Entering Our Choices into FPC ©2009 Dr B C Paul Note – This slide series contains screen shots of the computer program FPC developed by Caterpillar Equipment.

Slides:



Advertisements
Similar presentations
Capacity Planning ABI301.
Advertisements

Announcements You survived midterm 2! No Class / No Office hours Friday.
Welcome To Calculus (Do not be afraid, for I am with you) The slope of a tangent line By: Mr. Kretz.
How to download and install Sharpdesk
Exponential Functions Logarithmic Functions
Production Capacity of Truck and Loader Teams ©Dr. B. C. Paul 2003.
Front End Loader Costs ©Dr. B. C. Paul 2000 Start Detailed Economic Comparison of 3 machines l Strategy Go Through Each Machine and Figure the Cost Compare.
Handling Solution in a Heap Leach ©2009 Dr. B. C. Paul.
TRUCKS THE MOST COMMON HAULING EQUIPMENT USED FOR MILITARY CONSTRUCTION SITE ARE 2 1/2, 5, AND 20 TON DUMP TRUCKS. THE HAUL CAPACITY CAN BE EXPRESSED.
Matching An Excavator to Our Trucks ©2009 Dr. B. C. Paul Note – These Slides contain tables and information found in the Caterpillar Performance Handbook.
1 Confidence Interval for the Population Mean. 2 What a way to start a section of notes – but anyway. Imagine you are at the ground level in front of.
Pumps for Slurry © 2012 Dr. B. C. Paul Note – These slide illustrate a solution approach using Sysel, a program developed by GIW and contain screen shots.
Truck Fleet Costs ©Dr. B. C. Paul 2000 Revised 2008, 2009 Note – This presentation includes screen shots from the Caterpillar Performance Handbook, Catapillar’s.
Tire Heating – The TMPH Rating ©Dr. B. C. Paul 2000 revised 2008 Note- These slides demonstrate the use of the FPC computer program developed by the Caterpillar.
Mathematical Statistics Lecture Notes Chapter 8 – Sections
Adjusting a Mine Cost Service Model. A Note About MSOPIT Compatibility Mine Cost Service Expressed Mining Costs as Costs Per tonne of Ore Mined MSOPIT.
Checking for Traction Problems ©Dr. B. C. Paul 2000 revised 2008 Note – The methods outlined here are common practice in industry and can be found in.
Checking for Traction ©2009 Dr. B. C. Paul Note – These slides contain material from slides dating back to 2000 as well as information and screen shots.
Loading Considerations © 2000 Dr. B. C. Paul revisions 2009 Note These slides include screen shots from the Caterpillar Performance Manual Edition 29.
What a Student with Learning Difficulties Might Say Things to look for in your conversations with students. You can learn a lot about a student from the.
Checking for Tire Heating ©2009 Dr B C Paul Note – These slides contain material from slides dating back to 2000 and also contains screen shots from the.
Step 5 Truck Fleet Costs ©Dr. B. C. Paul 2000 Revised 2008 Note – This presentation includes screen shots from the Caterpillar Performance Handbook, Catapillar’s.
Proportions for the Binomial Distribution ©2005 Dr. B. C. Paul.
Entering My Haul Road Profile ©2009 Dr. B. C. Paul Note- This presentation draws on previous notes developed as early as 2000 and contains numerous screen.
Getting Cycle Times ©2009 Dr. B C Paul Note – These slides contain material from slides dating back to 2000 and also contains screen shots from the program.
Introduction to Arrays. definitions and things to consider… This presentation is designed to give a simple demonstration of array and object visualizations.
Detailed design – class design Domain Modeling SE-2030 Dr. Rob Hasker 1 Based on slides written by Dr. Mark L. Hornick Used with permission.
Obtaining Information From the Geologic Block Model
Developing Haulage Profiles (Part of Getting the Truck Cycle Time) ©Dr. B. C. Paul 2000 revised 2008 Note – The instructor prepared the basic steps and.
More switches, Comparison Day 7 Computer Programming through Robotics CPST 410 Summer 2009.
Surface Mining Ore Body Geometry ©2011 Dr. B. C. Paul Note- Concepts given here are considered to be common knowledge to those involved in early stage.
CREATING A TEST IN WORD 2007 Also creating and using equations in Word 2007 Jeff Klamm Tec 539.
Steps in Fleet Selection ©Dr. B. C. Paul 2000, revised 2008 Note- General steps and methodologies found in these slides roughly follow material found.
I’m not that dumb! Pick 4 ads from below. For each ad, choose one thing that the ad promises that is NOT true. Then write the truth. DELETE ALL OTHER SLIDES.
Problem Solving The Ralph Way :)  The following is a power point that has been designed to help you work through an alternative method to solving story.
Chapter 1: Driving the Road.  Measure reaction time using one of two different methods  Compare the different methods of measuring reaction time  Compare.
Compositing Assays To The Chosen Bench Height ©2007 Dr. B.C. Paul {Note – The Name MineSight® and the Program described are property of Mintec Inc – Tucson,
Matching Shovels ©Dr. B. C. Paul 2000 revised 2008 Note – Matching procedures depicted in these slides are widely understood among those schooled in the.
Class Introduction Surface Mining ©2007 revised 2011 Dr. Bradley C Paul.
Assignment #6 Stripping Ratios by Planimeter ©Dr. B. C. Paul Summer 2003.
Processing Lab 3 – Header issues and trace editing Bryce Hutchinson Objectives: Fixing elevation issues Define an LMO function Pick first breaks Kill traces.
Computer Aided Mine Design Part III Cut-Off/Equipment Interactions ©Dr. B. C. Paul 2000 ©Dr. B. C. Paul Summer 2003.
Next Part of Step II Determining Peak Speed ©Dr. B. C. Paul 2000 revised 2008 Note – The methods outlined here are typical of widely known published engineering.
How to sit an assessment. Enter the Assessment Number and click the ‘Load’ button.
Multigroup Models Byrne Chapter 7 Brown Chapter 7.
Step #1 Matching ©Dr. B. C. Paul 2000 revised 2008 Note many of the ideas expressed in these slides can be found in Surface Mining Manuals, the Book Surface.
Cable Shovel Costs ©Dr. B. C. Paul 2000 Do the Cable Shovel l Have a 12 yard P+H Examine Cable Shovel Cycle Time Chart Predicted 26 seconds.
Make a Great Map of Your Engineering Building Traverse ©Mar Dr. B. C. Paul Note – This presentation contains screen shots from the Mine Sight and.
Design of Belt Conveyors Step #3 Checking Out the Power ©2012 Dr. B. C. Paul Note – Material in these slides include screen shots from the program “Belt.
Feature Engineering Studio September 30, Quick Note Please me for appointments rather than just showing up at my office – I’m always glad.
Handling Multiple Loaders ©Dr. B. C. Paul 2000 Revised 2008 The Binomial Formula is widely published in works on statistics. These slides contain screen.
LPPS Middle School School Math Smartboard Group June 24, :00-3:00 Facilitated by Kevin Blount Holden School.
Entering Your Traverse Data In MineSight ©Feb 2009 Dr. B. C. Paul Note – the following presentation includes screen shots an operating suggestions for.
FPC Assignment 1. Go to Your Project and Fire-Up MSOPIT.
Quadratic Regression ©2005 Dr. B. C. Paul. Fitting Second Order Effects Can also use least square error formulation to fit an equation of the form Math.
Basics of Building a Truck and Loader Fleet ©Dr. B. C. Paul 2000, revised 2008,2009 Note- General steps and methodologies found in these slides roughly.
Pit Reserves and Resources in a GSM ©2012 Dr. B. C. Paul This presentation involves the program MineSight created by Mintec and contains screen shots taken.
A Heap Leach Plan. My Concept I’ll build one great big pad I’ll fill it in with rows of material about 40 feet high I’ll then fill in between the rows.
What is this? SE-2030 Dr. Mark L. Hornick 1. Same images with different levels of detail SE-2030 Dr. Mark L. Hornick 2.
Obtaining Moving Cycle Times ©Dr. B. C. Paul 2000 revised 2008 Note – The methods shown in these slides are adapted to use FPC, a program produced by.
ACT Reading Test Strategies for Success. Strategies ● Use the time allotted ● Pace yourself ● Read each question carefully (slow down for that) ● Look.
Checking On Production ©2009 Dr. B. C. Paul Note – These slides contain material from slides dating back to 2000 and also contains screen shots from the.
Getting Organised Part 2
California Invention Convention
Naviance: Do What You Are Personality Survey
How Children Learn.
Getting Organised Part 2
Linear Systems.
Chapter 3 Material Handling Equipment
Educational Applications of Technology By: Samantha Evans
Presentation transcript:

Entering Our Choices into FPC ©2009 Dr B C Paul Note – This slide series contains screen shots of the computer program FPC developed by Caterpillar Equipment Company

Start with our Semi- Initialized Project Tab Screen

Click on the Fleet Input Tab

We Enter a Name and Description for Each Fleet

Make Our Entry for the First Fleet

Click on Add Hauler to Bring Up the Hauler Screen

We Pick Cat Standard Machines and Trucks Caterpillar has all the Data on their own Machines and P+H Shovels in the program (If you want something Else you have to enter Your own data)

Up Comes a List of Machines Scroll down and click on The 775

When Selected the Truck Turns Red Now click OK

The Basic Truck Info Appears Now Click on Select Loader

Pick Cat Standard Machines and Hydraulic Excavator

Scroll Down and Select the 5230 ME Note that the program Considers both the Current B model and The earlier 5230 model (good for used Equipment Consideration) Also note that FS means The machine has a Front shovel

The Fleet is In We do need a Couple details -Availability and -Number of units

Availability l In a perfect world machinery never breaks down – then there is our world New equipment with maintenance contracts can hit 90 to 95% Mid age more typical equipment is about 80% Old equipment held together with bailing wire is about 60-75% l I’m going to go with 80%

Enter My Info

The Default Number of Units is 1 l Some how I don’t think I can move 70,000,000 tons of material with one Cat 775 l Lets do an estimate for a realistic number of units to guess The Cat program will help us refine it.

First Question – How Much Can I get out of one truck in a year? l Cat 775 is Volume limited with 54.3 cubic yards at 2107 lbs/cubic yard 57.2 tons of rock (a short ton is 2000 lbs) l A trip is 34,000 ft round Distance (ft)/ (MPH*88) = time in minutes Guess a 15 mph average 34,000/(15*88) = minutes About 2 trips per hour

My Continued Estimate l 2772 hours per year (calculated earlier – see slide set #1) l At 2 trips an hour that’s 5,544 trips l At 80% availability we will only get 80% of that or 4,435 trips l At 57.2 tons per trip that is 253,693 tons/year

Ongoing Estimation l About 250,000 tons per truck with 70,000,000 tons to move 280 trucks (Now I know why I wanted big ones)

Next Question – How Many Loaders to Go with that? l A Truck trip is about 30 minutes l If it takes about 3 minutes to load (common blind guess for load times) l One loader can handle 10 trucks so I need about 28 loaders

Enter the Information

A Note on Guessing l The Design process is not just solving a set of text book equations There are a lot of equations that must be true for a successful design but you have to have an idea of what you want to do before you can check it l Note the first thing we did was to take a look at what was wanted and then we used our knowledge of equipment to pick units that could work for the job

What We Did Next l We then used rough equations and down right guesses to try to get realistic equipment combinations. l Does the fact that we guessed mean it will work? Ya – and what planet did you come from? l No – we will usually find later equations not satisfied and we will use that information to come back and make changes till we converge to an answer.

More Comments on Design l Will everyone come up with the same design? No, but they should all have the ability to work l Will everyone make the same guesses as they go along No, and that will make some designs converge faster than others l Does it mean your dumb if you guess wrong? No, it means your dumb if you sit there and do nothing Design is a calculated and planned system of trial and error

That Was So Much Fun We Just Have to Do it for the Other Fleets Click on Add New Fleet

This is looking kind of familiar

When I’m Done Entering I Can Pull Up Any Fleet for Examination