STAR W.B. Christie, BNL STAR Collaboration meeting Michigan State University August 13, 2003. Summary of the FY03 Run, the Shutdown work, and plans for.

Slides:



Advertisements
Similar presentations
Bill Christie For the STAR Collaboration MARCH 24,
Advertisements

“L3” Jeff Landgraf. In July, Hank sent me a message asking if I had any talks for this meeting. “No, but I have some issues that could be discussed.”
STAR W.B. Christie, BNL RHIC/AGS Users Meeting June 4, STAR Goals and Performance, 2009 Run Outline Summary of STAR Goals for RHIC Run 9 Brief Summary.
 Trigger for Run 8 Rates, Yields, Backgrounds… Debasish Das Pibero Djawotho Manuel Calderon de la Barca Analysis Meeting BNL October 16, 2007.
Run 14 RHIC Machine/Experiments Meeting 27 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Peter Chochula, January 31, 2006  Motivation for this meeting: Get together experts from different fields See what do we know See what is missing See.
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
J. Seele - WWND 1 The STAR Longitudinal Spin Program Joe Seele (MIT) for the Collaboration WWND 2009.
CLAS12 CalCom Activity CLAS Collaboration Meeting, March 6 th 2014.
Run 13 RHIC Machine/Experiments Meeting 4 Jun 2013 Agenda: Status Reports Hydrogen Jet issue (Eyser)
H. MatisTracking Upgrade Review – Dec. 7, SSD Update Howard Matis.
IMPLEMENTATION OF SOFTWARE INPUT OUTPUT CONTROLLERS FOR THE STAR EXPERIMENT J. M. Burns, M. Cherney*, J. Fujita* Creighton University, Department of Physics,
Jeff LandgrafSTAR Trigger Workshop: Oct 21, 2002 Trigger Accounting for 2002.
News from the Beatenberg Trigger Workshop Ricardo Gonçalo - 18 February 2009 Higgs WG Meeting during ATLAS Week.
Some notes on ezTree and EMC data in MuDst Marco van Leeuwen, LBNL.
15 May 071 RHIC Machine/Detector Planning Meeting Agenda –Scheduling Physicist Issues (Gardner) –Experiment Issues PHENIX (Leitch) STAR (Christie) Monopole.
STAR Analysis Meeting, BNL, Dec 2004 Alexandre A. P. Suaide University of Sao Paulo Slide 1 BEMC software and calibration L3 display 200 GeV February.
November 18, 2008 John Haggerty 1 PHENIX In Run 9 John Haggerty Brookhaven National Laboratory.
STAR Ready to move on to 7.7 GeV Bill Christie For The STAR Collaboration April 13, Please N.B. All data plots shown in this presentation are online.
Run 14 RHIC Machine/Experiments Meeting 1 July 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Run 14 RHIC Machine/Experiments Meeting 3 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
STAR Collaboration Meeting, Nantes Alexandre A. P. Suaide Wayne State University Slide 1 EMC Commissioning for the run Review of last.
STAR Collaboration Meeting, BNL, Feb 2005 Alexandre A. P. Suaide University of Sao Paulo Slide 1 BEMC software update L3 display 200 GeV February.
STAR Agreement on Spin Configuration Plan Bill Christie RHIC Coordination Meeting January 24, 2006 Plan: A.) If the FPD++ installation, debugging, and.
May 12, 2009Włodek Guryn1 Physic Program with Tagged Forward Protons at STAR Single Diffraction Dissociation (inclusive SDD cross section, leading  0.
All Experimenters MeetingDmitri Denisov Week of July 16 to July 22 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 1.6pb -1 u Recorded:
General Status of STAR pp run as of June 1, pb -1 delivered ~1.78 pb -1 sampled 292 nb -1 delivered ~ 93 nb -1 sampled (93/180 ~ 52%) N.B
Hall-D/GlueX Software Status 12 GeV Software Review III February 11[?], 2015 Mark Ito.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
PHENIX Run8 Summary d+Au was fantastic! - x30 over Run3 baseline for future A+A new level of precision on intrinsic Cold Nuclear Matter physics now p+p.
October 3, 2008 John Haggerty 1 PHENIX Plan for Run 9 John Haggerty Brookhaven National Laboratory.
Time Meeting 3/10/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
LM Feb SSD status and Plans for Year 5 Lilian Martin - SUBATECH STAR Collaboration Meeting BNL - February 2005.
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
10/15/2007Dunlop, Welcome and Overview, Analysis Meeting Analysis Meeting 2007: Welcome and Overview James Dunlop Brookhaven National Laboratory.
1 RHIC Machine/Detector Planning Meeting 29 Jan 08 Agenda –Run 8 end game issues, if any Planning Meeting Web Site:
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
NTOF DAQ status D. Macina (EN-STI-EET) Acknowledgements: EN-STI-ECE section: A. Masi, A. Almeida Paiva, M. Donze, M. Fantuzzi, A. Giraud, F. Marazita,
27 Mar 071 RHIC Machine/Detector Planning Meeting Agenda –Scheduling Physicist Issues (Gardner) –Machine Issues - (Drees) –Experiment Issues PHENIX (Leitch)
2007 Run Update for STAR Jeff Landgraf For the STAR collaboration.
Pixel DQM Status R.Casagrande, P.Merkel, J.Zablocki (Purdue University) D.Duggan, D.Hidas, K.Rose (Rutgers University) L.Wehrli (ETH Zuerich) A.York (University.
Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Status on AGS cold snake  Cold mass is now in the cryostat. It is in the phase of wiring, and because.
STAR J/  Trigger in dA Manuel Calderon for the Heavy-Flavor Group Trigger Workshop at BNL October 21, 2002.
STAR pp Run Summary Carl Gagliardi March 11, 2008.
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
E-EMC developments and plan Jan Balewski IUCF, Indiana Detector status Run 3 goals Calibration Software status STAR Analysis Meeting BNL, October
H. MatisSTAR Inner Silicon Tracking Detector Review – July 8, SSD software and hardware maintainability Howard Matis.
1 NCC Task Force Richard Seto NCC Task Force Meeting Jan 8, 2007 BNL.
N. Poljak, FPD++ N. Poljak, U. of Zagreb.
Bill Christie For the STAR Collaboration January 5, Outline Detector configuration for Run 16 Data set Goals Desired luminosity profile for Run.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Run 14 RHIC Machine/Experiments Meeting 6 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Gluon polarization and jet production at STAR Pibero Djawotho for the STAR Collaboration Texas A&M 4 June 2013.
DAQ 1000 Tonko Ljubicic, Mike LeVine, Bob Scheetz, John Hammond, Danny Padrazo, Fred Bieser, Jeff Landgraf.
Inclusive  0 Production in Polarized pp Collisions Using the STAR Endcap and Barrel Electromagnetic Calorimeters Jason C. Webb for the STAR Collaboration.
PHENIX Plan for Run13 Kieran Boyle RSC 01/11/20131.
STAR Summary for 2012 pp running May 11, 2012 Bill Christie, BNL Outline Summary of 200 GeV pp run Summary of 510 GeV pp run STAR’s running efficiency.
PHENIX J/  Measurements at  s = 200A GeV Wei Xie UC. RiverSide For PHENIX Collaboration.
Operations meeting on FY07 Shutdown Date: June 27, W.B. Christie Outline Brief Overview of Shutdown Plan Details/discussion of next few weeks Comments.
Analysis Meeting, November 9-11, 2003 Manuel Calderón de la Barca Sánchez Heavy Flavor Working Group Heavy Flavor in ‘04: Prospects for J/ . Heavy.
2007 Physics Run Status STAR Collaboration mtg June 12, 2007, Berkeley California Bill Christie Outline Overview of BUR/Goals for Fy07 Run Collider Performance.
Run 14 RHIC Machine/Experiments Meeting 24 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
F. Bellini for the DQM core DQM meeting, 04th October 2012
LHC experiments Requirements and Concepts ALICE
CLAS12 Calibration and Commissioning (CALCOM)
Run16 Y. Akiba.
Katarzyna Kowalik (LBNL) For the STAR Collaboration
Presentation transcript:

STAR W.B. Christie, BNL STAR Collaboration meeting Michigan State University August 13, Summary of the FY03 Run, the Shutdown work, and plans for the FY04 Run Outline Summary of Data acquired in the FY03 Physics run Summary of the Shutdown work and schedule Summary of the STAR Operations FY03 Critique mtg Looking ahead to the FY04 Physics Run

STAR Summary of Data acquired in the FY03 Physics run (1) The preliminary total for accumulated “min-bias” events for the dAu run are: B = -.5T B = +.5 T T of TOF trg Total 38.2 Mevts of min-bias. This is 38.2/70 ~ 55 % of the “min-bias” goal. Small sample of the triggered TOF data set. D-Au Run. Min bias Data Summary

STAR Summary of Data acquired in the FY03 Physics Run (2) Summary of High Pt data goal for dAu run ~ 2.4 GeV ~ 4.4 GeV Calculation of Integrated Luminosity sampled by our High Pt trigger. 1.) Use rough cross section for d-Au: -  ~ 2.2 b 2.) Look at ratio of High Pt2 events to minbias events, scaling minbias events up by prescale: e.g. (1392/89,000*138) ~ 1.1 x ) Normalize to d-Au cross section: (1.1 x )(2.2 b) ~ 0.24 mb 4.) Yield = L*  t*  = kevts  L*  t = k/0.24 mb = 2.55 x Note: 1/nb = 1 x  We “collected” 2.55 nb -1 ~ 2.55/25 ~ 10.2 %.  Accounting for STAR deadtime (~50%) C-AD delivered ~ 5.1 nb -1 (20.4 %) of 25 nb -1 to us.

STAR Summary of Data acquired in the FY03 Physics Run (3) Polarized Proton Run End of Vertical Polarization run. ~391 nb -1 Total for “Good” for Longitudinal Polarization ~ 373 nb -1 Summary for pp Run: Vertical Polarization- 461 nb -1 delivered, 391 nb -1 “Good”, Goal of 1000 nb -1 Longitudinal Polarization- 444 nb -1 delivered, 373 nb -1 “Good”, Goal of 3000 nb -1 “Good” Integrated Luminosity (nb -1 ) “Good”  Polarization of both beams > 20%, and reasonable background rates (usual caveat about A N CNI ).

STAR JuneJulyAugSeptOct Beam off May 30th. Start Roll out Pull FTPCs 6/16 - 7/19 Pull SVT cone for SSD Instal. & place on Clean room roof 6/19 - 7/1 Install 30 EMC mods from East 6/23 - 8/29 Roll Det. To WAH 10/7 - 10/15 Install both FTPCs 10/1 - 10/6 Detector testing 10/ /12 Nov Install. and testing of EEMC and PMD. 5/ /15 EEMC upper half to Poletip on 7/11 (done on 8/1) STAR in AB Complete 6/16 Install SSD 7/7 - 9/14 Install cone 9/15 BEAM in Cave 11/15 Shield Wall up 10/27-10/30 Beampipe Bakeout 10/ /20 SGIS cert. 10/ /21 Cone rigged to platform 9/3 Install Poletips and BBC 11/ /15 AC power & MCSW on plat. W 10/15 PT test fit & EEMC wrk 10/29-11/3 OR 11/5-11/10 Survey TPC & SVT 9/16 - 9/9/25 Summary Schedule for FY03 Shutdown Revised (6/24/03) Today’s date 8/13 ~24 EMC mods installed

STAR General RHIC Operations in FY03 Run Positive changes from previous year’s runs: - Scheduled Accesses: These made commissioning, debugging, installation, and maintaining STAR systems much more efficient. Though some C-AD management is hesitant to admit it, it also appeared to increase the reliability of the Collider operations. - Weekly Scheduling meetings: This was also a success. For the most part these weekly schedules, discussed and agreed to on Monday afternoon, were held for the week. This was much more efficient, and aided STAR internal scheduling and planning. It also removed scheduling discussions/battles from the Wednesday RHIC Coordination/Progress meetings, making them more useful as well. - More realistic Collider performance estimates prior to the run: While the estimates still proved to be overly optimistic, STAR and PHENIX expectations were much more closely matched.

STAR Agenda for the FY03 STAR Ops “Critique” meeting 9:00 - 9:15 Welcome and Statement of the Purpose of the Meeting (T. Hallman and/or B. Christie) Critique of Detector Operations (W. Christie, Chair) 9:15 - 9:40 Discussion of Run Control Ops (J. Landgraf) 1) critique by sub-system manager 2) action plan/possible changes 3) discussion by all 9: :00 Discussion of DAQ Ops (T. Ljubicic) 1) critique by sub-system manager 2) action plan/possible changes 3) discussion by all 10: :20 Discussion of Trig Ops (H. Crawford) 1) critique by sub-system manager 2) action plan/possible changes 3) discussion by all 10: :35 Break 10: :50 Discussion of Level III Ops (T. Kellogger) 1) critique by sub-system manager 2) action plan/possible changes 3) discussion by all 10: :05 Disc. of Slow Contr. Ops (Mailed in comments by M.C) 11: :20 Discussion of On-line QA (S. Panitkin) 1) critique by sub-system manager 2) action plan/possible changes 3) discussion by all 11: :00 General Discussion of Run Control, DAQ, Trig, Online, level III, slow controls (critique of experience; problems, successes, needed improvements) T. Ljubicic, moderator 12:00 - 1:00 Lunch 1:00 - 1:15 Discussion of TPC Ops (A. Lebedev) 1) -> 3.) (I.e. same as morning presentations) 1:15 - 1:20 Discussion of Magnet Ops (R. Longacre or designee) 1:20 - 1:35 Discussion of EEMC Ops (J. Sowinski) 1:35 - 1:50 Discussion of SVT Ops (D. Lynn) 1:50 - 2:05 Discussion of FTPC Ops (A. Lebedev) 2:05 - 2:20 Discussion of TOFp/TOFr/VPD Ops (B. Llope) 2:20 - 2:35 Discussion of FPD/BBC Ops (L. Bland) 2:35 - 2:50 Discussion of EMC Ops (TBD) 2:50 - 2:55 Discussion of PMD Ops (S. Chattopdhyay) 2:55 - 3:05 Break 3:05 - 3:20 Discussion of Fast Offline QA (G.V. Buren) 3: :25 Interlocks & ES&H perspectives (W. Christie) 3:25 - 3:45 Training for Operation of Detector (T. Hallman) Involvement of STAR Collaborators in running & certification process i) critique of experience from Fy03 Physics run ii) action plan/possible changes iii.) Discussion by all 3:45 - 4:05 General RHIC Ops (as relevant to STAR Ops) (B. Christie) i) critique of experience during run and report from RHIC Retreat ii) action plan/possible changes iii.) Discussion by all 4:05 - 5:30 Round Table Discussion * Capturing of Action Items/Action plan for systems/topics * Discussion of suggestions sent in by collaborators not able to attend mtg * Operating the STAR Detector: staffing of shifts, period coordinator experience, Detector Operator exp., Shift leader exp., Shift crew exp., ease of detector operation, shift plan communications, etc: problems, plus's, needed improvements (B. Christie moderator) 5:30 Adjourn

STAR Few Points from the FY03 Critique meeting Run Control and DAQ: Will clean up GUI a bit Pick up “base” trigger rates for pre scales Work on configuration algorithms Reconfigure to “join” sub systems based on deadtime, to allow more simulataneous triggers. Web based (with larger font) monitoring screens with historical graphs (e.g. deadtimes) Easy display to monitor data transfer to RCF Plan to run with DAQ100, need QA buy in from Collaboration Propose/plan not to ship all events to L3 Trigger: New TCU functionality (Halt and pre/fol protection) New scaler readout and Network software to increase speed Rewrites of L1 & L2 to clean up and increase speed Come up with a proposal to reduce “Tier 1 file proliferation” L3: Fix minor hardware problems Run in “express stream mode” during Run 4 Online (aka “Panitkin”) QA Plots: Make saving of histograms automatic Change so that it isn’t necessary to wait for histogram writing before starting next run Reorganize plots (small set for shift QA, larger sets for detector experts Easy way to generate, and compare with, reference plots

STAR Few Points from the FY03 Critique meeting (2) Subsystems: EEMC expects to transition to shift operation sometime during Run 4 SVT would like top see implementation of “Access checklist” TOFp tray may be relocated BBC brings up possible need to deal with ADC saturation during Heavy Ion running Two ideas - split signals to ADCs and attenuate one, or lower gains FPD plans to complete West side installation BEMC will replace EPROMS to solve main pedestal problem with Jet trigger BEMC still working on diagnosis and cure for problem of failing crate power supplies PMD needs good Heavy Ion pre-trigger, will be fully installed and instrumented for Run 4 Shift Crews and Shift Sign-up Overlap days need to be taken seriously Efficiency of shift crew to get detector up and taking must be worked on and quantified Training shifts should be scheduled later in the run (when probability of beam is higher) Suggestion to change composition of Shift crews (1 SL, 2 DO, 1 C, +Ts) Tune shift sign-up to ensure at least one DO has recent experience Complete minutes available via the STAR Operations Web page.

STAR Looking Ahead to the FY04 Run C-AD Plans for next year’s run: - “Physics Development mode”: What C-AD is proposing is that after the five week “Set-up” and “Ramp-up” phase for a given beam configuration that Luminosity development continue during the “Physics Running” 8:00 am to 4:00 pm Monday through Friday. Concerns : Current Schedule calls for the “Physics Running” to start about December 22nd. Concern is that to effectively use the holiday period (I.e. time until about January 2nd) that we must have STAR commissioned, and at least a final min-bias trigger set-up before this time. QM04 in mid January will pull a number of people out of town. We’ll need a careful plan for commissioning of the higher level and “rare” triggers to effectively make use of beam time in January. With “Physics Development mode” (PDM) running, for STAR to get its 45 hours per week of “spinning tapes”, the uptime for the collider and STAR will have to be much larger than we seen in the past. 45 hrs/wk /(168 hrs/wk - 12 (beam Exp.) - 8 (access) - 40 (PDM) =108 hrs/wk ) ~42% !

STAR Looking Ahead to the FY04 Run More complex mix of triggers to optimize use of bandwidth and livetime. Monitor time history of trigger mix for stability ppMinBias ppBHT1-slow ppBHT1-fast ppFPDw-fast ppBJP1-slowppBJP2-slow ppFPDe-slow Time 

STAR Summary We fairly well followed the FY03 BUR plan for the last run, and accomplished most of the goals that had been set. We’ve evolved the operating capabilities of the STAR system (triggers, rates, running modes, new sub systems, etc.) dramatically every year, and are planning to continue this evolution (rates, DAQ100, parallel Event builders, L2 triggers and aborts, etc.) in the FY04 run. We are going to have to perform efficiently and effectively to achieve the accumulation of the large data sets (~ 100 Mevts etc.) that people are starting to contemplate and request. Improve Shift Crew efficiency Reduce fraction of accumulated events which are labeled as “bad” and tossed. Improve detector performance (e.g. deadtime) monitoring, diagnosis, and recovery. Continually work on overall robustness of detector operation Schedule for the FY04 run presents some schedule issues that we’ll have to plan for. It’s time to reflect on our past successes, look forward to our future challenges, and enjoy the reception on the roof of BPS.