European Grid Initiative Design Study Current Status Luděk Matyska CESNET EGI_DS Project Director (With thanks to Juergen Knobloch for pictures)

Slides:



Advertisements
Similar presentations
EGEE-III and EGI Design Study Future European Grid Landscape CSC Finnish IT Center for Science.
Advertisements

EGI Design European Grid Initiative Design Study Proposal.
EGI_DS – WP3 Workshop – CERN – Jan th 2008 WP3 Consolidation Workshop CERN, Jan th WP4 Status – Anne-Claire Blanchard - CNRS/IN2P3.
The EGI – a sustainable European grid infrastructure Michael Wilson STFC RAL.
ASPERA-2 WP2: Extension of the network and update of the status of Astroparticle Physics  Objectives  Structure  Tasks  Milestones & Deliverables Kickoff.
The European Grid Initiative – Status and Overview Dieter Kranzlmüller (GUP, Joh. Kepler University Linz)
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE-III Program of Work Erwin Laure EGEE-II / EGEE-III Transition Meeting CERN,
Towards a National Grid Infrastructure - The European View Dieter Kranzlmüller (GUP, Joh. Kepler University Linz)
EGEE – EGI Transition Jürgen Knobloch, CERN EGI_DS Technical Director WLCG OB CERN 13 November 2009.
EGI: A European Distributed Computing Infrastructure Steven Newhouse Interim EGI.eu Director.
European Grid Initiative Design Study Ludek Matyska CESNET, Czech Republic Member of the EGI_DS team.
EGI – the next evolutionary step in Grid infrastructures Luděk Matyska CESNET Czech Republic
EGI Status and Outlook Pre-GDB May 12 th, 2009 Jürgen Knobloch, CERN EGI_DS Technical Director 2-Mar-091 J. Knobloch - Pre-GDB 12-May-2009.
CHAIN Project Preliminary Name & Ideas (and Issues) Federico Ruggieri – INFN Meeting of 3 April CERN.
Results of the HPC in Europe Taskforce (HET) e-IRG Workshop Kimmo Koski CSC – The Finnish IT Center for Science April 19 th, 2007.
Towards the new EGI governance model Arjen van Rijn (Nikhef) Chair Organizational Taskforce (EGI_DS and Local Host)
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Steven Newhouse EGEE’s plans for transition.
European Grid Initiative Dieter Kranzlmüller (GUP, Joh. Kepler University Linz)
Overview & Status of the Middleware & EGI Core Proposals Steven Newhouse Interim EGI Director EGEE Technical Director 26/05/2016 Status of EGI & Middleware.
Notur: - Grant f.o.m is 16.5 Mkr (was 21.7 Mkr) - No guarantees that funding will increase in Same level of operations maintained.
ESTELA Summer Workshop, 26 June 2013 The EU-SOLARIS project.
The EGI Blueprint: Grid Operations and Security Migration to the next grid operations era Tiziana Ferrari (Istituto Nazionale di Fisica Nucleare)
European Commission DG Enterprise VIRTUAL ENVIRONMENT FOR INNOVATION MANAGEMENT TECHNIQUES VERITE Kick-off meeting Thessaloniki November 2001.
This document produced by Members of the Helix Nebula Partners and Consortium is licensed under a Creative Commons Attribution 3.0 Unported License. Permissions.
Ian Bird LCG Project Leader OB Summary GDB 10 th June 2009.
Enabling Grids for E-sciencE 1 EGEE III Project Prof.dr. Doina Banciu ICI Bucharest GRID activities in RoGrid Consortium.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Bob Jones EGEE project director CERN.
1 ASTRONET Coordinating strategic planning for European Astronomy.
EGEE-III-INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE-III All Activity Meeting Brussels,
User Community Transition from EGEE to EGI 17 Dec 2008 – Orsay, France The Proposed EGI Model Diana Cresti, INFN
Budapest /08/2001 Annual Report of the European Regional Focal Point. Dominique PLANCHENAULT.
Dieter European Grid Initiative Towards a sustainable production grid infrastructure.
CERN as a World Laboratory: From a European Organization to a global facility CERN openlab Board of Sponsors July 2, 2010 Rüdiger Voss CERN Physics Department.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGI Operations Tiziana Ferrari EGEE User.
EGI-InSPIRE Steven Newhouse Interim EGI.eu Director EGI-InSPIRE Project Director Technical Director EGEE-III 1GDB - December 2009.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Going from EGEE-NA ES cluster to EGI SSC.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NA5: “Policy and International Cooperation”
Community of Practice on partnership in the ESF October 2008 Open Days Benedict Wauters Deputy Director Flemish ESF Agency COP partnership coordinator.
WLCG Laura Perini1 EGI Operation Scenarios Introduction to panel discussion.
4 May 2009SSC Workshop, Athens1 User Community Services, SSCs, NGI International Tasks 04 May 2009 EGEE/EGI SSC Workshop – Athens, Greece Diana Cresti,
A. Candiello, INFN New industry perspectives emerging from the EGI model dr. Antonio Candiello INFN/IT, 39 Countries (NGIs)
Enabling Grids for E-sciencE EGEE-III INFSO-RI NA1 EGI Task Transition All Activity Meeting – January 2009.
European Grid Initiative Design Study Current Status Luděk Matyska CESNET EGI_DS Project Director (With thanks to Juergen Knobloch for pictures)
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA2 Networking support for EGEE III Xavier.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NA5: Policy and International Cooperation.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NGI Policy Workshop Introduction and scope.
E-science grid facility for Europe and Latin America CHAIN Proposal v0.1 EELA-2 compilation CERN e-Infrastructure projects Meeting ( )
Representation of European Grid efforts, international cooperation, and ESFRI EGI_DS WP3 consolidation workshop, CERN Fotis Karayannis, GRNET.
Resource Provisioning EGI_DS WP3 consolidation workshop, CERN Fotis Karayannis, GRNET.
European Spallation Source Overview and Status Technical Advisory Committee 1-2 April 2015 James H. Yeck ESS CEO & Director General
EGI-InSPIRE RI EGI-InSPIRE RI EGI-InSPIRE 1 EGI Governance Model Yannick Legré Director, EGI.eu
EGI-InSPIRE Project Overview1 EGI-InSPIRE Overview Activities and operations boards Tiziana Ferrari, EGI.eu Operations Unit Tiziana.Ferrari at egi.eu 1.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NA5: Policy and International Cooperation.
INFSO-RI Enabling Grids for E-sciencE EGEE general project update Fotis Karayannis EGEE South East Europe Project Management Board.
EGI InSPIRE Report to the EGI Council Steven Newhouse On behalf of the Editorial Board.
Co-ordination & Harmonisation of Advanced e-INfrastructures WP4 : Modelling the cooperation of European e-Infrastructures with non-European ones Ludek.
Ian Bird LCG Project Leader Summary of EGI workshop.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE NA4 SSC Workshop A&A SSC Proposal C.
NA5: Policy and International Cooperation
A. Candiello, D. Cresti, T. Ferrari1, F. Karagiannis, D
Tiziana Ferrari, INFN CNAF CNAF, Febbraio 2009
EGI Blueprint or Do not be afraid of EGI
Diana Cresti, INFN User Community Services in the European Grid Infrastructure 29 Jan 2009 – Paris, France Diana Cresti, INFN
Luděk Matyska CESNET ERIC Survey Results Luděk Matyska CESNET
Long-term Grid Sustainability
TAPAS in the EGI “ecosystem”
ROSCOE Robust Scientific Communities for EGI
Operations sustainability
SOCIAL DIALOGUE WITHIN EUPAN
EGI-Engage T. Ferrari/EGI.eu.
Presentation transcript:

European Grid Initiative Design Study Current Status Luděk Matyska CESNET EGI_DS Project Director (With thanks to Juergen Knobloch for pictures)

EGEE III AA meeting, Brussels January 27th, Project Information Title: European Grid Initiative Design Study Budget: € EC Contribution: € Starting date: September 1 st, 2007 Duration: 27 months Total man power: PMs Coordinator: CESNET, Czech Republic (since July 1 st, 2008) GUP University Linz, Austria (till June 30 th, 2008)

EGEE III AA meeting, Brussels January 27th, Project Partners 1.CESNET (coordinator): CESNET, zajmove sdruzeni pravnickych osob (Czech Republic) 2.GRNET: Greek Research and Technology Network S.A. (Greece) 3.INFN: Istituto Nazionale di Fisica Nucleare (Italy) 4.CSC: CSC - TIETEELLINEN LASKENTA OY (Finland) 5.LMU: Ludwig Maximillian Universitaet (Germany) 6.CERN: European Organization for Nuclear Research (Switzerland) 7.DNF: Verein zur Foerderung eines Deutschen Forschungsnetzes - DFN-Verein (Germany) 8.STFC: Science & Technology Facilities Council (UK) 9.CNRS: Centre National de la Recherche Scientifique (France) 10.GUP (former coordinator): Johannes Kepler Universitaet Linz (Austria)

EGEE III AA meeting, Brussels January 27th, Project Review October 3, 2008, Brussels Successfully passed (Good to Excellent) Major issues from the review report –Steps for the targeted call for EGI in 2009 –NGI maturity: Identify credible potential partners, assess the NGI maturity in regular intervals –Location of the EGI.org –Convincing EC at the political level –Convincing National Authorities and funding bodies

EGEE III AA meeting, Brussels January 27th, Collaboration Activities EGEE –Extensive involvement of EGEE staff in the Blueprint and D3.1 deliverable –Agreement on input for the transition deliverable (EGEE DNA1.4 and other material from EGEE) PRACE meeting in Lyon (during ICT) –Discussion on relationship between EGI, PRACE and DEISA CERN involvement –A short meeting (EGI PD and new CERN RD) January 14 th –New CERN management explicit support for EGI More emphasis on ESFRI projects as the major users of the future EGI infrastructure –Leverage current EGEE activities

EGEE III AA meeting, Brussels January 27th, Goal of EGI Design Study Design of a new organizational model of a sustainable pan-European Grid infrastructure –the Blueprint Securing the endorsement of the proposed design –Policy Board meeting, 20 th January 2009 Preparation and setup of the new organization –the EGI.org

EGEE III AA meeting, Brussels January 27th, The Road to the Current Blueprint WP3 consolidation WS Jan-08 WP3 consolidation WS Jan-08 MW: Coordination – no development Provision of a large-scale production Grid infrastructure MW: Coordination – no development Provision of a large-scale production Grid infrastructure Rome workshop March-08 Rome workshop March-08 D5.1: Draft Definition of EGI Org D5.2: Draft Convention D5.1: Draft Definition of EGI Org D5.2: Draft Convention Geneva workshop 30-June-08 Geneva workshop 30-June-08 Istanbul workshop 22-Sep-08 Istanbul workshop 22-Sep-08 D4.4: Early Draft of Blueprint Second Draft of Blueprint Feedbac k Requirement s from NGIs, EGEE Final Blueprint Prague Policy Board 20-Jan-09 Prague Policy Board 20-Jan-09 Feedba ck Feedback from: NGIs, EGEE, other Grids PRACE,WLCG,etc. Feedback from: NGIs, EGEE, other Grids PRACE,WLCG,etc.

EGEE III AA meeting, Brussels January 27th, EGI Basic Elements EGI = EGI.org + NGIs –EGI.org a coordinating body –NGIs basic sustainable actors National funding Own agenda and tasks –Synergies when working together at the EU level No middleware development within EGI –However, middleware maintenance included

EGEE III AA meeting, Brussels January 27th, EGI.org and NGI Tasks 13-Feb-16 J. Knobloch - EGI_DS Policy Board 20-Jan EGI.org tasks NGI international tasks NGI local tasks EGI.org NGI

EGEE III AA meeting, Brussels January 27th, Business Model International research teams and projects need a common international infrastructure to share data and compute resources EGI ensures a common infrastructure –National funding of research infrastructures  NGIs –Coordination through EGI.org –Steered by users

EGEE III AA meeting, Brussels January 27th, EGI Management/Governance EGI.org EGI Director Non-voting Representatives extra-EU NGIs, Chair of UFSC, … Associate Members e.g. EIROforum member, … Members NGI 1, NGI 2, NGI 3, … NGI n EGI Council EGI Advisory Committees e.g. Middleware Coordination Board (MCB) User Forum Steering Committee (UFSC) User Forum (UF) Middleware Unit Administration & PR Unit Operations Unit User Community Services CTO Middleware Maintenance CAO Admin & PR UCO User Coordination COO Operations

EGEE III AA meeting, Brussels January 27th, Funding National and Institutional funding for research infrastructures EC funding –International coordination –International activities –Innovation –Start up phase National co-funding of these activities

EGEE III AA meeting, Brussels January 27th, Resources for EGI.org

EGEE III AA meeting, Brussels January 27th, Resources in NGIs Based on current experience These resources exist in countries with operational grid infrastructure Based on current experience These resources exist in countries with operational grid infrastructure

EGEE III AA meeting, Brussels January 27th, EGI Financial Reference Model NGI International tasks Middleware maintenance EGI.orgTotal Operations User services Costs EGI Effort (FTEs) EGI costs (M€/year) Income NGI membership fees (M€/year) 1,01 EC Contribution (M€/year) NGI, Middleware consortia and EIRO/ESFRI co-funding Contribution (M€/year)

EGEE III AA meeting, Brussels January 27th, Funding view of NGI EGI.org Membership Fees 30 k€ NGI “Average medium sized NGI” 600 k€ EC FundingNational Co-Funding

EGEE III AA meeting, Brussels January 27th, Funding Evolution

EGEE III AA meeting, Brussels January 27th, Transition towards EGI EGEE and similar EU projects Major issues –NGIs maturity level The EGEE JRUs not always identical with the proto-NGI Representing/working with different user communities Different approaches toward national infrastructures –EGI.org Location Key personnel identification Need for EGI technical representation “Transition Scenario from Current Grid Infrastructures to EGI” (Deliverable D5.5)

EGEE III AA meeting, Brussels January 27th, EGI.org Location Call for bids closed January 7 th, 2009 Total of 8 bids received –France (Lyon), Finland (Espoo), Italy (Milan), Lithuania (Vilnius), Netherlands (Amsterdam), Poland (Krakow), Slovenia (Ljubljana), Spain (Trujillo) Evaluation Board constituted during EGI PB meeting in Prague (January 20 th ) Decision to be taken by the PB in Catania, March 2 nd

EGEE III AA meeting, Brussels January 27th, Summary The first phase successfully completed –Blueprint accepted and endorsed –Huge interest in hosting EGI.org –Clear financial breakdown The second phase even more challenging –Securing EC and national funding –EGI.org setup and personnel identification –Maturing NGIs –Clear definition of the transition path for all EU and national Grid infrastructures

EGEE III AA meeting, Brussels January 27th,