Mickaël LACROIX (LAL)ILC-HiGrade Scientific and Annual Meeting 1 IN2P3 Les deux infinis IN2P3 Les deux infinis Mickaël LACROIX (LAL) ILC-HiGrade Scientific.

Slides:



Advertisements
Similar presentations
Progress and Plan for Superconducting RF Cavity RF Group.
Advertisements

RF Unit Test Facility at NML & CM1 Test Plan Bob Kephart Fermilab IWLC-10 October 20, 2010.
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
Cleaning Methods of SRF Power Couplers Mircea Stirbet Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
Dr. Michael Peiniger Superconducting RF activities at RI Research Instruments with a focus on EXFEL cavity production.
The ESS vacuum team has overall responsibility for all technical vacuum systems used on the: Accelerator, Target and Neutron Scattering Instruments and.
Superconducting Accelerating Cryo-Module Tests at DESY International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Denis Kostin, MHF-SL,
Status report on “Industrialization studies” at LAL on power couplers for XFEL _____ TILC08 – Tohoku University 3-6 March 2008 Sendai - Japan G. Wormser.
S1 Global Module Cavity String Assembly Workflow Tug Arkan January 15, 2010.
E. Doyle 7/20/06 rev 9/13/06 1 / 16RF Coupler Assembly Facility SLAC TTF3 Coupler Assembly Facility Specifications Based on TESLA facility built at LAL,
S. Prat SCRF meeting Fermilab April 21-25, 2008 Status report on “Industrialization studies” at LAL on power couplers for XFEL _____ SCRF Meeting Fermi.
CEC/ICMC 2015, Tucson Anatoly Zhirnov, DESY presented by Anatoly Zhirnov, DESY, MKS With a huge appreciation to colleagues from INP-PAS (Poland), WUT (Poland),
1 E. KAKO (KEK) 2012' May 28 Clermont 1 A_RD_03 R/D for the High Power Couplers for ILC Walid KAABI (LAL-Orsay, France) Eiji KAKO (KEK, Japan)
LALEucard WP IN2P3 Les deux infinis IN2P3 Les deux infinis W. Kaabi, Y. Peinaud, A. Thiebault, E. Herry, A. Variola. M. Lacroix, F. Letellier-Cohen,
Test Results of TTF-V Couplers for ILC H. JENHANI (CEA/IRFU) 1.
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
CERN status - Nb cavity – Manufacturing 1 15/Nevember/2010, Ofelia Capatina EN/MME 1 SPL Cavity Working Group Meeting TaskExternal Company CERN Provide.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
14-Dec-15S.Movchan Straw manufacturing and QC1 Straw manufacturing procedure and QC tape and straw parameters specification conditions of straw production:
1 K.Jensch, D.Kostin, DESY - Cryomodule components List S1 – DESY parts DESY parts for the S1 Cavity-String.
Eric Montesinos - CERN - First SPL collaboration meeting - CERN December 11th 2008 First SPL collaboration meeting Experience with the LHC Main power Coupler.
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
TILC09 SCRF Session Global Design Effort 1 EU Status TILC09 SCRF Session Lutz Lilje DESY.
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
Medium Beta Cavities Paolo Michelato, Paolo Pierini, and Carlo Pagani INFN Milano - LASA.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
HiGrade-Kickoff DESY Global Design Effort 1 ILC-HiGrade WP6 High-Gradient cavities Lutz Lilje DESY.
Orsay, May 5th 2011EuCARD- WP IN2P3 Les deux infinis IN2P3 Les deux infinis Orsay, May 5 th 2011 EuCARD Meeting WP10.8: Plasma Discharge Cleaning.
Lutz Lilje DESY -MPY- Summary of the Superconducting RF WG DESY -MPY Overview on talks given List European Assets.
October, 2009 Cost of SRF Components Gary McIntyre October, 2009 Internal Review.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
Status of TTF3 Coupler Assembly Program November 26, 2007 Jeff Tice.
CMS Double Chooz HESS Edelweiss Herschel ALICE Detecting radiations from the Universe. EXPERIENCE WITH VACUUM SYSTEM FROM DESY AND CEA SOLUTIONS TTC topical.
Guillaume Olry, Sébastien Bousson CNRS/IN2P3/ IPN Orsay – Paris-Sud University Experience on Spiral2 cavity cleanliness degradation during clean room assembly.
Overview on DESY Infrastructure and up date/ grade Activities schedule status and plans Axel Matheisen DESY.
C.MADEC - TTC meeting E-XFEL cryomodule assembly : prototyping phase at Saclay.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
Shrikant_Pattalwar ICEC 26, March 7-11, 2016, Delhi 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
Vacuum experiences on XFEL Beam Position Quadrupole Units (BQU) preparation Marco Schalwat TTC Topical Workshop on SRF Cryomodule Clean Room Assembly CEA.
Overview of elliptical cryomodules vacuum system Vacuum Equipment Standardization meeting February 2014 P. Bosland – C. Darve – N. Elias.
Infrastructure status for XFEL Ing. G. Corniani Ettore Zanon s.p.a. TESLA TECNOLOGY COLLABORATION INFN and UNIVERSITYof MILANO MEETING 28 Feb - 3 March.
Vacuum Related Procedures and Tools of IHEP ILC Test Cryomodule Assembly Jiyuan Zhai (IHEP) TTC Topical Workshop on SRF Cryomodule Clean Room Assembly.
ILC-HiGrade annual meeting - 22 November 2010 ILC-HiGrade Meeting Cavity-Treatment at CEA Saclay (WP6) F. Eozénou.
France Japan Particle Physics laboratory (FJPPL) first workshop at KEK, Tsukuba, Japan 10 th May 2007 A_R&D_3 R&D on High Power Couplers for the ILC Hassen.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
LALEucard WP IN2P3 Les deux infinis IN2P3 Les deux infinis W. Kaabi, Y. Peinaud, A. Thiebault, E. Herry, A. Variola. M. Lacroix, B. Mercier and.
Guillaume Olry on behalf the IPN Orsay SPIRAL2 team TTC Meeting – Milan, 28 Feb-3 March 2011.
ASSEMBLY OF THE IFMIF CRYOMODULE Janic Chambrillon On behalf of the SRF-Linac Team TTC Meetting - June 5th – 8th, Saclay.
Status of E-XFEL Module Assembly at Saclay
Tongming Huang (IHEP) On behalf of the power coupler working group
Field Emission Minimization for LCLS-II
Cryomodule test stand at ESS site
Sub-system integration for the VBOX
Medium beta cryomodule demonstrator M-ECCTD
Power coupler at DESY & for XFEL
DESY Experiences on Use of Gas overlay during Assemblies
SPS cryogenic proximity equipment and SM18 validation
Mathieu, Gabriel, Max, Spyros, Guillaume
Definition of work flow for string DESY Example on critical operation
LAL Status - based on inputs from W. Kaabi and A. Stocchi - cf
Accelerator Module Test Facility
WP 3 coordination meeting Saclay May 2008
High Power Couplers and… pushing the limits of SC cavities
IHEP Cryomodule Status
INSTITUTE OF HIGH ENERGY PHYSICS
Saclay Test Facilities
XFEL cryomodule production and Reliability improvement
Presentation transcript:

Mickaël LACROIX (LAL)ILC-HiGrade Scientific and Annual Meeting 1 IN2P3 Les deux infinis IN2P3 Les deux infinis Mickaël LACROIX (LAL) ILC-HiGrade Scientific and Annual Meeting (DESY, 22 November, 2010) ILC HiGrade WP7 couplers

Mickaël LACROIX (LAL)ILC-HiGrade Scientific and Annual Meeting 2 IN2P3 Les deux infinis  R&D at LAL (Eucard)  Coupler production  Process  Subcontractor status  LAL status  Schedule  ILC Higrade cost ILC HiGrade WP7 couplers Summary

Mickaël LACROIX (LAL)ILC-HiGrade Scientific and Annual Meeting 3 IN2P3 Les deux infinis Clean with alcoholised tissues dust « free » surfaces Place the parts in the MAS Pieces in the MAS Place the piece in the bath Pieces in the bath Full and warm the bath (detergent+water) T=50°C Ultrasonic bath Time=15min Rinse the pieces Resistivity > 14MOhm.cm Dry under laminar flow 48h Count the particules Nb (size>0.3µm)<10part/pieds3 Bake under vacuum Time=24h Dirty coldparts and test waveguide Assemble the pieces Clean Dressing Room ISO 6 (class1000) Material Air Shower Air Shower ISO4 (class10) Dirty Dressing Room Oven Bench Rinsing sink Ultrasonic bath  Actual LAL cleaning process Disavantages: - Total time> 120h  5 days -No repeatability of the process -Pollution risk on pieces between each steps LAL R&D (Eucard) : Automatic Cleaning System Eucard WP 10.8

Mickaël LACROIX (LAL)ILC-HiGrade Scientific and Annual Meeting 4 IN2P3 Les deux infinis  Future cleaning process LAL R&D (Eucard): Automatic Cleaning System Clean Dressing Room ISO 6 (class1000) Material Air Shower Air Shower ISO4 (class10) Dirty Dressing Room Cleaning Machine Bench Rinsing sink Ultrasonic bath Machine loading Loaded parts Machine Cycle End of machine cycle Machine unloading Exited parts Cold (or warm) parts and test waveguide Parts assembly Eucard WP 10.8 Advantages: -Reduce the total time and work as a background task (during the night for example) -Improve the repeatability of the process -Suppress the pollution risk of pieces between the steps Machine ready by the end of 2011

Mickaël LACROIX (LAL)ILC-HiGrade Scientific and Annual Meeting 5 IN2P3 Les deux infinis  Process  Gas discharge introduction into internal coupler part  Controlled pumping to reach 10-1 mbar pressure and create a laminar pumping flux  Direct current bias application with a positive antenna voltage and a grounded coupler corps  Plasma creation at all power coupler internal parts LAL R&D (Eucard): Plasma discharge Eucard WP 10.8 R.G.A Gauge Cold part Transition wave guide box (TWG) DN16CF viewport All metal valve DN40CF All metal valve DN16CF Adaptator DN40KF for turbo pumping + Gas inlet Pumping Bench for experiment ready by the middle of 2011

Mickaël LACROIX (LAL)ILC-HiGrade Scientific and Annual Meeting 6 IN2P3 Les deux infinis ILC HiGrade WP7 couplers Base line strategy  Goal  Add the ILC HiGrade coupler order to the XFEL order  Advantages  Good XFEL production follow up  Mass production cost  Disavantage  Linked with the XFEL schedule

Mickaël LACROIX (LAL)ILC-HiGrade Scientific and Annual Meeting 7 IN2P3 Les deux infinis Coupler production SubcontractorLAL IRFU RF Conditioning Assembling on cryomodule Manufacturing and cleaning ILC HiGrade WP7 couplers Coupler production XFEL Coupler cryomodule integration LAL ILC HiGrade coupler  Process ILC HiGrade experiment ??? Location ??? ? ?

Mickaël LACROIX (LAL)ILC-HiGrade Scientific and Annual Meeting 8 IN2P3 Les deux infinis ILC HiGrade WP7 couplers Subcontractor Manufacturing and cleaning First step  Subcontractor status  Contract signed with Thalès RI on July 2010 with the following previous spliting:  640 XFEL couplers  30 ILC Higrade couplers  3 x cryomodules ???  6 x spares or ….???  Deliveries:  4 couplers expected by end of Feb 2011  20 couplers expected by end of May 2011  24 couplers expected by end of July 2011  …  Last 24 couplers expected by end of July 2013 Coupler production

Mickaël LACROIX (LAL)ILC-HiGrade Scientific and Annual Meeting 9 IN2P3 Les deux infinis Hall ISO 7 (cl ) ISO 5 (cl. 100) Storage2 2 Unpacking (box)3 3 Unpacking (bag) 4 4 In situ baking 5 5 Conditioning 8 8 Ionic pumping 6 6 Antenna adjustment 7 7 Packaging 1010 Dismounting 9 9 Storage Expedition Reception1 1 ILC HiGrade WP7 couplers E. Genesseau et al LAL RF Conditioning Second step Coupler production  LAL status  Production layout

Mickaël LACROIX (LAL)ILC-HiGrade Scientific and Annual Meeting 10 IN2P3 Les deux infinis Station ready by January  End of march 2011 ILC HiGrade WP7 couplers LAL RF Conditioning Second step Coupler production status  LAL status  Current situation of the infrastructure

Mickaël LACROIX (LAL)ILC-HiGrade Scientific and Annual Meeting 11 IN2P3 Les deux infinis ILC HiGrade WP7 couplers Schedule

Mickaël LACROIX (LAL)ILC-HiGrade Scientific and Annual Meeting 12 IN2P3 Les deux infinis ILC HiGrade WP7 couplers ILC HiGrade cost  Global cost of ILC HiGrade couplers:  Manufacturing cost (Thalès RI)  30 x XFEL coupler manufacturing = 30 x = €  Conditioning cost (LAL)  30 x coupler conditioning = 30 x ? = ? €  Tooling for delivery  15 x 5000 = € (if the delivery is done before the end of XFEL production) Tooling ~ 5000€ per pair

Mickaël LACROIX (LAL)ILC-HiGrade Scientific and Annual Meeting 13 IN2P3 Les deux infinis ILC HiGrade WP7 couplers Questions & Conclusion  Does anybody need couplers in ILC Higrade project? CHECHIA? CryHoLab? …?  If it is the case, we would like to know :  Location  schedule  Packaging of delivery  If it is not the case, could we use them like :  Ordinary XFEL couplers mounted on cryomodule?  XFEL coupler spares ?  Or any LAL R&D ?  All of that will define the ILC Higrade coupler :  Delivery schedule  Payment schedule  budget needed for 2011

Mickaël LACROIX (LAL)ILC-HiGrade Scientific and Annual Meeting 14 IN2P3 Les deux infinis

Mickaël LACROIX (LAL)ILC-HiGrade Scientific and Annual Meeting 15 IN2P3 Les deux infinis ILC HiGrade WP7 couplers Schedule