Mexico 1 Plant VI ~ “H” Line Core Room ~ Cell 2 ~ FM 5.0L V8 Block Line Process ~ 2011-06-21.

Slides:



Advertisements
Similar presentations
Open Powerpoint and go to Slide Show in the top menu. Click VIEW SHOW. Then type in the white boxes. Type Name Date:
Advertisements

Layouts Multibend-Center. Manual Loading Manual Loading, Finished part back to operator.
The Bubble-tastic Bubble Mouse Box Created by MelloWorks Founder, Editor, Designer, and Janitor: Jamie Cliff.
Cell Structure and Function. Animal Cell Plant Cell.
JIT AND LEAN PRODUCTION SYSTEM BY AMAR P. NARKHEDE.
Handling Marking Depaneling Screen Printing Final Assembly Solder Frame Handling / Line Examples.
Flowing Heat Matt Weisenberger, University of Kentucky, Center for Applied Energy Research 2540 Research Park Dr., Lexington,
MODELING AND ANALYSIS OF MANUFACTURING SYSTEMS Session 13 MATERIAL HANDLING SYSTEMS E. Gutierrez-Miravete Spring 2001.
Given data file.
Sir Isaac Newton Laws of Motion November Sir Isaac Newton 1. Described 3 laws that relate forces to motion 2. Force-a push or a pull, all forces.
Network Storage and Appliance Box Build By: Cubatic Engineering 01/09/2015.
Material Transport Systems
Material Handling Material handling is the function of moving the right material to the right place in the right time, in the right amount, in sequence,
Automation Simplified conveyor system It is a system of mechanical handling equipment that moves materials from one location to.
Control of manufacturing systems Slovak University of Technology Faculty of Material Science and Technology in Trnava.
Most of the land on St Lucia is very steep but, where the land is less steep around the coast and in river valleys, it has been.
Figure 3.1.: Photo of the Circored Plant. ~ 160 m Iron Ore Fines CFB Preheater Inclined Bucket Elevator 1st Stage CFB Reactor 2nd Stage FB Reactor Briquetting.
Pick up sample 1. 1.Add a tip 2. 2.Push to 1 st stop 3. 3.Lower tip into solution 4. 4.Release plunger Drop off sample 1. 1.Lower tip into tube 2. 2.Push.
Chapter 4 Process Design.
Presented To You By BELT MAINTENANCE GROUP The Project THE WORLD’S LONGEST SINGLE FLIGHT CONVEYOR SYSTEM 40.6 KM OF 36” WIDE ST900 STEEL CORD CONVEYOR.
1 Franck FONTANILI - CGI IMSM'07 Content of the presentation Introduction and context Problem Proposed solution Results Conclusions and perspectives discrete-event.
Teamed up with Span-Tech Building Systems & Conrad American Grain Bins To Provide ALL YOUR GRAIN STORAGE NEEDS.
DAS Dynamic Assembly System FEATURES OF DYNAMIC ASSEMBLY SYSTEM Name of Dynamic Assembly System (DAS) is pointing out system adaptability to needs of production.
Module 4 Projection System CHARMEIN JAKOSALEM.  Filmstrip Projector Filmstrip Projector  Slide Projector Slide Projector  Overhead Projector Overhead.
Technical Note 6 Facility Layout
Choose your characters and speech bubbles and drag them onto the slide Use the flip and rotate tools when needed and add text.
Training syllabus Samuli Ahonen.
Lecture 20 Conveyors. Grain Spreaders  most common = spinner  most = electric motor driven  some use rotating auger  some natural drop of grain 
Layouts MiniBendCenter. Intelligent load robot Pick from bulk container Bulk container scan.
PRODUCTION PLANNING. Process Planning Management Approval design production.
MNM Fatal Fall of Person Fall of Person May 22, 2006 (California) May 22, 2006 (California) Crushed Stone Operation Crushed Stone Operation Mechanic.
Front Structure Load and Weld Station
Module Three Lifting with 60 inch Pry Bars and Cribbing.
Chapter 21 Intermodal Transportation. The process of combining transportation modes.
Flowing Heat 4th grade science experiment
Automated guided vehicle Types & Application
Technological process for parts FAN COVER
CONTENTS Definition of Material Handling Objectives
Lecture 8: Arena: Entity Transfer
Reminder of Stave250 Tooling Design
continued on next slide
Block Assembly (not shown)
Solar Gas turbine Engine assemblies
CCA Design-In Safety/Ergonomics Process
BSOP 303 Innovative Education--snaptutorial.com
                                                                                                                                                                                                                                                
continued on next slide
continued on next slide
Cell #2 (2) Crankcases w/Liners.
Off-Road Equipment Management TSM 262: Spring 2016
Medical PowerPoint Templates
World-Views of Simulation
Choose your characters and speech bubbles and drag them onto the slide
Choose your characters and speech bubbles and drag them onto the slide
Choose your characters and speech bubbles and drag them onto the slide
Joints and Levers (22.2) Label the parts that make up each joint:
Solving Systems of Equation by Substitution
Choose your characters and speech bubbles and drag them onto the slide
Create a drop down in excel
This is 1 minecraft block it is 1 unit long and 1 unit wide
Around the room Orders of operations.
Choose your characters and speech bubbles and drag them onto the slide
1st language words & bits 2nd language words & bits
A few tricks to take you beyond the basics of Microsoft Office
Cells and the Microscope
This is 1 minecraft block it is 1 unit long and 1 unit wide
Increasing Operational Excellence using M3
continued on next slide
Gripper CC4/6H-R1 and R3 IPR-Nr /
continued on next slide
Presentation transcript:

Mexico 1 Plant VI ~ “H” Line Core Room ~ Cell 2 ~ FM 5.0L V8 Block Line Process ~

Mexico 2 Cell 2 Layout

Mexico 3 Cell #2 (2) Bases w/Chills & (2) Slides

Mexico 4 2HR1 unloads (2) chills from chill pallet. (72) Chills/pallet x (2) Chill pallets (144) chills

Mexico 5 2HR1 loads (2) chills into core box.

Mexico 6 2HR2 unloads (2) bases & (2) slide cores from core box.

Mexico 7 2HR2 drops off 1 st Base to Assembly Pallet. FLOW

Mexico 8 2HR2 drops off 2nd Base to Assembly Pallet. FLOW

Mexico 9 2HR2 drops off 1 st slide core onto flat belt conveyor. FLOW

Mexico 10 2HR2 drops off 2 nd slide core onto flat belt conveyor. FLOW

Mexico 11 LINE FLOW Operator takes slide from flat top conveyor and assembles to base core. Operator will put slides to stage when 2HR2 is placing base cores into buffers.

Mexico 12 2HR2 Buffer (2) Base cores/shelf x (4) shelves/buffer x (2) Buffers in cell Buffer Capacity = (16) Bases

Mexico 13 2HR1 Tool Stand V8 EoAT I4 EoAT