doc.: 15-16/0109r00 Submission Liaison Report from Date: 21 January, 2016 January 2016 Jay Holcomb, Itron, Inc.Slide 1 Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. NameAffiliationAddressPhone Jay HolcombItron, Inc.2111 N. Molter Liberty Lake, WA
doc.: 15-16/0109r00 Submission Overview This document summarizes the activities of the IEEE Radio Regulatory Technical Advisory Group (RR-TAG) during the January 2016 IEEE 802 Interim Meeting at the Hyatt Regency Peachtree, Atlanta, GA, USA. January 2016 Jay Holcomb, Itron, Inc.Slide 2
doc.: 15-16/0109r00 Submission Documents Reviewed/Discussed 18-15/057r0: FCC NPRM on Bands Above 24GHz x-0000-response-to-fcc , spectrum > 24GHz –Received initial inputs for comments in Dallas and before this Atlanta meeting. – created the document in FCC comment format with the input and updated with further input from the RR-TAG and prepared for EC approval and FCC filing provisional-final-acts-wrc wrc-15-final-press-release results-of-the-first-session-of-the-cpm-for-wrc-19 –Much of the discussion was on the 5GHz band studies for WRC-19, some on ITS and how to review all the UTC groups that will be involved for the different resolutions are identified d-draft-liaison-statement-to-itu-r-wp1a draft-liaison-statement-to-itu-r-wp1a_SM docx –This is initial liaison draft for the new report ITU-R SM , Technology trends of active services in the band above 275GHz January 2016 Jay Holcomb, Itron, Inc.Slide 3
doc.: 15-16/0109r00 Submission FCC Documents Approved response-to-fcc , spectrum > 24GHz –Comments were finalized and sent to the EC for approval and submission to the FCC before the NPRM deadline of Tuesday, 26 January, –There have been a couple of editorial clarifications, e.g. adding to the end of the introduction on basic information about IEEE TG 3d. January 2016 Jay Holcomb, Itron, Inc.Slide 4
doc.: 15-16/0109r00 Submission ITU-R Documents Approved No documents were approved. January 2016 Jay Holcomb, Itron, Inc.Slide 5
doc.: 15-16/0109r00 Submission Meeting Close The RR-TAG adjourned in AM2 on Thursday. The next face to face meeting of the RR-TAG will be at the March 2016 IEEE 802 Plenary meeting at the Sands Venetian Hotel, Macau, PRC January 2016 Jay Holcomb, Itron, Inc.Slide 6