Presentation to the Portfolio Committee on Public Enterprises RICHTERSVELD LAND CLAIM SETTLEMENT: ALEXKOR – RMC PSJV & ALEXANDER BAY TOWNSHIP ESTABLISHMENT.

Slides:



Advertisements
Similar presentations
Project Cycle Management
Advertisements

Reliability Center Data Request Task Force Report WECC Board Meeting April 2009.
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO GFCS Governance proposal Process of development.
PRESENTATION TO THE JOINT RULES COMMITTEE 15 MARCH 2012 ON THE PROGRESS ON IMPLEMENTATION OF THE INDEPENDENT ASSESSMENT PANEL ADOPTED RECOMMENDATIONS ADOPTED.
Railway Grade Separations Issues. Railway Grade Separations 1.Introduction Qualifications/experience to undertake bridge planning for railway grade separations:
PHILLIP FRENCH DIRECTOR AUSTRALIAN CENTRE FOR DISABILITY LAW 2012 Asserting human rights under the Optional Protocol.
Review Municipal Infrastructure Grant Policy Framework Review
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
OVERVIEW OF CHAPTER 40B FUNDAMENTALS The Next Chapter of 40B: A Training on the Latest Developments in the Affordable Housing Law Fall 2011 Presented by.
Presentation to the Select Committee RICHTERSVELD LAND CLAIM SETTLEMENT: PSJV, ALEXANDER BAY TOWNSHIP ESTABLISHMENT & ALEXKOR RESTRUCTURING.
Implementation of the Government Immovable Asset Management Act, 2007 (GIAMA) National Department of Public Works Presentation to the Select Committee.
1 Municipal Ports Training Seminar: Board Governance Issues Prepared for DfT by Fisher Associates June 2007.
Engaging with Planning Agents Reform of the Planning System 30 April 2015.
Regulatory Body MODIFIED Day 8 – Lecture 3.
Challenges to purchase/release of Land & Buildings for Sustainable Human Settlements Presentation to the Portfolio Committee on Public Services 10 September.
DEPARTMENT: RURAL DEVELOPMENT & LAND REFORM DEPARTMENT OF RURAL DEVELOPMENT AND LAND REFORM GEOMATICS PROFESSION BILL 2013 A Briefing to the Parliamentary.
Presentation to the Joint Budget Committee on 2003 MEDIUM TERM BUDGET POLICY STATEMENT 14 November 2003 SARAH CHOANE – CHIEF FINANCIAL OFFICER Department.
Presentation to the Select Committee on Labour and Public Enterprise August 2011.
HUMAN SETTLEMENTS PORTFOLIO COMMITTEE MORTGAGE DEFAULT INSURANCE COMPANY (MDIC) UPDATE MARCH 2013.
Egyptian Environmental Affairs Agency National Capacity Self Assessment (GEF/UNDP) The Third GEF Assembly Side Event – 30 th August,2006 Cape town Integrating.
ADD NAME/TITLE HERE Report on the outcome of Harry Gwala Informal Settlements Constitutional case 02 June 2010.
PRESENTATION TO PORTFOLIO COMMITTEE ON THE APPOINTMENT OF CONSULTANTS DEPARTMENT OF HUMAN SETTLEMENTS ACTING DIRECTOR GENERAL – M TSHANGANA 1CONFIDENTIAL.
1 Legal Aspects of Implementing the Crown Land Policy Presentation to the Ministry of Natural Resources, Government of the Turks and Caicos Islands By.
Members of Finland Parliamentary Delegation Policy Approaches into Housing in South Africa Presentation by the Department of Human Settlements.
Presentation to the Portfolio Committee on Public Enterprises The Alexkor Performance Management Process Presented By Arthur Sika & Yonella Nonyusa 19.
1Confidential and Not for Publication PROGRESS ON DELIVERY AGREEMENT FOR OUTCOME 8: SUSTAINABLE HUMAN SETTLEMENTS AND IMPROVED QUALITY OF HOUSEHOLD LIFE.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
Alexkor Limited Select Committee 8 March INDEX Location Corporate Structure Financial Review Challenges Mining Litigation Way Forward.
Supreme Audit Office (the NIK): Basic Facts Riga, 4 April 2012.
MUNICIPAL SYSTEMS BILL September LEGISLATION n Municipal Demarcation Act, 1998 n Municipal Structures Act, 1998 n Municipal Systems Bill (1999)
CIVILIAN SECRETARIAT FOR POLICE STATUS REPORT ON IMPLEMENTATION OF THE CIVILIAN SECRETARIAT FOR POLICE SERVICE ACT 2 OF 2011 PORTFOLIO COMMITTEE ON POLICE.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Regulatory Authority.
PORTFOLIO COMMITTEE ON PUBLIC WORKS PARLIAMENTARY VILLAGES 16 OCTOBER 2007.
Portfolio Committee on Appropriations Quarter 1 Expenditure and Performance 24 August 2012 The Presidency Department of Performance Monitoring and Evaluation.
Report to the Portfolio Committee on Human Settlements on the closure of Servcon Housing Solutions (Servcon) 26 February 2014.
Presentation to the Portfolio Committee on the Social Security Agency February 2005.
Northern Cape Province Provincial Land Use Legislative Reform RESEARCH FINDINGS 26 July 2011 Bloemfontein.
SEA in the Czech Republic Prague, 24 September 2008.
PUBLIC–PRIVATE PARTNERSHIP (PPP) FRAMEWORK AND GUIDELINES Syed M. Ali Zaidi, P.Eng. PM(Stanford), Ph.D. Director, Strategic Partnerships Alberta Infrastructure.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Environmental Protection and Permitting Nurhan IZAIRI Minister of Environment and Physical Planning Republic of Macedonia CONSTRUCTION PERMITS FOR A COMPETITIVE.
1 PRESENTATION TO THE PORTFOLIO COMMITTEE ON THE OVERVIEW OF THE NDPW PRESENTED BY THE TOP MANAGEMENT COMMITTEE 26 MAY 2004.
Expropriation Bill 2015 portfolio committee Public Works public hearing 30 July Context: Infrastructure Development Act; SPLUMA; Restitution 2Unregistered.
Progress Report: Bulk Infrastructure Task Team Premier’s Co-ordinating Forum November 2009.
Belgrade, Donor Coordination Meeting Belgrade, 4 th of June 2012.
Ingonyama Trust Board A Schedule 3 A Public Entity In terms of the Public Finance Management Act (Act 1 of 1999) STRATEGIC PLAN AND BUDGET 2008/2009 Presentation.
Legacy Report of Select Committee on Finance By: Zolani Rento Date: 09 July 2014.
SPATIAL PLANNING & LAND USE MANAGEMENT BILL Human Settlements Portfolio Committee 11 October 2012.
1 Meeting of Portfolio Committee for Minerals and Energy 25 March 2008, Cape Town Mineral and Petroleum Resources Development Amendment Bill.
Presentation to the Portfolio Committee Establishment of an Agency for Social Security 26 February 2003 Department of Social Development.
The National Housing Programme for Farm Residents Presentation to the Portfolio Committee August 2009.
Establishment of the New Universities in Kimberley, Northern Cape and Nelspruit, Mpumalanga Presentation to the Parliamentary Committee On Higher Education.
QUARTERLY PERFORMANCE OF THE MUNICIPAL INFRASTRUCTURE GRANT (MIG) – 2005/06 AND 2006/07 FINANCIAL YEARS Presentation to the Select Committee On Finance.
RESTITUTION OF LAND RIGHTS AMENDMENT BILL, 2013 PRESENTATION TO THE PORTFOLIO COMMITTEE ON RURAL DEVELOPMENT AND LAND REFORM 9 OCTOBER
Presentation to the Portfolio Committee on Rural Development and Land Reform Strategic Planning Workshop 2-3 February /03/171.
Lecturer: Lina Vladimirovna Zhornyak, associated professor.
Public Consultation Session: Consultation and Transparency Requirements for Offshore Petroleum Activities Francesca Astolfi A/g General Manager, Offshore.
Update: South Africa’s Preparatory Process for HABITAT III Presentation to Portfolio Committee on Human Settlements 15 March
European Life Sciences Infrastructure for Biological Information ELIXIR Collaboration Agreement Template ELIXIR/2014/10 Vera Herkommer.
Minerals and Petroleum Resources Development Bill
THE IMPLEMENTATION PLAN
Presentation to the Portfolio Committee on the Social Security Agency
Jacek Gdański Accounting Department
Mr Ntandazo Vimba and Henri Marais
DISTRICT SIX DEVELOPMENT PROJECT PRESENTATION TO THE STANDING COMMITTEE ON HUMAN SETTLEMENTS: WC PROVINCIAL PARLIAMENT: 19 JUNE 2018.
INGONYAMA TRUST BOARD’S ANNUAL PERFORMANCE PLAN
“ESTABLISHING THE FOOTPRINT” HDA ANNUAL REPORT
Director-General: Mr. E Africa
NATIONAL COUNCIL OF PROVINCES
Roles and Responsibilities
Presentation transcript:

Presentation to the Portfolio Committee on Public Enterprises RICHTERSVELD LAND CLAIM SETTLEMENT: ALEXKOR – RMC PSJV & ALEXANDER BAY TOWNSHIP ESTABLISHMENT

Strictly confidential2 CONTENTS  Overview of Richtersveld Land Claim Settlement & Respective Obligations  Pooling & Sharing Joint Venture between Alexkor & Richtersveld Mining Company  Alexander Bay Township Establishment

Strictly confidential3 Richtersveld Land Claim  1998: Richtersveld Community (RVC) filed a land claim under the terms of the Restitution of Land Rights Act for a parcel of land situated in Alexander Bay  2001: Land Claims Court (LCC) initially rejected the RVC’s land claim on 22 March 2001  2003: RVC appealed to the Supreme Court of Appeals which ruled in its favour on 24 March 2003  2003: Alexkor and Government appealed the decision to Constitutional Court  2003: Constitutional Court awarded RVC both land & mineral rights on 14 October 2003  Constitutional Court referred matter back to LCC to determine nature of restitution

Strictly confidential4 Richtersveld Land Claim……. The form of restitution claimed by the RVC was as follows:  Restoration of the land owned by Alexkor;  The mineral rights in respect of the claimed land or, alternatively, the rights to prospect and mine under the Minerals and Petroleum Resources Development Act belonging to Alexkor;  R1.5 billion as compensation for the diamonds extracted since 1928;  Repair of the environmental disturbance caused by the extraction of diamonds from the claimed land by the State and Alexkor or, alternatively, R1.2 billion as compensation for the environmental disturbance;  R10 million as solatium for the dispossession of the land and mineral rights.

Strictly confidential5 Richtersveld Land Claim Settlement  Department of Public Enterprises entered into negotiations with the RVC  5 October 2006: Memorandum of Understanding on outlining the principles and undertakings of an out-of-court settlement  22 April 2007: Final and binding Deed of Settlement in the matter was signed  9 October 2007: Deed of Settlement made an Order of Court

Strictly confidential6 Richtersveld Land Claim Settlement… The Settlement reached entails the following: Restoration of the land claimed. Portions of land will be transferred to the RVC by Alexkor and the State [Alexkor, the State & Northern Cape Government ordered to give effect to]; Transfer of Alexkor’s land mining rights to the RVC [Alexkor ordered to give effect to]. In the interim, a Pooling & Sharing Joint Venture (PSJV) will be formed between Alexkor and the RVC. The State will capitalise Alexkor for it to contribute R200 million to this PSJV in order to constitute a viable mining venture; Transfer of Alexkor’s agricultural and mariculture assets to the RVC in order to empower the RVC and to create a basis for future development and wealth creation [Alexkor ordered to give effect to]; R190 million as extraordinary reparation to be paid to the RVC’s Investment Holding Company in three equal instalments over three years [The State (DLA) ordered to give effect to];

Strictly confidential7 Richtersveld Land Claim Settlement… R50 million lump sum development grant to the RVC’s Investment Holding Company to be used for the recapitalisation of the agricultural and maricultural enterprises [State (DLA) ordered to give effect to]; R45 million to the RVC’s Property Holding Company as compensation to secure Alexkor’s right of occupation of the transferred residential properties for a period of ten years [Alexkor ordered to give effect to on transfer of erven to RVC]; Establishment of a formal township in terms of the Northern Cape Planning and Development Act, 1998 at Alexander Bay [The State & Alexkor ordered to give effect to]; Environmental rehabilitation and revision of the mine’s Environmental Management Programme [Alexkor ordered to give effect to financial obligation with the State providing a guarantee for the financial obligation]; and Costs in connection with the implementation of the Settlement.

Strictly confidential8 Pooling & Sharing Joint Venture ALEXKOR Land mining rights transferred to RMC Alexkor retains sea mining rights & mining assets PSJV Alexkor 51% RMC 49%

Strictly confidential9 Pooling & Sharing Joint Venture…  Alexkor will remain the holder of its marine mining rights  Richtersveld Mining Company will remain the holder of its land mining rights  Alexkor & RMC will respectively put their marine & land mining rights under full control of Joint Board of PSJV  Alexkor will put its land & marines mining assets under control of Joint Board  Alexkor will have 51% interest (with 3 members on Joint Board) in PSJV & RMC a 49% interest (also with 3 members on Joint Board)  Joint Board will appoint Executive Committee  EXCO shall oversee the conduct of day-to-day operations  EXCO will put in place a development plan for viable mining venture

Strictly confidential10 Pooling & Sharing Joint Venture……  Unanimous Resolution provides for a preliminary establishment phase of the PSJV  During this period, the PSJV Joint Board shall be a committee of the Board of Alexkor with Alexkor effecting the necessary delegations of powers & functions to the extent necessary for Joint Board to carry out its activities during the various stages of the preliminary establishment of the PSJV independently  EXCO will: Identify Alexkor land and marine assets to be pooled Identify personnel for the mining activities Draft a prospecting plan and work programme Draft an interim mining plan

Strictly confidential11 Alexander Bay Township Establishment  The DPE undertook to establish a formal township in respect of the existing Alexander Bay village  The Deed of Settlement and the Court Order relating to the settlement of the land claim obligates Alexkor & the State to give effect to this.  To enable such township establishment, the municipal engineering services have to be upgraded to municipal standards.  Richtersveld Municipality will take over such services and fulfil all functions which a local authority has to fulfil in respect of the provision of engineering services and other public services in the formally established township of Alexander Bay.

Strictly confidential12 Work undertaken…. In preparation for the township application, an engineering services assessment was conducted & this identified the infrastructure that would require upgrading. A draft layout of the township was also designed. Phase 1  Preliminary Investigation of Services  Cost of Upgrading Services  Pre-application Work with Respect to Application for Township Establishment  Draft Township Plan

Strictly confidential13 Work undertaken…. Phase 2  Finalisation of Township Plan: negotiation with Richtersveld Community & coordination between town planners & engineers  Negotiation of Services Agreement with Richtersveld Local Municipality  Design of Civil & Electrical Services  Approval of Design  Survey & Pegging of the Plan  Environmental Impact Assessment  Submission of Township Application through Statutory Procedures  Environmental impact assessments

Strictly confidential14 MOU between DPE & DBSA  MOU signed between DPE & DBSA for the DBSA to take over the implementation of the project under its Sustainable Communities programme  MOU sets out framework for DBSA to act as implementing agent for development of Alexander Bay Township  MOU provides that development needs of Alexander Bay will be addressed with due consideration to spatial issues such as Alexander Bay being a regional node in the Richtersveld & sustainable infrastructure technologies around energy, sanitation & water provision that are appropriate to its location, climate, needs & economy.  MOU provides for Steering Committee constituted by representatives of DPE, DBSA, Alexkor, Richtersveld Community, Richtersveld Municipality, Namakwa Municipality & NC Dept of Local Government & Housing & other stakeholders.

Strictly confidential15 Functions of Steering Committee  Determining the scope of work through:  Review the Spatial Development Framework and Town Plan for Alexander Bay to align more closely with the current Integrated Development Plan, the Provincial Spatial Development Framework & the National Spatial Development Perspective.  Review the work already undertaken and align existing project plans to the DBSA approach to sustainable township development.  Determining required resources;  Development of a roll-out and implementation plan for adoption by the respective parties;  Management and facilitation, cooperation and consultation in respect of the development of Alexander Bay;  Monitoring and evaluation of performance and project progress.

Strictly confidential16 Way forward  A township application, with a general plan based on existing civil engineering, mechanical and electrical designs has been submitted.  Existing designs expected to cost R80 million to construct, over 18 month period  Steering Committee would like to determine whether it is possible to revise these designs at this stage, whether proposed sustainable approach principles can be incorporated into the work already undertaken and the cost of such revisions

Strictly confidential17 Way forward…..  Alexkor to prepare a comprehensive report on all work that has been undertaken to date including infrastructure designs and costs, surveys and status of the township application.  Namakwa District Municipality to provide statutory requirements for township establishment.  DBSA to provide suggestions of infrastructure options for sanitation, energy and water provision after the decision of the Project Steering Committee of the favourable option and appointment of the project Manager with relevant competencies relevant to the desired option.  Above reports will be used to determine whether it is possible to revise the existing designs at this stage, whether proposed sustainable approach principles can be incorporated into the work already undertaken and the cost of such revisions.

Strictly confidential18 Thank You