Doc.: 15-16/0109r00 Submission Liaison Report from 802.18 Date: 21 January, 2016 January 2016 Jay Holcomb, Itron, Inc.Slide 1 Notice: This document has.

Slides:



Advertisements
Similar presentations
Doc.: 18-13/0093r1 Submission July, 2013 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Closing Report Notice: This document has been prepared.
Advertisements

Submission doc.: IEEE /0019r0 March 2015 Steve Shellhammer, QualcommSlide 1 March 2015 Opening Report Date: Authors: Notice: This document.
Submission doc.: IEEE /XXXXr0 Month Year John Doe, Some CompanySlide 1 Insert Presentation Title Here Date: YYYY-MM-DD Authors: Notice: This document.
Submission doc.: IEEE /0089r1 January 2015 Steve Shellhammer, QualcommSlide 1 3GPP LAA Liaison Approval Process Date: Authors: Notice:
Doc.: 18-13/0032 Submission March, 2013 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Opening Report Notice: This document has been prepared to.
Doc.: IEEE Jan07-RR-TAG_Liaison_Report.ppt _RR-TAG_802.22_Liaison_Report_Jan07 Submission January 2007 Peter Murray,
Doc.: IEEE /0732r0 Liaison July 2015 Rich Kennedy, MediaTekSlide 1 RR-TAG (802.18) to Liaison Report Date: Authors:
Doc.: IEEE November06-RR-TAG_Liaison_Report.ppt _RR-TAG_802.22_Liaison_Report_November06 Submission November 2006.
Doc.: IEEE /0014r0 & /0425r0 Submission March 2007 Rich Kennedy, OakTree WirelessSlide 1 RR-TAG Liaison Report Mar07 IEEE
Doc.: IEEE /0078r1 Submission September 2007 Rich Kennedy, OakTree WirelessSlide 1 RR-TAG Liaison Report July 2007 IEEE Notice:
Doc.: IEEE /0054r0 Submission March 2013 Mika Kasslin, NokiaSlide 1 TG1 Closing Report for March 2013 Notice: This document has been prepared.
Doc.: 18-14/0078 Submission November, 2014 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Closing Report Notice: This document has been prepared.
Doc.: 18-15/0043 Submission July 17 th, 2015 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Closing Report Notice: This document has been prepared.
Doc.: 18-15/0034 Submission July, 2015 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Opening Report Notice: This document has been prepared to.
Doc.: IEEE /0185r0 Submission September 2012 Prabodh Varshney, NokiaSlide af Liaison Report Notice: This document has been prepared to.
Doc.: IEEE /0077r1 Submission May 2013 Hyunduk Kang, ETRISlide 1 TG1 Closing Report for May 2013 Notice: This document has been prepared to assist.
Doc.: IEEE RR-TAG_Nov05_Liaison_Report.ppt Submission November 2005 Peter Murray, MotorolaSlide 1 RR-TAG Liaison Report IEEE
Liaison Report from Date: July 16, 2015 July 2015 Month Year
Sept 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Liaison Report on for July 2017] Date.
Liaison from to Date: 21 January, 2016 January 2016 Name
Nov 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Liaison Report on for July 2017] Date.
Submission Title: Sydney e/ Liaison Report.
Liaison from to Date: 15 September, 2016 September 2016
Submission Title: St. Louis e/ Liaison Report.
March 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG LPWA Agenda November 2017 Plenary] Date.
Liaison from to Date: 08 March 2018 March 2018 Name
Closing Report Date: Authors: July 2007 July 2007
March 2018 Project: IEEE P Working Group for Wireless Specialized Networks (WSNs) Submission Title: [Liaison Report on for March 2018] Date.
January 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Liaison Report on for January 2017]
Liaison from to Date: 10 November, 2016 November 2016
January 2018 Project: IEEE P Working Group for Wireless Specialized Networks (WSNs) Submission Title: [Liaison Report on for Jan 2018] Date.
March 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Liaison Report on for March 2017]
July 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Liaison Report on for July 2017] Date.
May 2018 Interim Project: IEEE P Working Group for Wireless Specialized Networks (WSNs) Submission Title: [Liaison Report on for March 2018]
Liaison from to Date: 19 January 2017 January 2017 Name
May 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Liaison Report on for May 2017] Date.
March 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Liaison Report on for Mar 2016] Date.
November Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG x Agenda November 2018] Date Submitted:
<month year> doc.: IEEE < e> <January 2018>
July 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Liaison Report on for July 2016] Date.
Liaison from to Date: 17 March, 2016 March 2016 Name
Closing Report Date: Authors: July 2007 July 2007
Liaison from to Date: 16March 2017 March 2017 Name
Liaison Report from Date: September 20, 2012 September 2012
Liaison from to Date: 11May2017 May 2017 Name
2/24/2019 November 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [RFID Study Group Opening Introduction]
<month year> doc.: IEEE / January 2005
September 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Liaison Report on for September.
Liaison from to Date: 19 May, 2016 March 2016 Name
November 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Liaison Report on for November.
July 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG x Agenda July 2018] Date Submitted:
Liaison from to Date: 15 March 2019 March 2019 Plenary
<month year> doc.: IEEE < e> <March 2016>
<month year> doc.: IEEE < e> <January 2018>
Liaison from to Date: 13May2017 July 2017 Name
Liaison from to Date: 18 January 2018 January 2018 Name
Liaison from to Date: 09 Nov 2017 Nov 2017 Name
September 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG x Agenda September 2018] Date.
<month year> doc.: IEEE < e> <March 2016>
Liaison from to Date: 28 July, 2016 July 2016 Name
March 2019 Liaison Report Date: Authors: March 2019
RR-TAG Opening Report Date: November 8, 2015 Authors: March, 2016
TG 1 November Session Opening Report
<month year> doc.: IEEE < e> <March 2016>
802.11af Liaison Report Date: Authors: January 2013
<month year> doc.: IEEE < e> <March 2019>
Liaison from to Date: 16 May 2019
Liaison from to Date: 17 January 2019
Liaison from to Date: 14 Sept 2017 Sept 2017 Name
Jan 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TeraHertz Closing Report Date Submitted: January.
Presentation transcript:

doc.: 15-16/0109r00 Submission Liaison Report from Date: 21 January, 2016 January 2016 Jay Holcomb, Itron, Inc.Slide 1 Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. NameAffiliationAddressPhone Jay HolcombItron, Inc.2111 N. Molter Liberty Lake, WA

doc.: 15-16/0109r00 Submission Overview This document summarizes the activities of the IEEE Radio Regulatory Technical Advisory Group (RR-TAG) during the January 2016 IEEE 802 Interim Meeting at the Hyatt Regency Peachtree, Atlanta, GA, USA. January 2016 Jay Holcomb, Itron, Inc.Slide 2

doc.: 15-16/0109r00 Submission Documents Reviewed/Discussed 18-15/057r0: FCC NPRM on Bands Above 24GHz x-0000-response-to-fcc , spectrum > 24GHz –Received initial inputs for comments in Dallas and before this Atlanta meeting. – created the document in FCC comment format with the input and updated with further input from the RR-TAG and prepared for EC approval and FCC filing provisional-final-acts-wrc wrc-15-final-press-release results-of-the-first-session-of-the-cpm-for-wrc-19 –Much of the discussion was on the 5GHz band studies for WRC-19, some on ITS and how to review all the UTC groups that will be involved for the different resolutions are identified d-draft-liaison-statement-to-itu-r-wp1a draft-liaison-statement-to-itu-r-wp1a_SM docx –This is initial liaison draft for the new report ITU-R SM , Technology trends of active services in the band above 275GHz January 2016 Jay Holcomb, Itron, Inc.Slide 3

doc.: 15-16/0109r00 Submission FCC Documents Approved response-to-fcc , spectrum > 24GHz –Comments were finalized and sent to the EC for approval and submission to the FCC before the NPRM deadline of Tuesday, 26 January, –There have been a couple of editorial clarifications, e.g. adding to the end of the introduction on basic information about IEEE TG 3d. January 2016 Jay Holcomb, Itron, Inc.Slide 4

doc.: 15-16/0109r00 Submission ITU-R Documents Approved No documents were approved. January 2016 Jay Holcomb, Itron, Inc.Slide 5

doc.: 15-16/0109r00 Submission Meeting Close The RR-TAG adjourned in AM2 on Thursday. The next face to face meeting of the RR-TAG will be at the March 2016 IEEE 802 Plenary meeting at the Sands Venetian Hotel, Macau, PRC January 2016 Jay Holcomb, Itron, Inc.Slide 6