STATE OF CALIFORNIA Green Schools in a Red Economy Pacific Energy Center September 21, 2010 Presented by the Office of Public School Construction (OPSC)

Slides:



Advertisements
Similar presentations
1 Charter Schools - Site and Plan Approval School Facilities Planning Division Liese Olukoya, Consultant.
Advertisements

Catholic School Councils A summary of 19 page document listed on school website.
March 7, 2001 Air Resources Board - Rice Straw Supply Workshop1 RICE STRAW SUPPLY Recommendations for Ensuring the Consistency and Predictability in the.
Commission on Teacher Credentialing Inspire, Educate, and Protect the Students of California Administrative Services Credentials 2012 CCAC Conference Teri.
West Contra Costa Unified School District Facilities Subcommittee Meeting March 11, 2014 State School Facility Program Seismic Funding Update.
School Facility Program Update County School Facilities Consortium September 25, 2012 Presenters: Lisa Silverman, Executive Officer Rick Asbell, Chief.
JOINT LEGISLATIVE AUDIT COMMITTEE HEARING SENATE BUDGET and FISCAL REVIEW COMMITTEE Delivering Energy Savings for California AMERICAN RECOVERY & Karen.
Public Interest Energy Research –Natural Gas Program Status Presentation to Air Emissions Advisory Committee May 12, 2005 Philip Misemer California Energy.
Cost-Effectiveness and Solar Water Heating. 2 Why is it important to discuss cost- effectiveness (C-E) of SWH? C-E is a metric by which the CPUC will.
March, What does the new law require?  20% State student growth data (increases to 25% upon implementation of value0added growth model)  20%
1 Enhancing the Role of Renewable Energy in California Robert A. Laurie Commissioner California Energy Commission Geothermal Resources Council Annual Meeting.
Catherine Elvert City of Palo Alto Utilities Communications Manager.
Legislative Analyst’s Office Presented to: Ryan Woolsey, Fiscal and Policy Analyst CSDA/CWDA Policy Symposium March 4, 2015.
1 Ohio School Facilities Commission Green Schools Initiative Presentation #2.
NEIGHBORHOOD ASSISTANCE PROGRAM APPLICATION WORKSHOP FISCAL YEAR
FY 16 INCENTIVE GRANT PROJECT Local Review Team Training Dr. Allison Touchstone, Assistant Professor Department of Ag Education/4H Youth Development, U.
How Do You Write the Next Generation Climate Action Plan?
March 28, What does the new law require?  20% State student growth data (increases to 25% upon implementation of value0added growth model)  20%
Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 COMMISSIONING ??? COMMISSIONING 101.
California Department of Education Pre-State Allocation Board Meeting May 25, 2011 Presented By.
Community Development & Planning Grant Pre-Application Meeting April 17,
1 Southern California Water Dialogue April 23, 2008 Jon Costantino Climate Change Planning Manager California Air Resources Board AB 32 California Global.
State Agencies’ Joint Workshop
1 every student. every classroom. every day. Building a Sustainable School District Jody London, President, Board of Education October 28, 2011 Council.
High Performance Building Standard Regulations An Introduction.
2008 New York - Member Forum Council for Responsible Jewellery Practices, Ltd. Overview of CRJP.
An Introduction to. Washington Green Schools Is a voluntary, statewide, web-based program your school can use to: –Reduce its environmental and carbon.
DSA 101 July 2010 Plan Approval Process for the Career Technical Education Facilities Program (CTE)
Federal Financial Participation (FFP) Overview Office of Family Planning Teen Pregnancy Prevention Program.
Resource Allocation & School Planning Councils in Your District Presenter: Sterling Olson.
West Contra Costa USD Facilities Sub Committee June 12, 2012 Peres Elementary School School Facility Program Funding Update.
The Overcrowding Relief Grant (ORG) The State Allocation Board & The Office of Public School Construction Presented by Lina Lyda.
1 How to Apply for School Facilities Funding Modernization Eligibility & Funding Overview.
CAREER TECHNICAL EDUCATION FACILITIES PROGRAM Cycle 2 Conversions.
1 Review of CPUC Role with the Public Interest Energy Research (PIER) Program on Natural Gas Briefing for California Senate Energy, Utilities and Communications.
EDUCATION MARKET. Consumers The U.S. equals 3% of the earth’s population. The U.S. consumes 40% of the earth’s energy. The U.S. draws 340 billion gallons.
How to Apply for School Facilities Funding New Construction Eligibility & Funding Overview.
On Site Review Process Office of Field Services.
California Integrated Waste Management Board 1 Consideration Of Applicant Eligibility, Project Eligibility & Evaluation Process for the Tire-Derived Product.
California Public Utilities Commission CPUC Climate Change Activities Paul Clanon Executive Director August 28, 2007 Presentation to the Senate Energy,
CPUC Public Agenda 3261 Thursday, September 23, 2010, 10:00 a.m. 505 Van Ness Ave, San Francisco Commissioners: Michael R. Peevey Dian M. Grueneich John.
West Contra Costa Unified School District Facilities Subcommittee Meeting December 2, 2014 State School Facility Program Seismic Funding Update.
INVESTMENT IN MENTAL HEALTH WELLNESS GRANT PROGRAM INVESTMENT IN MENTAL HEALTH WELLNESS GRANT PROGRAM CALIFORNIA HEALTH FACILITIES FINANCING AUTHORITY.
Energy Project M&V: Reports that Add Value October 27, 2015.
Consideration of the Scoring Criteria and Evaluation Process For The Used Oil Opportunity Grant (OG) Program (8 th Cycle) FY 2005/2006.
Facilities Interview Cindy McDaniel DSUSD Assistant Superintendent Business Services Maria E. Haigh Lupe Valdivia Marissa Fulache.
Energy Efficiency Forum State of California/Investor Owned Utility Partnership Program Date: September 27, Partnership. A Unique Opportunity.
Request for Proposals: Energy Conservation Projects December 17, 2015.
S T A T E O F C A L I F O R N I A. Expediting the Application Review Process Building Schools — Putting Californians to Work.
Pre-State Allocation Board Meeting October 26, 2011 Presented By California Department of Education.
State Allocation Board Meeting December 15, 2010 Presented By.
California Integrated Waste Management Board 1 Update And Request For Direction On The Determination Of The Co- Mingled Recycling Rate For The At-Store.
High Performance Building Standard Regulations. Topics Covered Today What are they? What projects do they apply to? How does it affect a project?
Data Center Energy Use, Metrics and Rating Systems Steve Greenberg Energy Management Engineer Environmental Energy Technologies Division Lawrence Berkeley.
TEACHER EVALUATION TEACHER TENURE TEACHER MENTORING New Educational Laws and What They Mean for Us.
ITEM 6.a AT GREEN BUILDING ORDINANCE City Council – August 25, 2009.
MAPA Wednesday Webinar Everything you always wanted to know about LEED* *but were afraid to ask.
1 EASTERN MUNICIPAL WATER DISTRICT Water Use Efficiency Master Plan Elizabeth Lovsted, PE Senior Civil Engineer January 16, 2016.
State Allocation Board Meeting November 3, 2010 Presented By.
Butte County Climate Action Plan Contract for Services December 11, 2012 Butte County Department of Development Services Tim Snellings, Director.
California Department of Education
Key Factors for Clubs in doing both Club and Global Grants
Efficiency in the Lifecycle of Affordable Housing
City-wide LED Street Light Conversion Program
REEF SUNSET UNIFIED SCHOOL DISTRICT
Save While You Save Greening Schools through Performance Contracting
WI Act 185 Implementation Update
Chancellor’s Office Update
Presented by: Susan K. Burr Executive Director
Statewide Green Lodging Contract
Presentation transcript:

STATE OF CALIFORNIA Green Schools in a Red Economy Pacific Energy Center September 21, 2010 Presented by the Office of Public School Construction (OPSC)

Proposition 1D: High Performance Funding Presented by: Brian LaPask Project Management Supervisor

Major functions:  Verify that all applicant school districts meet specific criteria based on the type meet specific criteria based on the type of funding which is being requested. of funding which is being requested.  Prepare recommendations for the SAB's review and approval. review and approval.  Prepare regulations, policies and procedures which carry out the mandates of the SAB.  Prepare agendas for the SAB meetings. What is the Office of Public School Construction? The Office of Public School Construction, as staff to the State Allocation Board, implements and administers the School Facility Program and other programs of the State Allocation Board.

Assembly Bill (AB) 127 Set aside $100 million in incentive grants to promote the use of high performance attributes in new construction and modernization projects for K-12 schools. High performance attributes include: Set aside $100 million in incentive grants to promote the use of high performance attributes in new construction and modernization projects for K-12 schools. High performance attributes include: Using designs and materials that promote energy and water efficiency. Using designs and materials that promote energy and water efficiency. Maximizing the use of natural lighting. Maximizing the use of natural lighting. Improving indoor air quality. Improving indoor air quality. Utilizing recycled materials and materials that emit a minimum of toxic substances. Utilizing recycled materials and materials that emit a minimum of toxic substances. Employing acoustics that are conducive to teaching and learning. Employing acoustics that are conducive to teaching and learning.

High Performance Rating Criteria The High Performance Rating Criteria (HPRC) is currently modeled after the 2006 Collaborative for High Performance Schools (CHPS) Criteria, with updates pending to incorporate the 2009 CA- CHPS Criteria. The High Performance Rating Criteria (HPRC) is currently modeled after the 2006 Collaborative for High Performance Schools (CHPS) Criteria, with updates pending to incorporate the 2009 CA- CHPS Criteria. The five categories used for the HPRC are: The five categories used for the HPRC are:  Site  Water  Energy  Materials  Indoor Environmental Quality

High Performance Rating Criteria The DSA oversees the review of plan designs. The DSA oversees the review of plan designs. Upon verification of the high performance credits by the DSA High Performance School Team, the District will be provided a signed Form HPI-1. Upon verification of the high performance credits by the DSA High Performance School Team, the District will be provided a signed Form HPI-1. The District must submit this form to the OPSC with their funding application. The District must submit this form to the OPSC with their funding application. The increase to the base grant will be determined by the number of credits the project receives multiplied by a percentage factor which will ultimately provide an increase ranging from two to just over ten percent. The increase to the base grant will be determined by the number of credits the project receives multiplied by a percentage factor which will ultimately provide an increase ranging from two to just over ten percent.

Regulation Changes, May 2010 Approved by State Allocation Board in May 2010, but not active yet. Office of Administrative Law approval expected this year. Introduction of the new “High Performance Base Incentive Grant” (HPBIG). HPBIG provides $150,000 for new school projects that meet minimum point threshold. Also provides $250,000 for new construction addition and modernization projects meeting minimum point threshold. Only one HPBIG per school site is allowed.

Regulation Changes, May 2010 Updated to incorporate 2008 Energy Code. Data collection – SAB interested in collecting data on cost differentials between standard and high performing systems. Board Resolutions – updated Application for Funding (Form SAB 50-04) to require school districts to have school board resolutions supporting HPI request and intent to continue to pursue and build high performing/green schools.

Regulation Changes, May 2010 Rating Criteria points are worth more, percentages have been increased. Addition of 16 additional credits in HPRC. –Two additional credits in Water category. –Eleven additional credits in Energy category, (eight of which are for renewable energy produced on site.) –Three additional credits in Indoor Environmental Quality category.

HPI Funding for New Construction Projects Must meet all prerequisites in all HPRC categories; then, the district may select the credits they wish to pursue. Must meet all prerequisites in all HPRC categories; then, the district may select the credits they wish to pursue. Projects must meet the minimum point threshold of 27 points to qualify for the grants. Projects must meet the minimum point threshold of 27 points to qualify for the grants.

New Construction Funding Calculation Example (current) Scenario – New Construction project for a 1000 pupil elementary school designed to the 2006 criteria with 41points achieved and verified by DSA. Base grant: $8,738 x 1,000 pupils = $8,738, points = 4.0 percent increase Therefore; $8,839 x 1,000 x 4.0% = $349,520 $8,839 x 1,000 x 4.0% = $349,520

New Construction Funding Calculation Example (future) Scenario – New Construction project for a 1000 pupil elementary school designed to the 2009 criteria with 41 points achieved and verified by DSA. Base grant: $8,738 x 1,000 pupils = $8,738, points = 6.52% percent increase Therefore; $8,738 x 1,000 x 6.52% = $569,718; plus, $8,738 x 1,000 x 6.52% = $569,718; plus, $150,000 (Base Incentive Grant) = $719,718 an increase of $150,000 (Base Incentive Grant) = $719,718 an increase of $370,198, or more than double the previous amount. $370,198, or more than double the previous amount.

HPI Funding for Additions to a Site and Modernization Projects Must meet all prerequisites that are within the scope of the project; then, the district may select the credits they wish to pursue. Must meet all prerequisites that are within the scope of the project; then, the district may select the credits they wish to pursue. Projects must meet the minimum point threshold of 20 points to qualify for the grants. Projects must meet the minimum point threshold of 20 points to qualify for the grants.

Modernization Funding Calculation Example (current) Scenario – Modernization project for a 500 pupil elementary school designed to the 2006 criteria with 41 points achieved and verified by DSA. Base grant: $3,328 x 500 pupils = $1,664, points = 4.0 percent increase Therefore; $3,328 x 500 x 4.0% = $66,560 $3,328 x 500 x 4.0% = $66,560

Modernization Funding Calculation Example (future) Scenario – Modernization project for a 500 pupil elementary school designed to the 2009 criteria with 41 points achieved and verified by DSA. Base grant: $3,328 x 500 pupils = $1,664, points = 6.52% percent increase Therefore; $3.328 x 500 x 6.52% = $108,493; plus, $3.328 x 500 x 6.52% = $108,493; plus, $250,000 (Base Incentive Grant) = $358,493 an increase of $250,000 (Base Incentive Grant) = $358,493 an increase of $291,933, or more than four times the previous amount. $291,933, or more than four times the previous amount.

Funding Summary 121 applications have been approved (77 unfunded approvals) through August 25, 2010 SAB 121 applications have been approved (77 unfunded approvals) through August 25, 2010 SAB Average points: 34.5 (~2.5% increase to base grant) Average points: 34.5 (~2.5% increase to base grant) ~$24.7M has been allocated ($13.4M in unfunded approvals) ~$24.7M has been allocated ($13.4M in unfunded approvals) ~ $75.3M still available ~ $75.3M still available

Contact Information Brian LaPask, Supervisor (916) Tim Hegedus, Program Analyst (916)

Website Resources  OPSC Website   California Energy Commission Website  DSA Website  DSA Website Link to Energy Regulations  Collaborative for High Performance Schools

Questions