Www.ghsp.com A JSJ Business APQP/PSO. www.ghsp.com A JSJ Business Purpose: To understand key concepts of the GHSP APQP and PSO process by reviewing the.

Slides:



Advertisements
Similar presentations
Initial Capacity Assessment Sheet (ICAS) &
Advertisements

WAREHOUSING MANAGEMENT
WAREHOUSING MANAGEMENT
Global Supplier Quality Manual PPAP Requirements
PPAP Requirements Training
Lifecycle Quality Management With the QDM System.
First Article Inspection Report
ISO 9001 : 2000.
HACCP Manager Software™
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Guardian Tier 2 PPAP Guidelines
Quality Management System
The Quality Improvement Model
Food Safety Management Systems
First Article Inspection
ISO 9000 Overview The Purpose of this Overview l “What is ISO 9000?” l What will it require from YOU, as a (Company) Employee?
Supplier Program Review Meeting #1
Supplier Program Review Meeting #1
8-2 Food Safety Management Systems Food safety management system: Group of practices and procedures intended to prevent foodborne illness Actively controls.
Food Safety Management Systems
1 Manufacturing Processes and Validation for Next Generation Implants.
A Basic Overview of the US FDA’s Regulations for Regulatory Compliance
Visit us at E mail: Tele: www.globalmanagergroup.com.
From Research Prototype to Production
Supplier Overview of Johnson & Johnson MD&D Supplier Quality Standard Operating Procedures (SOPs) Supplier Process Control.
Visit us at E mail: Tele:
DENSO Denso Manufacturing Michigan Inc. Production Control Supplier Manual Section Packaging Title Packaging Program Responsibilities Control No. PKG-001.
North American Lighting and TQM Kevin Blatnik. My Background 1998: Graduated from EIU with BSIT 1998: Graduated from EIU with BSIT Went to work for Navistar.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
ALCOM Confidential 1 Supplier Controlled - Safe Launch Plan Sep 2013.
Aloe Vera of America: A Quality IASC-Certified Producer of Aloe Vera Presented by Walt Jones.
Delphi E&S Instructions for Submitting PPAP for Component Parts to the PPAP Dropbox on the Websitewww.delphisuppliers.com Revised.
Supplier Capacity Worksheet User Instructions September 2015 Revised December 2, 2015.
8-2 Service Objectives: Food safety management systems Active managerial control Hazard Analysis Critical Control point (HACCP)
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Proprietary + Confidential1 Tech Review Guideline Please arrive at your Tech Review ready to present and discuss all of the following information. The.
A JSJ Business Production Part Approval Process AIAG PPAP 4 th Edition Supplier Production Part approval process GHSP.
A JSJ Business RFQ Process. A JSJ Business Yes No.
19-Feb-16 “"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this.
DENSO Supplier Labeling Policy
Supplier Performance Development Process
1 Manufacturing Processes and Validation for Next Generation Implants.
Laboratory equipment Dr. W. Huisman Cairo, November 21th 2012.
CM&C Inspections The Pre-Approval Inspection (PAI) in the US 27 May 2010.
Production Part Approval Process
Process engineering Quality controls.
Control Plan Training.
Integrating QS9000 Requirements
Quality Management Process
DSQR Training Supplier Quality Manual
Global Supplier Quality Early Production Containment Training
Appendix A AESQ Standard Interconnection Overview
Supplier Performance Development Process
  Aptiv Global Supplier Quality Early Production Containment Training.
APQP Quality Planning in ISO 9000/ QS-9000 or ISO/ TS or .....
APQP PROCESS FLOW Prepare for APQP Plan and Define Program
This PPAP File Is Under Construction
RISK REDUCTION PROCESS
CVG Global Phased PPAP Process
LEAN IMPLEMENTATION Training SUMMARY OF RESULTS
First Article Inspection
Production Part Approval Process
Product and Process Validation JAN ROOVERS ASSOCIATES, INC.
Advanced Product Quality Planning 2nd Edition
Supplier Performance Development Process
Integrating TS Requirements
Global Supplier Quality Early Production Containment Training
Advanced Product Quality Planning 2nd Edition
1 ADVANCED PRODUCT QUALITY PLANNING Prepared By: Mr. Prashant S. Kshirsagar (Sr.Manager-QA dept.)
Presentation transcript:

A JSJ Business APQP/PSO

A JSJ Business Purpose: To understand key concepts of the GHSP APQP and PSO process by reviewing the 16 sections. Why do we do this??? Assure all documentation is in place and ready for PPAP Assure that the process can run at the quoted capacity Prepared for SOP (Start of Production)

A JSJ Business 16 Sections of the APQP/PSO 1. Plant Layout & Process Flow Diagram9. Parts Packaging/Shipping Specifications Available 2. Design and Process FMEA (as applies)10. Key Quality Systems Demonstrated 3. Product Control Plan11. Containment Plan Available 4. Purchased Components Readiness/Sub Supplier Part Submission Complete 12. Preventative Maintenance Plans Established 5. Product Specifications/Drawings/Blueprints13. Gage & Check Fixture R&R Studies Complete 6. Tooling, Equipment, and Fixtures Identified14. Production Validation Complete (as applies) 7. Operators Trained and Work Instructions Available 15. Line Speed and Capacity Verified 8. Parts Handling Plan Available16. PPAP Readiness

A JSJ Business Section 1: Plant Layout & Process Flow Diagram APQP Requirement  Process Flow Diagram dated and current PSO Requirement  Review updated floor plan showing GHSP equipment  Are inspection points identified  Identified area for Non-Conforming Material  Flow Diagram walk showing the process meets the documented flow chart.

A JSJ Business Section 2: Design and Process FMEA APQP Requirement DFMEA (If Supplier is Design Responsible)  Does the DFMEA include all functional and appearance specifications, CC/SC’s, etc.  Are all RPN’s calculated. PFMEA  Assure that all functional and appearance specifications, CC/SC’s, etc.  All RPN’s are calculated  Does the PFMEA follow the Flow Diagram  Assure that all PTR’s and lessons learned are listed on the PFMEA.

A JSJ Business Section 3: Production Control Plan APQP Requirement  Production Control Plan dated and current  Does the Control Plan follow the Flow Diagram & PFMEA  Assure all SC/CC’s (Star Dimensions) and CP (Control Points) are included and controls are listed  Annual re-validation and submissions are to be listed on the control plan PSO Requirement  Are all the elements in the control plan being followed as documented.  Are all controls (including SPC) being used and followed.  Are the controls verified on a periodic bases to ensure desired results.

A JSJ Business Section 4: Purchased Component Readiness/Sub-Supplier Part Submission APQP Requirement  Have all sub-supplier PPAP’s been received and approved. PSW’ s available for review PSO Requirement  For components that have long lead times are there plans in place to assure adequate material in the pipe line  Is there an effective lot traceability system in place for all sub-components going into assemblies.

A JSJ Business Section 5: Product Specifications Drawings/Blueprints PSO Requirement  Assure that the supplier has the latest GHSP approved drawing on hand  Make sure that the supplier has any customer specifics on hand and that they are at the latest revision.  These would be such items as contamination specs, material specs, GHSP Workmanship standard, etc.

A JSJ Business Section 6: Tooling, Equipment, & Fixtures Identified APQP Requirement  GHSP tooling and gage sketch form PSO Requirement  Is all the equipment and gages in place as it would be used in production.  Have customer specific requirements been met.  Such as Ford tool tags been place on all Ford owned tooling as an example

A JSJ Business Section 7: Operator Training & Work Instructions APQP Requirement  Staffing plan for the entire cell.  Managers, Engineering, Quality, and operators  Training matrix for all cell operations PSO Requirement  Are all visual aids dated, approved & current  Are inspection gages and gage instructions readily available  Have all operators been trained and ready for production

A JSJ Business Section 8: Parts Handling Plan Available APQP Requirement  GHSP Packaging Sketch Form PSO Requirement  Storage facilities for finished goods are protected from environmental factors.  Orders in place for packaging to support on time shipments  Review the process to assure there is not the opportunity to mix parts

A JSJ Business Section 9: Parts Packaging/Shipping Specifications Available APQP Requirement  Label meets the GHSP requirements as defined in the Supplier Standards Manual  GHSP Packaging Sketch Form PSO Requirement  Are you ready to send Advanced Shipping Notice (ASN)  For new suppliers have they been set up in SV and do they have a person dedicated to reviewing the site daily. This is where you will get your schedules.  Also assure that there is a backup in the event that person is out.

A JSJ Business Section 10: Key Quality Systems Demonstrated PSO Requirements  General quality requirements  Compliments the TS/ISO registration  8D process in place  Document control  Red Rabbit/Go NoGo masters are in place and signed off  SPC has been established and in place

A JSJ Business Section 11: Containment Plan Available APQP Requirement  Pre Launch Control Plan PSO Requirement  Is the Safe Launch or GP12 early containment process in place.  Are the containment results being reviewed on a regular bases  Is there a plan to exit containment  Is there a separate station for this process.  Are instructions available at the station  Is there a plant contingency plan written

A JSJ Business Section 12: Preventative Maintenance Plans Established APQP Requirement  Preventative Maintenance Plan for each piece of equipment and or tool PSO Requirement  Assure that there is an adequate supply of perishable tools (such as drills, cutters, etc.)  Are all the Red Rabbits, Go NoGo parts in the preventative maintenance system to assure that they are verified.

A JSJ Business Section 13: Gage & Check Fixture R&R Studies Complete APQP Requirement  Gage R&R studies per AIAG MSA manual PSO Requirement  Have all functional gages been dimensionally certified  Are procedures being followed to calibrate test & measuring equipment on a regular bases

A JSJ Business Section 14: Product Validation Complete (as applies)  Review any design or product validation data that is present for items that require it.  Most Validation testing is completed by GHSP within the shifter or pump

A JSJ Business Section 15: Line Speed and Capacity Verified APQP Requirement  Capacity Analysis performed on the process PSO Requirement  Has a machine process capability study been complete on the production equipment.  Have there been contingency plans/safety stock established to support production in the event of machine breakdown or force majeure  Will this plan accommodate GHSP schedule changes  Does the supplier know and understand the ramp-up and peak demands for the program  Does the number of acceptable parts coming of the end of line meet or exceed production requirements

A JSJ Business Section 16: PPAP Readiness  Is PPAP ready to be submitted to GHSP per the deliverables set fort by SDE/SQE.  Initial process capability performed with 125 pieces (sub groups of 5). Ppk > 1.67 (see section of Global Supplier Standards Manual)  Full dimensional layout been performed on a minimum of 5 pieces. Are all cavities represented if <= 5  Has the supplier used common industry practices and forms as outlined in the AIAG PPAP Manual.

A JSJ Business >> Pull together the open items and put together an open issues list with person responsible and an achievable due date.

A JSJ Business >> The top summary page can be used to communicate the results from the supplier. This shows the red yellow green status of each element, the run results, and sign off. All suppliers are expected to complete APQP and a self assessed PSO, critical parts to the assembly will require onsite PSO by GHSP SDE.

A JSJ Business