Commissioning Schedule and Shifts – First Call E906 Collaboration Meeting 23 February 2010.

Slides:



Advertisements
Similar presentations
T1 status and plans INFN Genova November 2014 Collaboration Meeting.
Advertisements

Richard Soluk – University of Alberta. The LHCb VELO Region R. Soluk --- University of Alberta --- MoEDAL Collaboration Meeting --- CERN June
EDIT-2012 Detector School at Fermilab First school at CERN was a response to a strong need, as shown in ICFA survey Big success, with 88 students participating.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
F ERMILAB T EST B EAM F ACILITY Aria Soha March 17, 2011.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
Report on E-165 Steve Schnetzer MCC Meeting June 28.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 12, 2010.
Tagging spectrometer and photon beamline Review January 23-24, Response to Questions Bremsstrahlung Tagging Spectrometer and Photon Beam Review.
E166 Collaboration J.C. Sheppard SLAC, October, 2003 E166 Background Test Beamtime Request J. C. Sheppard.
19 March 2012Muon Week - Operations1 Muon Week Muon Operations Session Introduction Status and LHC Schedule Detector Readiness + Preparation for Physics.
Types of Analyses Single Collector –Uses only one collector or detector –This is the case with a Daly or EM Advantages: –Need only one detector –Peaks.
SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015.
MICE Video meeting Alain Blondel 7 December MICE -- what running strategy? reflections on steps I and II.
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
Recirculation Concept - Cyclotron Radio frequency alternating voltage Hollow metal drift tubes time t =0 time t =½ RF period D-shaped.
Jon S Kapustinsky 11/17/2010 Jon S Kapustinsky FVTX Commissioning Plan 1.71 Jon S Kapustinsky 1.
Physics Program and Runs: Autumn 2011 & Step IV V. Blackmore MICE Project Board, 08/03/12.
PHENIX WEEKLY PLANNING 2/15/2007 Don Lynch. 2/15/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress All.
SiW ECAL Technological Prototype Test beam results Thibault Frisson (LAL, Orsay) on behalf of the CALICE collaboration.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be Jun at IIT and the 19th at Fermilab right before the.
PHOBOS 22.5 & 62.4 GeV Cu+Cu Peter Steinberg Brookhaven National Laboratory March 23, 2005.
Linda R. Coney – 24th September 2009 MOM Update Linda R. Coney 24 September, 2009.
RPCs of BESIII Muon Identifier  BESIII and muon identifier  R&D  Mass production  Installation Zhang Qingmin Advisor: Zhang Jiawen.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
F ERMILAB T EST B EAM F ACILITY Aria Soha March 22, 2011.
Curtis A. Meyer 20 May, 2004 GlueX Detector Infrastructure The issue of infrastructure includes details of how we assemble the detector as a whole. How.
1 G9a -FROST. 2 Experiments FROST New generation of CLAS photoproduction experiments with FROzen Spin Polarized Target (FROST) E02-112: γp→KY (K + Λ,
T. Kawamoto1 ATLAS muon small wheels for ATLAS phase-1 upgrade LHCC T. Kawamoto (New) small wheels ? Why new small wheels for high.
The 21st International Conference on Ultrarelativistic nucleus-nucleus collisions, March 30 – April 4, Knoxville, TN Results from cosmics and First LHC.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
MOLLER Collaboration Meeting May 2014 Hall A Update Thia Keppel 1.
IP instrumentation configuration for Autumn 2010 ATF2 runs Toshiyuki OKUGI, KEK 2010 / 7/ 1 10 th ATF2 project meeting.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
Measurement of the Charge Ratio of Cosmic Muons using CMS Data M. Aldaya, P. García-Abia (CIEMAT-Madrid) On behalf of the CMS Collaboration Sector 10 Sector.
EMR detector lying beam-face up in Geneva workshop.
MICE CM39 St Catherine’s, Oxford, 26 June 2014 Paul Soler Instrumentation Global Commissioning Plan.
The Detector Performance Study for the Barrel Section of the ATLAS Semiconductor Tracker (SCT) with Cosmic Rays Yoshikazu Nagai (Univ. of Tsukuba) For.
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
Bill Christie For the STAR Collaboration January 5, Outline Detector configuration for Run 16 Data set Goals Desired luminosity profile for Run.
6 September 2007VELOEddy Jans 0 VELO-installation++ activities September 6, 2007 General items Detector installation plans.
MUON Project Overview Action Items from September meeting New Action Items Update to the List of Worries Update of plans for the next 6 months.
NUMI MINOS MINOS Far Detector Installation & Commissioning Jeff Nelson MNHEP DoE Visit September, 2002.
4 May 2006May 06 PMG - Paul R1 AFEII-t Status May 4, 2006 PMG Paul Rubinov.
Atlas Software May, 2000 K.Amako Status of Geant4 Physics Validation Atlas Software Week 10 May, Katsuya Amako (KEK)
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
Sti primary track puzzle Yuri Fisyak. Charge dependent relative difference in primary track transverse momentum between Sti (.dev) and TpT On STAR collaboration.
Status of the NOνA Experiment Satish Desai - University of Minnesota For the NOνA Collaboration APS Meeting - April 2013 Denver, Colorado.
Preparation for Running Outline Present Schedule Detector Preparation Requests for dedicated runs –Cosmics, Splashes, Alignment Muon Shifts Experts A.
Booster Status, September 4, 2003 – E. Prebys 1 Frantic Shutdown Preparations Continue…
Minerva Test Beam 2 Status Geoff Savage for the Test Beam 2 Team March 23, /23/2015AEM - Minerva Test Beam 2 Status1.
Real data in the Muon Spectrometer Bernardo RESENDE and a lot of other people not named here NIKHEF Jamboree, December 2008.
Measurement of the CR light component primary spectrum B. Panico on behalf of ARGO-YBJ collaboration University Rome Tor Vergata INFN, Rome Tor Vergata.
Tracking Group Testbeam Needs Bruce Schumm UC Santa Cruz SLAC Linear Collider Workshop January 7-10, 2004.
ATF2 Status N.Terunuma, KEK
Calibration: preparation for pa
Wednesday 8.9 External crossing angles:
Commissioning and Calibration Strategies for Micromegas Vertex Tracker
Installation of an Instrument on a CERN machine
MICE CM31 Schedule summary
CMS Preshower: Startup procedures: Reconstruction & calibration
Completing the Step IV Programme
Preparation of the CLAS12 First Experiment Status and Time-Line
Bubble Chamber – Beam Requirements
Luminometer Integration at IR2
ThomX – Commissioning Meeting – 25/01/2018
Presentation transcript:

Commissioning Schedule and Shifts – First Call E906 Collaboration Meeting 23 February 2010

2 Commissioning  Understand Beam  Check detector gains and thresholds with minimum ionizing particles  Set detector timing  Set trigger timing  Measure rates in a systematic way – multiple KMAG fields ???  Take data to align spectrometer – KMAG magnet on and magnet off??  Take data to study trigger matrices  If STA 1 chambers exist, measure solid in center and at ends of liquids to help calibrate vertex resolution – Do we have an alternative??? Is there any usefulness for a cosmic ray trigger – air showers? How much time is need for each step? How much access time is needed for adjustments? What can be interleaved? What installation can be interleaved? Set up a commissioning plan group! Send us your requests – conditions, time access

3 Shifts  When do we want to start scheduling shifts?  One philosophy, start early and shift people will help in installation  Second philosophy, wait until we are ready for beam  Since 2 people will be needed for any NM4 access, will have to start with at least 2 once NM4 is closed up.  Need subsystem experts continuously available at FNAL early June??? until shutdown.  Nominally ~50 people – need 7 per week minimum– Given schedule conflicts probably need to start at 5-7 days/month of shifts for everyone.  We need lots of people around May-July  Get your safety training up to date, especially radiation safety and controlled access