RSSO REPORT TE-MSC Andrea Musso – Virginia Prieto Hermosilla (RSSO’s) Acknowledgments - We wish to thanks: Michele Modena (Safety Link Person TE-MSC) for.

Slides:



Advertisements
Similar presentations
Agency Drafts Statement of Scope Governor Approves (2) No Agency Drafts: Special Report for rules impacting housing Fiscal Estimate.
Advertisements

Chapter 2 Analyzing the Business Case.
IAEA International Atomic Energy Agency. IAEA Outline Learning objectives Introduction Functions of Regulatory Body (RB) on EPR Appraisal guidance: Part.
Systems Analysis and Design 9th Edition
Chapter 2.
Info Day on New Calls and Partner Café Brussels, 8 September 2010 How to apply – Budget and Reporting.
Analyzing the Business Case
Course Technology Chapter 3: Project Integration Management.
The Top Ten Things You Should Know About The IEP Process
COMP 208/214/215/216 Lecture 2 Teams and Meetings.
1 Chapter 4: Project Integration Management. 2 Learning Objectives Describe an overall framework for project integration management as it relates to the.
Agency Drafts Statement of Scope Governor Approves Statement of Scope (2) No Agency Drafts: Special Report for rules impacting housing
Radiation Protection LS1 - Collaboration with CERN Technical Groups - Lessons learnt Stephane Bally (CERN), Sandro Di Vincenzo (CERN) Indico
1.  Describe an overall framework for project integration management ◦ RelatIion to the other project management knowledge areas and the project life.
Radiation testing in facilities outside CERN EDMS document version 2.0 Heinz Vincke - RadWG meeting 6/7/2010.
Communication campaign Most common issues identified: analysis per cost category Antonio Requena Fernández FCH JU Financial Officer.
National Commission for Academic Accreditation & Assessment Developmental Reviews at King Saud University and King Faisal University.
Report on the meetings in 2013 PH TSO Annual meeting 2 PH TSO Annual meeting - N. Dupont.
Module 5: Data Collection. This training session contains information regarding: Audit Cycle Begins Audit Cycle Begins Questionnaire Administration Questionnaire.
GOVERNOR’S EARLY CHILDHOOD ADVISORY COUNCIL (ECAC) September 9, 2014.
Systems Analysis and Design 8 th Edition Chapter 2 Analyzing the Business Case.
FAO/WHO CODEX TRAINING PACKAGE SECTION TWO UNDERSTANDING THE ORGANIZATION OF CODEX Module 2.5 How do Codex Committees function?
Safety during LS1 EN-STI Group meeting 1st February 2013 AP.Bernardes EN/STI.
Access zones and Training Steve Hutchins BE-ASR IEFC workshop 7/3/2012.
AEER QUEECA PB and MB meetings, 15/16 Jan 2015, Porto, PT Association for Engineering Education of Russia The Trial Accreditations in CA countries with.
RSSO refresher meeting J. Pedersen M. Tavlet, T. Otto.
Projects spanning over two programming periods Department for Programme and Project Preparation Beatrix Horváth, Deputy Head of Department Budapest, 5.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 1 Diploma of Project Management.
1.  Interpretation refers to the task of drawing inferences from the collected facts after an analytical and/or experimental study.  The task of interpretation.
Radiation Protection info update C. Adorisio (DGS/RP) 17 th LTEX Meeting
ADO-PO Section Meeting Safety Group LS1 Shutdown Safety Organization.
1 Presentation prepared by: Fernando B. S. Pedrosa Eloy R. Fuentes Gerald Dumont Alexandre Dorsival IMPACT EN RSSOs meeting 14/Oct/2014 EDMS id:
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
The Top Ten Things You Should Know About The IEP Process POAC-NoVA-2008.
Last but not least : LS2 General Safety 1 Thomas Otto, LS2 Safety Coordinator for LHC Ana-Paula Bernardes, LS2 Safety Coordinator for Injectors.
New SPS scraping system: preliminary RP remarks Helmut Vincke DGS-RP.
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
ADO-PO Section Meeting Safety Activities Sigi Wenig (LEXGLIMOS) 8 September 2015.
RSSOs at CERN Prepared by Ans Pardons for the CERN RSSO training day With input from J. Pedersen.
Safety in LS1 Thomas Otto, TE DSO.
1 Systems Analysis & Design 7 th Edition Chapter 2.
COMPUTING TOOLS USED BY HSE HSE-SEE-CO
ALARA REVIEW WORKING GROUP (ARWG) New ALARA recommendations proposed by the ALARA REVIEW WORKING GROUP (ARWG) Heinz Vincke on behalf of ARWG LS1 committee.
R ADIATION P ROTECTION ASPECTS LSS1 LHC f RE - INSTALLATION Cristina Adorisio (CERN - DGS/RP) LTEX Meeting – May 10 th, 2012.
TE-MPE, MPE Workshop 2010, G.D’Angelo, 14-Dec TE-MPE on-call service for the LHC Giorgio D’Angelo on behalf of TE-MPE On call team, with inputs.
Radiation Protection computing tools Gérald Dumont HSE/RP.
ALARA IMPLEMENTATION AT UKRAINIAN NPPs T. Lisova, Nuclear Energy Department, Ministry of Fuel and Energy of Ukraine Y. Roshchyn, National Nuclear Energy.
Use of PLAN in EN Department 1 st of April 2016 Michele Battistin.
Application of « ALARA » at Tihange NPP ISOE EUROPEAN SYMPOSIUM 26 June 2008 Ir. Philippe Petit – Deputy head of SRP department 2 2.
Systems Analysis & Design 7 th Edition Chapter 2.
How to access CNGS Heinz Vincke for DG-SCR-SL RADWG3/4/
Logo area MQXF Review: Safety Thomas Otto HL-LHC Project Safety Officer With contributions by -Paolo Ferrcin and Ezio Todesco, TE-MSC -Francesca Viggiano,
Enhancement of Radiological Safety Culture within Ignalina NPP and Contractors Viktor PLETNIOV Ignalina Nuclear Power Plant Lithuania Gintautas KLEVINSKAS.
Lucie linssen, April 9th 2008, SLHC-PP kick-off meeting 1 Use of SLHC-PP resources, reporting, practical info
Warm Magnets - LS1 Feedback J. Bauche, on behalf of the TE-MSC-MNC Team.
Planning meetingCertification audit, stage 1 Pre-audit (optional) Document review Prior to every certification audit a planning meeting is conducted where.
Welcome and News from EN and RSO Committee Ans Pardons 3 rd EN-RSSO Networking meeting, 22/6/2015.
Electrial Safety LS2 days November 2016 AP
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
LHC intervention scheduling with the Work Acceptance Tool
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
Safety in Construction and Upgrade Phases
Unifying for all accelerators and projects
Quality Assurance applied to Accelerator Safety
Survey on “Chargés de Consignation” Follow-up
Assessing Academic Programs at IPFW
C. Adorisio Extracted from the presentation given at
EN Safety Talks Motivation and Concept
Project DIRECT Final Summary
IMPACT YETS 2017–2018 & LS2 preparation
Presentation transcript:

RSSO REPORT TE-MSC Andrea Musso – Virginia Prieto Hermosilla (RSSO’s) Acknowledgments - We wish to thanks: Michele Modena (Safety Link Person TE-MSC) for his help and valuable remarks and suggestions Our colleagues from MSC, RP and TE for their precious information which allowed us to compile this report. Davide Tommasini (TE-MSC-MNC) for his interesting input. MSC-Technical meeting

April 2014TE-MSC RSSO's & Safety Link Person Summary Scope of the report CERN rules Persons interviewed Findings Common points: What can be improved (RP) What can be improved (MSC) Conclusions 2

April 2014TE-MSC RSSO's & Safety Link Person Scope of the report TE-MSC RSSO’s and Safety Link Person were requested to perform a survey between people involved in: Activities in radioactive environment Activities on activated equipment's IMPACT and Working Dose Plans (WDP) creation Disclaimer: Following the several interviews, we summarize the points that were suggested as being the most important; this report cannot be exhaustive for all the issues pointed out during the interviews by individuals. 3

April 2014TE-MSC RSSO's & Safety Link Person ALARA Overview and References Activities falling in ALARA Level III must be approved by the CERN ALARA Committee SOME REFERENCES ALARA Review Working Group (ARWG (2013) (edms v.2)edms v.2 TE Department ALARA Procedure (edms )edms LS1 IMPACT Specific meetings with TE Tech.Resp.(edms )edms LS1 RP Recommendations (edms )edms Individual dose equi. Level I 100 μSv Level II 1 mSv Level III Collective dose equi.500 μSv5 mSv GROUP I: Dose Criteria SOME VOCABULARY WDP: Working Dose Planning DIMR/RWP: Dossier d'Intervention en Milieu Radioactif/Radiological Work Permit. IMPACT: Tool to implement the interventions in Radioactive Environment. Still under development. It includes the activities and associated documents

2013: IMPACT DATA IMPACT safety working group activities approved by RP 1013 activities with analysis of radiological hazards and dosimetry estimations 208 registered DIMR 68 DIMR launched in approval 207 activities with dosimetric reassessment 7 DIMR III unapproved via IMPACT but approved by the ALARA Committee TE-MSC RSSO's & Safety Link Person

: TE&MSC IMPACT DATA 6TE-MSC RSSO's & Safety Link Person DIMR 2/3 ALARA 2ALARA 3 MSC202 VSC185 ABT180 TE and MSC IMPACT activities (except cancelled or rejected) during the period (16 months)

April 2014TE-MSC RSSO's & Safety Link Person Interviews During the last weeks we had interesting and constructive discussions with the following persons: 4 Activity responsible (TE-MSC-MNC) Deputy DSO TE Department RSO TE Department 3 RP representatives 3 RSSO 7

April 2014TE-MSC RSSO's & Safety Link Person Findings During the interviews we found some common points: The WDP granularity is not uniform, and can vary by respect to the RP representative in charge of the request Since some months the workload to prepare the interventions is higher by respect to the past The reasons of some questions asked by RP colleagues are not always explained; this might cause misunderstanding and a feeling of over-control IMPACT approvals appear sometime too long Doses are not always correctly estimated The activities are (mostly) performed without a written and approved procedure Intervention times sometime are not correctly estimated (maybe too conservative) The limits of splitting big activities in sub-activities are not well defined (We were asked, for example: can we create one single IMPACT for the whole LS1?) 8

April 2014TE-MSC RSSO's & Safety Link Person Possible improvements (Actions => DGS-RP) Normalization of WDP granularity Improve communication between RP and MSC: When asking questions, do not hesitate to explain the reasons: some issues related to time, distance, necessary time to decay etc. might be trivial for experts but sometime hard to be understood if not well explained. IMPACT approvals delay: Agree common rules Following a discussion with RP colleagues we propose: - DIMR I => 48 hours max. - DIMR II => 2 weeks max. - DIMR III (ALARA committee) => 6 weeks min. Try to better estimate the doses 9

April 2014TE-MSC RSSO's & Safety Link Person Possible improvements (Actions => TE-MSC) Procedures: Systematic activities are rarely supported by written and approved procedures Intervention simulations (mock up or spare magnets in workshop) could be organized to prepare specific tasks in particular environments Recall responsible about their duties in terms of intervener’ safety (personnel annual dose) => Action launched, in progress Prepare intervention plans in due time Improve communication between MSC and RP: Do not hesitate to explain the reasons of the intervention, the choice of the technique and the tooling Respect (define?) delays rules for IMPACT requests 10

April 2014TE-MSC RSSO's & Safety Link Person Conclusions It would be useful to have written and approved procedures for the most common activities. An approach similar to SMACC project could be developed; this might appear time consuming in the beginning, but it will simplify the preparation of work and the quality in the next future Communication between RP and MSC is not always optimized. We suggest joint meeting in order to approach the issues as a unique team RP approach for the analysis of IMPACT’s and WDP’s is not homogeneous and shall be normalized (granularity,…) Time delays for approvals (IMPACT, WDP) shall be agreed between RP and MSC (partially done) The (administrative) preparation workload is higher by respect to the past, however, the availability of procedures (or templates of the WDP) and advanced planning could shorten the time needed. 11

April 2014TE-MSC RSSO's & Safety Link Person Thanks for your attention… 12