Quality Control QC is taken very serious QC Document for Tube Production QC Document for Module Assembly QC Document for Installation.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
Sputter Stand Safety Specifics Electrical Hazards High Voltage : Electrical power is required for the high voltage supply, gauging, system controller and.
Limited Streamer Tubes for the IFR Barrel Installation Review SLAC, Oct 21, 2003 Stewart Smith INFN: Ferrara, Frascati, Genova, Padova, Roma, Torino US:
OSU meeting, 04/24/2003 Richard Kass1 Limited Streamer Tube Project Overview Richard Kass Ohio State University Introduction (why, who, what….) The big.
IFR-LST status report G. Cibinetto INFN Ferrara Babar Collaboration Meeting, Feb. 21, 2004 Milestones LST production status 1 st module assembled Princeton.
Apr. 16, 2007 Undulator Breakout Dean R. Walters 1 Vacuum System Undulator Vacuum System Dean R. Walters Soon-Hong Lee, James Bailey, James.
Plan for MRPC Production Yongjie Sun Center of Particle Science and Technology University of Science and Technology of China.
May 4, 2004Bill Wisniewski1 Installation Review. May 4, 2004Bill Wisniewski2 Charge ( W. Althouse, G. Bowden, W. Innes(chair), J.Weisend, (D. Nelson))
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
BaBar/LST Meeting Dec 8, 2003K. Honscheid, Ohio State University Module Assembly Quality Control High Voltage Ohio State Status Report.
LST Storage and Testing at SLAC in the SLD Hall Available space Available Infrastructure Needed Infrastructure Time Line People Money Carsten Hast (SLAC)
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
RPC Cosmic Rays Test in Naples Paolo Iengo Atlas RPC Group Napoli ( M. Alviggi, V. Canale, M. Caprio, G. Carlino,R. de Asmundis, M. Della Pietra, D. della.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Electrical PP1 Basic features Electrical.
CERN Rui de OliveiraTS-DEM TS-DEM Development of Electronic Modules Rui de Oliveira CERN CERN hybrid production experience (or how to stay out of trouble)
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
The LST High Voltage System LST Readiness Review May 5, 2004 Klaus Honscheid Ohio State University.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
Bakelite surface vs Gap production Evaluation of First samples sent back from Korea Tests and QC of panels presently in GT Evaluation of second set of.
RPC Upscope : An overview with Indian perspective L. M. Pant Nuclear Physics Division Bhabha Atomic Research Centre L. M. Pant India-CMS Meeting, BARC.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
Nov. 8, 2001M. Garcia-Sciveres -- PP0 & Service Panels1 PP0 & Service Panels 1.Introduction 2.Technical Status 3.Goals for 2002.
RPCs of BESIII Muon Identifier  BESIII and muon identifier  R&D  Mass production  Installation Zhang Qingmin Advisor: Zhang Jiawen.
Gap Production for Upscope of the Endcap RPCs Sung Keun Park Korea Detector Laboratory Korea University February 5, 2010 Workshop on the Forward CMS RPC.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: EM Mini-Tower Robert Johnson.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
14-Dec-15S.Movchan Straw manufacturing and QC1 Straw manufacturing procedure and QC tape and straw parameters specification conditions of straw production:
Wolfgang Menges, Queen Mary The BaBar Muon System Upgrade Wolfgang Menges Queen Mary, University of London On behalf of the BaBar LST Group.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
IPC In-Circuit Test Fixtures In-circuit test fixtures are commonly called bed-of-nails fixtures. A bed-of- nails fixture is a device with.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
THEMIS Instrument PDR 1 UCB, April 19-20, 2004 Spin Plane and Axial Boom Preamps & Sensor Cable Fabrication Critical Design Review Daniel Schickele University.
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
Single Module Tests (electrical) Inspect connectors and cables for visible damage C-measurement: make sure all pads are correctly connected HV test (1.5.
Proposal for LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
Executive Committee, Toronto August 3, 2005 TRT Barrel WBS 1.2/3.2 Harold Ogren Indiana University.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
1 R&D status report of LST technology (2) Changguo Lu Princeton University BaBar IFR Workshop SLAC, December 8, 2002.
Concept Design for LBNF Far detector (LAr single phase)
LSTs in the IFR gaps Workshop on IFR replacement SLAC November 14, 2002 L. Piemontese INFN Ferrara.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
SeaPerch Electrical System. Electrical System Overview Assemble the control box. Make the Cat5 connector. Wire the motors to the tether. Wire the control.
Single Phase ProtoDUNE TPC QA/QC Plans The SP TPC Team Jan. 13, 2016.
Failure Mode: CPA. Surface Finish ProblemQA (Design)QC (Production) CPA edge tube surface scratches Shipping/handling procedures Visual inspection HV.
Single Phase ProtoDUNE TPC CERN The SP TPC Team Jan. 13, 2016.
TOTEM CSC construction and Quality Control Status report A.Krivshich Petersburg Nuclear Physics Institute March 07, 2006 CERN.
Test Tube Activities at Ohio State (7/29/03) Amphenol/Spectra Strip will send two 10 m long samples of signal cable –With a (round) jacket, shielding –20.
LHCb PRR - Girish D. Patel1 QC and Process Control G. D. Patel.
SeaPerch Electrical System
HF Test station at P5 A.Mestvirishvili.
Mini-Tower test results
Some proposals on HV circuits realization for segmented straw detector
BaBar IFR Upgrade Mark Convery SLAC 7 Jun 06.
Component Tracking Use computer based tracking system
ATLAS Wire Tension Measurement system
Han Jifeng BESIII MUON GROUP IHEP, CAS
Limited Streamer Tubes
Study on 9x9 standard single cell prototypes in Ferrara
(On Behalf of CMS Muon Group)
Undulator System Components Status Dean Walters
Limited Streamer Tube Project Summary
SeaPerch Electrical System
SC1R Cold Box PDR Assembly Sequence
Presentation transcript:

Quality Control QC is taken very serious QC Document for Tube Production QC Document for Module Assembly QC Document for Installation

Graphite Coating Visual Resistivity (sides, bottom) Detailed records Wires Visual Test sample of every spool Capacitance Resistance/Connectivity Tubes Leak test Burn-In Plateau Long term stability (30 days) Wireholder Position PC Board Visual Connectivity Cold solder joints

QC at Pol. Hi. Tech Profiles, Paint, Wire, Wire-holder, End-caps, PC boards Sleeves All components pass visual inspection All components within mechanical tolerances No defects in coating Surface resistivity within specs No bad solder connections on PC board Pass leak test (<1 small bubble/min) Pass wire test (weigh wire segment of each spool) Pass wire tension test/capacitance within specs Pass electrical conditioning test >400 V plateau in binary gas Pass 30 day test Tube accepted and sent to US

QC at Princeton and Ohio State Tubes Ribs Phi - Strips Inspection of shipping box/transport damage Tube resistance and capacitance within specs Pass burn-in/conditioning test for 7 days Good signal shape >300V plateau with ternary gas Counting rate on plateau within expectations A sample of tubes pass efficiency test Pass scan test Phi strips pass conductivity test and visual inspection Module passes 7 day burn-in test Module accepted and sent to SLAC

QC at SLAC Modules z – Strips Electronics HV, cables Inspection of shipping box/transport damage Tube resistance and capacitance within specs Pass burn-in/conditioning test for nn days -> Action Item: Define QC procedures at SLAC Can we create a preliminary list today? Module installed

Full System Test at SLAC It would be very valuable to have a complete system up and running at SLAC before we install the first modules into BaBar This should include Cosmic ray trigger Several modules with z- strips (Production) HV system (Production) Front-end electronics BaBar DAQ Should we encourage somebody to look into this?