Status report from KEK Feb. 26, 2010 T. Higo, S. Matsumoto T. Takatomi, Y. Higashi and X-band group.

Slides:



Advertisements
Similar presentations
5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program. May 2011 Review of waveguide components development for CLIC I. Syratchev,
Advertisements

CERN-KEK X-band collaboration 3 Dec T. Higo on behalf of X-band group of KEK.
Status and plan for X-band high field experiments at KEK US High Gradient Collaboration Workshop University of Maryland Jan , 2008 KEK T. Higo.
Structure testing and RF tests stands Jan Kovermann CERN On behalf of the CLIC structure test team.
Report from KEK High gradient study results from Nextef (+ other related activities) LCWS2011, Granada Sep. 27, 2011 T. Higo.
Status of KEK production July 11, 2008 at SLAC KEK T. Higo et al., Accelerator div. T. Takatomi et al., Mech. Eng. Center.
High gradient features from Nextef on recent CLIC prototype structures US-HG workshop, SLAC 9 February 2011 T. Higo representing X-band group of KEK.
Report from Nextef IWLC10, Genève, Oct. 20 T. Higo (KEK)
Working Group 1: Microwave Acceleration Summary 10 July 2009.
High-gradient Experiments with Narrow Waveguides Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Noboru Kudo, Shuji Matsumoto, Shigeki Fukuda, Mitsuo Akemoto,
CLIC Kickers: Status and activities for 2013 in view of the budget discussions for 2013 CTC #65 M.J. Barnes CLIC Technical Committee, November M.J.
Walter Wuensch CLIC project meeting, 31 March 2015 Accelerating structure program: design and testing.
W. Wuensch, rf development meeting Considerations on running normal conducting cavities cold.
Results from Nextef Observations in high gradient tests of CLIC Prototype Structures and associated study activities CLIC2013, CERN 29 January, 2013 T.
Accelerating structure test results and what’s next Walter Wuensch CTF3 collaboration meeting
R&D status and future strategy in KEK X-band area May 16, 2011 T. Higo (KEK)
Update of KEK X-band Research Activity March 3, 2009 Shuji Matsumoto Accelerator Laboratory, KEK 2009/3/31US High Gradient Workshop.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
日米協力 US/Japan cooperation Research of High Gradient Acceleration Technology for Future Accelerators progress report New proposal 7.
Statistical analysis of RF conditioning and breakdowns Jorge GINER NAVARRO CLIC Workshop /01/2015 J. Giner Navarro - CLIC WS20151.
ASTA roadmap to EPICS and other upgrades Remote monitoring and control DAQ Machine protection Dark current energy spectrometer.
Status of X-Band PPM Klystron R&D for JLC KEK Yong Ho Chin ISG9 KEK December 10-13, 2002.
X-band high gradient activities at KEK May 13-15, nd Collaboration meeting on X-band Accelerator Structure Design and Test Program T. Higo, KEK.
Engineering perspectives on quadrants (1/2) Experience on our first quad (Higo) (2/2) Perspective on quad (Higashi) CLIC09, Oct T. Higo (KEK)
X-Band: test stand and structure program
Recent High-gradient test result at KEK Linear Collider Workshop 2012 Arlington, Texas (WebEx) 25 October, 2012 Toshi Higo and X-band group of KEK.
Performance of CLIC prototype accelerator structures tested at Nextef CLIC February 2014 Toshiyasu Higo (KEK)
The status of RF components on Maria Filippova, RF components: Loads Phase shifters Attenuators Hybrids Splitters Directional couplers.
常伝導技術での LC の可能性 LC feasibility consideration with normal conducting technology 第5回「機構の研究推進について」の意見交 換会 (ILC の推進について ) 平成 24 年 2 月 13 日 加速器・肥後寿泰.
Recent high-gradient results, rf testing, places and plans Steffen Döbert, CLIC Workshop, Test facilities High gradient results Future testing.
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
A Study of RF breakdown of Narrow Wave Guide Shuji Matsumoto Kazue Yokoyama Toshi Higo Accelerator Lab., KEK 2016/1/41SLAC Workshop 8-10 July 2009.
KEK workshopWalter Wuensch18 April 2012 Status and objectives of the CLIC X-band and high- gradient activity.
MICE RF Cavity Measurements Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory July 8, 2010 Rutherford Appleton Laboratory, UK.
12 GHz Stand alone power source at CERN G.McMonagle AB/RF.
High gradient study at KEK CLIC08, Oct , 2008 T. Higo.
PETS TESTING ANALYSIS 4 th X-band Structure Collaboration Meeting 3 rd May 2010 Alessandro Cappelletti for CLIC collaboration.
HL-LHC Crab Cavity Review Debriefing Comments from LARP June 30, 2014.
Progress of X-Band Accelerating Structures LINAC10, Tsukuba 17 Sep T. Higo (KEK)
Nextef results CLIC09, Oct T. Higo (KEK). Contents Quadrant high gradient test status – Initial processing and power limit – VAC characteristics.
TD18 High Power Test Results Faya Wang Chris Adolphsen May 3, 2010.
W. Wuensch CLIC project meeting High-power rf structure testing.
Status of high gradient experiments at Nextef Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Shuji Matsumoto, Shigeki Fukuda Accelerator Laboratory, KEK.
Title 2 nd X-band Accelerator Structure Design and Test-Program Collaboration Meeting Discussion with WebEx on March 17 between CERN and KEK W. Wuensch,
Nextef results & status International Workshop on Breakdown Science and High Gradient Technology KEK, Japan 18 April 2012 Toshi Higo.
Cell to cell alignment on GLC structures 24 Nov. 2014, CERN Toshi Higo (KEK) 2014/11/23CLIC Structure Review1.
Review of the rf working group of the ICFA Mini Workshop on Novel Accelerators and Colliders which was associated with the Bob Siemann Memorial Symposium.
Detail plan of S1-Global H. Hayano (KEK),
Narrow waveguide experiments Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Noboru Kudo, Shuji Matsumoto, Shigeki Fukuda, Mitsuo Akemoto, Mitsuhiro Yoshida,
Discussion on critical issues for testing: breakdown identification, preparation for test, processing protocol, etc. 4 th Annual X-band Structure Collaboration.
Some information from Nextef For poster session in IWLC T. Higo.
Update on PETS experiments (Igor for the CLIC collaboration)
Nextef status and expansion plans Shuji Matsumoto for KEK Nextef Group /5/51 4th X-band Structure Collaboration Meeting, CERN.
The status of RF components G. Riddone, M. Filippova RF development meeting on
KEK test area plans Shuji Matsumoto Accelerator Lab., KEK.
ILC R&D Board Meeting: SRF Cavities Status and Plans
Manipulating RF phase and amplitude at high power level.
Application of moderate (5 MW) X-band power sources for the CLIC accelerating structures testing program and other projects I. Syratchev, CERN.
Effort to identify the critical issues for high gradient
X-band and high-gradient development plans at Tsinghua University
Application of the moderate peak power (6 MW) X-band klystron’s cluster for the CLIC accelerating structures testing program. I. Syratchev.
Shuji Matsumoto Accelerator Lab., KEK
Recent high-gradient testing results from the CLIC XBoxes
SLAC Production Status
A Study of RF breakdown of Narrow Wave Guide
Advanced Research Electron Accelerator Laboratory
T24 results and comparison to the preceding studies on CLIC prototype structures May 17, 2011 T. Higo (KEK)
5th X-Band Structure Collaboration Meeting
T18_VG2.4_Disk_#2 processing summary
Status of DESY-PSI-CERN collaboration on development of X-band TDS with variable polarisation: PolariX-TDS Alexej Grudiev on behalf of Polarix-TDS collaboration.
Presentation transcript:

Status report from KEK Feb. 26, 2010 T. Higo, S. Matsumoto T. Takatomi, Y. Higashi and X-band group

Contents Structure production – T24, TD24 Nextef – TD18_#2(KEK) run – Pulse compression related system expansion – KT-1 Quad #5 – Disassembly

Structure production (1) T24_Disk_#4(KEK) – All sent to SLAC on Feb. …….. TD24_Disk_#3(SLAC) & TD24_Disk_#4(KEK) – Flatness issue was solved – All parts being delivered to KEK by Feb. 22 – RF checking at KEK should be by 1 st week of March, followed by immediate shipping to SLAC Discussion of shipping – Proposed shipping from SLAC to KEK in vacuum – All parts needed for it were sent to SLAC for T24 shipping.

N 2 purged L valve (CF070) ACC Structure Properly sealed for shipping By CF070 blind Shipping configuration SLAC vac test N 2 purged L valve (CF070) ACC Structure Attach filter in clean room KEK cleanroom Go to Nextef N2N2 Pumping L valve (CF070) L valve(KF25) ACC Structure Filter Proposed shipping from SLAC to KEK

Quad #5 S ij was measured on Feb. 22. Relative movement among four rods were checked with FARO Fusion. Pipes and H-bend arms were removed. Relative movement among four rods were checked with CMM ZEISS. S ij will be measured on Feb. 26. Optical inspections will be made. Bead pull will be made soon. Disassembling will be in March. ………………

Alignment check of quad #5 after high power test Results With H-bend and cooling pipe FARO: reproducibility < Transverse: < Longitudinal : < After removing H-bends and cooling pipes CMM ZEISS: reproducibility ~micron Transverse: < Longitudinal : <

Nextef (1) TD18_Disk_#3(KEK) – Dark current has been continuously reducing. – Above ~80MV/m, most of breakdowns are associated with a reflection from left-side load assembly by several percent power. – Consistent to what Steffen speculated from the reflection pulse analysis. – Further processing will be done. Pulse compression related system expansion – All component drawing are done – Started fabrication for all, all machining will be done by end of March – Brazing will be ending in April~May, done in KEK – May start with single mode PC, 150ns compressed pulse, then to 300ns. KT1~Shield-B – Most of the key components, (bend, mode convertor, vac pumping port), are under fabrication in parallel to those for PC described above. Activities in new JFY – Should make a practical plan through discussion with CERN and SLAC

Nextef (2) KEK-load tested at KT-1 – Two KEK-made loads, called “Ohtsuka load” were tested up to klystron limit. Both worked well up to such as 40MW, 500ns and 55MW, 200ns. Operation of Nextef and KT-1 – We sacrificed KT-1 to stop for a few weeks due to shortage of the INV power supply. – We prioritize Nextef operation to continuously run it. Visitor from Tsinghua – May not come due to health problem. – System hard wares and softwares are still need to be developed.

Event with reflection from left-load arm near KLY ACC-Structure Load(L) arm Load(R) arm Triggered by reflection from downstream and accompanied by current burst into beam pipe F Rs Ra T

Eacc=sqrt[Pin(MW)/62.7(MW)]*100(MV/m)

Es=2.0*Eacc; slope= 6.53e3*phi^1.5/beta/Es(MV/m); Beta = 62751/1486=42.2  =42  =57  =72  =70

Deduction of the field enhancement factor  (Cu)=4.52eV Assuming Es/Eacc=2 actually T18_VG2.4_Disk Es/ ~2.62 max Fitting of modified F-N curve SLAC Workshop T.Higo Note that today’s (Shuji’s) beta value were deduced assuming Es/Ea=2, which makes beta larger than the formula here by 1.3. This reminds me necessity of considering the beta value deduction. (Higo)

Dark current evolution Dark current has been decreasing by two order of magnitude in these two months. Beta value has been steady decreasing from 70 to 40, assuming Es/Eacc=2. It seems interesting to check Es*beta etc. Note that the beta values shown till today on T18and Quad, are based on Es/Eacc=2.62.

X-band related budget for JFY2009 (Spare slide for US-Japan application for JFY201 on March 2) 2 March 2010 日米・継続・肥後 18 KEK Structure fabrication Infrastructure & Nextef CERN financially supports for Structure fabrication High power test System expansion SLAC conducts Structure fabrication High power test Basic research US-Japan 6.5M\ Used mostly for basic research fund CERN/KEK collaboration 31M\ KEK budget 16M\ CLIC US-HG Very big and essential contribution to KEK’s work!

Conclusion We continue TD18 high gradient processing with replacing left-arm load assembly. We restarted investigation of Quad #5. Most of essential components, both for PC-related and single-klystron-based systems, are under fabrication now. All parts for TD24 are now at KEK, preparing to ship to SLAC. We greatly appreciate the efforts from CERN and SLAC for our work. We will make a plan for next JFY soon and propose it to discuss among three laboratories to actually make our action plan.