September 28, 2012 Draft Assessment Results Technical Committee Meeting September 28, 2012 1.

Slides:



Advertisements
Similar presentations
Hydro Peaking Capacity Analysis & Northwest Regional Forecast Comparison Resource Adequacy Technical Committee July 28, 2010.
Advertisements

Preliminary Resource Adequacy Assessment for the 2017 Pacific Northwest Power Supply NW Resource Adequacy Forum Technical Committee Meeting August 16 th.
Power Supply Adequacy Assessment Model/Methodology Review Steering Subcommittee Meeting January 29, 2010.
Resource Adequacy Forum 2019 Adequacy Assessment Overview PNGC Offices June 28, 2013.
Genesys Model Enhancements October 4, 2011 NW Resource Adequacy Steering Committee Meeting Gwendolyn S Shearer.
 Hit September 21, 1938  Category 5  mph winds  Hit September 21, 1938  Category 5  mph winds.
Discrim Continued Psy 524 Andrew Ainsworth. Types of Discriminant Function Analysis They are the same as the types of multiple regression Direct Discrim.
Year 2 Curriculum Meeting September Reading Shared Reading - A shared text that we read together Guided Reading – Each child reads with an adult.
NW Resource Adequacy Forum Steering Committee Conference Call November 4, 2010.
1 Local Area Planning Update to TRANSAC – March 11, 2015.
Announced Coal Unit Retirements: Effect on Regional Resource Adequacy Council Meeting January 16, 2013 Portland, Oregon Boardman Centralia 1.
1 Planning Reserve Margin Dan Egolf Senior Manager, Power Supply & Planning.
A Resource Adequacy Standard for the Pacific Northwest Resource Adequacy Technical Committee January 17, 2008 Portland Airport.
Developing an Adequacy Metric Resource Adequacy Forum Technical Subcommittee Meeting October 16, 2009.
Adequacy Assessment for the 2017 Pacific Northwest Power Supply Steering Committee Meeting October 26, 2012 Portland, Oregon 1.
Revising the Pacific Northwest Resource Adequacy Standard Resource Adequacy Technical Committee June 23, 2011.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
Loss of Load Probability (LOLP) Project October 16, 2009 Resource Adequacy Technical Committee Meeting.
Illustrative FCRPS Examples Comparing Capacity Adequacy Calculations for Federal Hydro- Dominated System Mary Johannis PNW Resource Adequacy Technical.
CARTOON STRIP SEQUENCE Water Cycle. Theory A cartoon strip sequence is a series of cartoon- style pictures that shows a sequence of events. The pictures.
May 31, Resource Adequacy Capacity Standard Resource Adequacy Forum Technical Committee May 31, 2006 Background Image: Bennett, Christian Science.
Resource Adequacy Technical Committee Meeting April 6, 2011.
Evaluating Hydro Capacity for Capacity Adequacy Standard: Selection of Hydro Events Mary Johannis PNW Resource Adequacy Technical Committee Mtg November.
Evaluating Hydro Capacity for Capacity Adequacy Standard: Selection of Hydro Events Eric King/ Mary Johannis PNW Resource Adequacy Technical Committee.
Providing Resource Planning Guidance to Individual Utilities PNW Resource Adequacy Technical Committee Meeting June 20, 2007.
Power Amplifiers Unit – 4.1 Classification of Power Amplifiers  Power amplifiers are classified based on the Q point  If the operating point is chosen.
EFFECTIVE LOAD CARRYING CAPABILITY FOR WIND-POWER.
 Answer the following questions using complete sentences on your journal entry sheet › How much of this planet is covered by water? Where did the water.
2009 Pacific Northwest Resource Adequacy Assessment Resource Adequacy Technical Committee October 16, 2009.
Rough Draft Drawings. Due Wednesday, September 14 th Your three sketches: Match your words Have some degree of complexity Show media experimentation.
2010 Work Plan Steering Committee January 29, 2010.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
Moving toward a Final Resource Adequacy Standard Resource Adequacy Forum Steering Committee Meeting September 27, 2007.
Covered TEKS Science, Grade 2 (b) Knowledge and skills (10) Science concepts. The student knows that the natural world includes rocks, soil, water,
Evaluation of Columbia River Sustained Hydro Peaking Capacity Eric King / Mary Johannis PNW Resource Adequacy Technical Committee Meeting May 31, 2006.
Work Plan Resource Adequacy Forum Technical Committee July 29, 2009.
Study Results April 16, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Capacity Metric & Hydro Capacity Assessment Decisions Mary Johannis PNW Resource Adequacy Technical Committee Meeting June 20, 2007.
Resource Adequacy Assessment for 2015 Resource Adequacy Forum Technical Committee Meeting October 1, 2010.
Out of Region Market Assumption Resource Adequacy Technical Committee December 1, 2011.
NW Loss of Load Probability James Gall Power Supply Analyst
Developing Synthetic Temperature-Correlated Wind Generation Data Steering Committee Meeting January 29, 2010.
Probabilistic Approach to Resource Adequacy Resource Adequacy Forum Technical Committee Meeting Portland, OR January 23, 2009.
Market Operations Standing Committee of the IMO Market Operations Standing Committee July 23, 2003.
Defining LOLP Resource Adequacy Forum Technical Subcommittee Meeting November 14, 2008.
Steering Committee Meeting March 9, Why talk about assumptions? Garbage in, garbage out! “Let’s go dumpster diving!” Results sensitive to key.
Modeling the Hydroelectric System in GENESYS Resource Adequacy Forum Technical Committee Meeting July 25, 2007.
2010 Northwest Regional Forecast Resource Adequacy Technical Committee April 22, 2010.
59th Technical Committee Meeting, Barcelona (ES), March 26-27, 2012 SC A1 PREFERENTIAL SUBJECTS FOR 2014 SESSION DRAFT PS1: Developments in Rotating Electrical.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
A Methodological Basis for the Definition of Common Criteria regarding the Identification of Bottlenecks, Missing Links and Quality of Service in Infrastructure.
Subtract Linear Expressions Section 5.7
Weather. Water cycle Changes in weather.
Vetting the GENESYS Model
SCIENCE GRADE FOUR – WEATHER
Resource Adequacy Assessment for 2015 Interim Results Resource Adequacy Forum Technical Committee Meeting July 28, 2010.
مديريت موثر جلسات Running a Meeting that Works
EDLC(Embedded system Development Life Cycle ).
Resources Program Activities Outputs Outcomes Impact Assessment +
2021 Adequacy Assessment Status Report
Technical Committee Meeting March 18, 2016
Steering Committee Webinar March 25, 2016
Progress on Resource Adequacy Assessment for 2017
Resource Adequacy Steering Committee Meeting October 4, 2011

Base on maximum operating wind capacity at end of planning period
Online Pogo Game Customer Service
Pogo Game Customer Care Helpline Number

Call Pogo Contact Phone Number and Enjoy Pogo Game
Presentation transcript:

September 28, 2012 Draft Assessment Results Technical Committee Meeting September 28,

Other Assumptions  How many games do we need to do? – There are 80 water years (sequential draw), 77 load years (random draw), and wind year is lock-stepped with load year – Random draws do not cover all unique combinations of water and load/wind unless we do a large number of games – Too few games can produce uneven results  Which wind year set do we use? – There are 20 sets of temperature-correlated wind capacity factors  Look at “instantaneous” LOLP 2

3

4

Number of Games  How many games? … (80 x 77 = 6160) – Sequential water pairs uniquely with load/wind by using a cycled sequence for the load years – Game #1 pairs 1929 water with 1929 load, and the run is essentially in lockstep for the first 77 games (game #77 pairs 2005 water and load) – Game #78 pairs 2006 water with 1929 load – Water year 1929 pairs with load year 1929, 1932, 1935, …, and so on 5

Wind Capacity Sets  Which one? – For now, we selected set #18, which tested at the mid-range for LOLP at 4900 games – The test cases were done using older assumptions (70-year hydro, some differences in wind totals, other resources) 6

Wind Capacity Sets 7

Draft Assessment Results 8

9

10

11

12

13

14

September 28, 2012 Assessment 15