design Review Comments Detailed response available in document SALT- 3100BP0011 (PFIS web site) Responses.
Brenna Flaugher, PMG, April 6, 2007 DECam Funding Need Profile (Dec 06) (then yr $, Overhead included) This gave a technically driven schedule resulting.
The Prime Focus Imaging Spectrograph for the Southern African Large Telescope: Operational Modes Chip Kobulnicky – Instrument Scientist, University of.
11/12/20151 Status of high intensity polarized electron gun project at MIT-Bates Evgeni Tsentalovich MIT.
Prime Focus Imaging Spectrograph Status
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
30-Nov-2006 Jean-Marc Defise - CSL
Prime Focus Imaging Spectrograph Status
Design of the He and HB ODU
Budget Budget Contingency/ Cost Risks Descope Options
An IFU slicer spectrometer for SNAP
Overview Instrument Role Science Niches Consortium science
FourStar 4K x 4K JHK imager
Polarimetry: Waveplate Modulation; Calibration
LGS Project Meeting December 21, 2006 Agenda SWIFT update - A. Bouchez
Meeting 11 Polarimetry: Beamsplitter; data formats Ken Nordsieck
Presentation transcript:

May 19, 2008SSWG #19 Göttingen1 Robert Stobie Prime Focus Imaging Spectrograph Status Optics repair positive progress: –UV efficiency –Some (repair-caused) problems: beamsplitter, detector Status of other fix and improvement projects Schedule

May 19, 2008SSWG #19 Göttingen2 Optics Reprise: Throughput/ Ghosts Three problems –Yellow ghost due to coating problem on dewar window –Grey loss in camera triplet –UV loss in contaminated lens fluid of four multiplets Instrument removed (Nov 2006), optics shipped to Pilot Group in Calif (Dec) Disassembled into multiplets, throughput measured by monochromator (Feb - Apr 2007):

May 19, 2008SSWG #19 Göttingen3 #1,2: fixed Field flattener (ghost). Bad coating polished off by Janos, new coating applied by Spectrum Thin Films (with new moisture repellant overcoat). Satisfactory. Camera triplet contact. Backed off pressure, contact and grey loss vanished, has not reappeared.

May 19, 2008SSWG #19 Göttingen4 #3: Repair (still) "in work" Found absorption in lens fluid (Cargille LL5610) due to polyurethane expansion bladders, and (lesser extent) viton O-Rings. After several false starts: –Disassemble multiplets, clean, replace expansion polyurethane bladders and viton O-rings –Use LL5610 fluid except for Collimator Field Lens and Triplet: LL3421 a better choice for common NIR beam (Aug - Sept) Four of five multiplets repaired. During reassembly of the last, two surfaces of first CaF 2 element in collimator triplet ("OL5") damaged by technician error! Original OL5: R.I.P.

May 19, 2008SSWG #19 Göttingen5 OL5 Replacement –almost done Recovery –use existing spare blank –Pilot to cover blank, figuring, coating costs –figuring by TORC: done (promised: 2 months; actual: 4 1/2 months) –solgel coating by Cleveland Crystals: almost done. (promised: 4 weeks; actual: 7 weeks). (Considered Lick Obs hardened solgel coating: too risky: they do not have experience with large CaF 2 pieces) –resume with triplet assembly at Pilot next week (where we were last Sept)

May 19, 2008SSWG #19 Göttingen6 Polarizing Beamsplitter Was shipped to Pilot with main optics to solve fluid leak problem With resolution of UV optics problem, realized beamsplitter would have same problem, verified severe UV loss (Nov) Flushed fluid, fixed leak, replaced bladder. Verified UV transmission recovered. (Nov) seal on front side lost. disassembled top layer, cleaned, realigned.

May 19, 2008SSWG #19 Göttingen7 Beamsplitter - 2 (Feb) Repotting attempt leaves voids. 4 of 9 top prism wedges removed, cleaned, realigned (Mar) Repotting attempt succeeds, except 3 corner top prism wedges cracked when removing mold. Recovery plan –Pilot Group covering costs –possible repair with index-matching glue (Lambrecht) –possible replacement using spare blank, or new blanks –3-6 months? does not affect main RSS reinstallation, “only” polarimetry commissioning

May 19, 2008SSWG #19 Göttingen8 Detector Problem with poor temperature stability being remedied with new bucking heater (Jan) Due to poorly mated connector, heater came on without control loop working: heater evaporated, leaving contamination film on CCDs and (temporary) dewar window Recovery: –redesigned heater control: Done –send CCD mosaic to E2V for cleaning: Done –build up a QE measuring system at SAAO: visible, points at 320 and 355nm, plus flat field: In work –will not hold up RSS reassembly

May 19, 2008SSWG #19 Göttingen9 RSS Fixes/ Improvements Slitmask mechanism –severe reliability problems due to difficulty of aligning magazine, carrier, and focal plane chute –redesigned, rebuilt, integrated with instrument; under test Grating stage flexure –out-of spec flexure perpendicular to dispersion –repaired current grating stage; purchased new, improved one; flexure being tested Etalon flexure –ring centers do not flex the same: dual etalon difficulty –improve etalon "seat". Done Fix guider interference (limits field): Parts manufactured; needs assembly and calibration

May 19, 2008SSWG #19 Göttingen10 RSS Fixes/ Improvements - 2 Electronics brackets redesign for easier maintainance. Done Improve baffling –moving baffle damage, maintainability. Material received –payload/ instrument interface. Done High level software. –PCON/ PDET Coding nearing completion. TCS I/F next –Should be ready to test during reassembly Detector fast readout modification (last SSWG). Done, Tested Instrument air humidity improvement –found air dewpoint +12 °C ! risked dewar window fogging. –maintained dryer, lines. Dewpoint at payload now

May 19, 2008SSWG #19 Göttingen11 Repair Schedule Schedule UW optics reintegration support team: Alan Shier (Pilot Group), Marsha Wolf (NIR project) Reintegration schedule –No earlier than: 28 July – 17 Sept –Return for lift when telescope is ready