11/23/2004Module # 11 The NCSX Project Web An Indoctrination and Overview.

Slides:



Advertisements
Similar presentations
Archiving NCSX Construction Information Using the PPPL Windows Based Server.
Advertisements

1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
First Article Inspection Report
1 Chapter 2: Product Development Process and Organization Introduction Importance of human resources: Most companies have similar technology resources.
ESOS COMPLIANCE PROCESS 26 FEBRUARY REGULATORY APPROACH.
1 THE OFFICE 2 OFFICE PROJECT COLLABORATION SYSTEM.
Enterprise Content Management Pre-Proposal Conference for RFP No. ISD2006ECM-SS December 6, 2006 California Administrative Office of the Courts Information.
Project Bidding Procedures Enhancing Data and Presentation Skills for Engineers EDASPE Writing the RFP Training Courses – July 2004.
Schools Module Introduction Press F5 to maximise this presentation.
Titolo Titolo 2. Web Portal Strenghts Manage and share personal documents and insights Keep teams in sync and manage important projects Stay up to date.
PALM-3000 PALM-3000 Management Update Antonin Bouchez, Jenny Roberts Team Meeting #7 27 February, 2008.
Getting Started in Blackboard. You will need… A web browser, preferably Internet Explorer, version 4.0 or higher An account and the knowledge of.
RECRUIT Overview November 29, 2005 Academic Personnel Systems 1 Academic Personnel Systems: RECRUIT Please silence cell-phones.
ClASS MODULES: BREAKOUT SESSIONS. ClASS FINANCIAL MODULE.
Ground Control™ Document Control and Training Manager
1 IDOT Vendor Portal Training August 5, 2013 Illinois Department of Transportation Presenter: Betsy Calcara.
(Insert name of PCC) Applying for Nonprofit Mailing Privileges Using PostalOne!
Washington Metropolitan Area Transit Authority Pre-Proposal Conference Sourcing and Contracts Management System (CMS) Solution Request for Proposal FQ
1/18/2005Module 41 How the NCSX Project Does Business Work Planning & Design Review Processes.
From Research Prototype to Production
New Grants Model Document Retention 1 District 5240 Grants Document Retention District Assembly /6/2013.
SI team data access Scott Horner 28 September 2009.
Sentry’s Implementation and Use of the Supplier Contract Module Presented by: Barry Estes - Director of Procurement and Contracts Blake Barron - Contract.
D5240 Document Retention System 8/20/ District 5240 The Rotary Foundation Grants Document Retention System Rotary Year
Team Jeopardy Objective ä Name the topics described ä Make the correct team noise when you want to answer ä Answer in the form of a question.
NCSX NCSX Design Review Guide May 27, 2005 Wayne Reiersen NCSX.
12/2/04Module 2D1 The NCSX Engineering Web – An Overview Part IV Engineering Management & Systems Engineering and Other.
12/2/2004Module 2A1 The NCSX Engineering Web – An Overview Part I Work Planning, Project Files, Management Plans and Procedures.
NCSX Systems Engineering Management Plan Peer Review Bob Simmons May 15, 2003.
Intervention for Chronic and Emergency Exposure Situations Assessment and Response during Nuclear Emergency Protective Action Decision Making for Severe.
Electronic Enterprise Integration Committee Overview of Aerospace Industry IUID Data Exchange Guideline December 14, 2005 Bill Zirkel, Northrop Grumman.
International Atomic Energy Agency Irina Sanda Education and Training in the Area of Safety Assessment Irina Sanda Safety Assessment Section Division of.
Dr. John MacCarthy UMBC CMSC 615 Fall, 2006
Alpha Contracting Sole Source Negotiations between Government and Industry (13 CFR (c)(2))
Grant Management Seminar Session 3 1 Session 3 Oversight and Reporting 10/13/2012.
Copy of the from the secure website - click on the AccoridaLife.zip link.
NCSX Data Management Plan Peer Review Bob Simmons March 31, 2003.
How the NCSX Project Does Business
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
September 10, FY 2003 Plans Bob Simmons. September 10, Introduction Overview of Project and Engineering Plans Project Plans Engineering Plans.
12/2/04Module 2C1 The NCSX Engineering Web – An Overview Part III Design Data, Fabrication, Assembly, and Installation Plans.
NCSX Document and Records Plan Peer Review Bob Simmons March 14, 2003.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
Data Coordinating Center University of Washington Department of Biostatistics Elizabeth Brown, ScD Siiri Bennett, MD.
Office of Human Research (OHR) Quality Improvement Program Patrick Herbison Heather Krupinski.
COLLEGE OF ARTS & SCIENCES PROMOTION AND TENURE DOSSIER ASSEMBLY WORKSHOP FALL 2016.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
Presented at Annual Conference of the American Evaluation Association Anaheim, CA, November 2011 Lessons Learned about How to Support Outcomes Measurement.
College of Arts & Sciences Promotion and tenure Dossier assembly workshop spring 2017.
College of Arts & Sciences Lecturer Promotion Dossier assembly workshop fall 2016.
SCC P2P – Collaboration Made Easy Contract Management training
REVISIONS DATE SLIDE CHANGE 11/22/10
Create a PO-Based Invoice
College of Arts & Sciences Promotion and tenure Dossier assembly workshop fall 2017.
Using Apps to Get and Share Information
College of Arts & Sciences Lecturer Promotion Dossier assembly workshop fall 2017.
USOAP Continuous Monitoring Approach (CMA) Workshop
Engineering Processes
MODULE A - ADMINISTRATIVE
College of Arts & Sciences Promotion and tenure Dossier assembly workshop fall 2018.
Lockheed Martin Canada’s SMB Mentoring Program
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
College of Arts & Sciences Lecturer Promotion Dossier assembly workshop fall 2018.
E-Invoicing for Network Access Customers
Guide for successful completion of First Article Inspection Reports
Document Management Don Mitchell March 15, 2019.
Guide for successful completion of First Article Inspection Reports
Project Management Considerations
Annual Inventory Verifications Concur Travel Update Surplus Update
Post Award Update Quarterly dga meeting
Presentation transcript:

11/23/2004Module # 11 The NCSX Project Web An Indoctrination and Overview

11/23/2004Module # 12 Purpose Will provide a general indoctrination and overview of the NCSX Project web page and its subwebs: NCSX Team Directory NCSX Publications Project Office Physics Engineering Manufacturing Also Two Project FTP Sites Other links on web

11/23/2004Module # 13 Getting Started Link to NCSX Web Page

11/23/2004Module # 14 The NCSX Project Web Page URL NCSX Sub Webs Other Links

11/23/2004Module # 15 Other Links Recent postings and information that is of interest Press releases Recent DOE Critical Decision Approvals Etc.

11/23/2004Module # 16 Information Sub Webs Project Team Directory Contains contact information on all NCSX Project personnel (name, telephone/fax, and ) This is an open access web NCSX Publications Contains journal articles and papers presented at scientific conferences Nuclear Fusion, Plasma of Physics, etc. IAEA, APS, International Stellarator Workshop, etc. This is an open access web

11/23/2004Module # 17 Project Office Sub Web This is an open access web although some portions password protected Contains Meeting Presentation/Reports FESAC and DOE, Project Advisory Committee (PAC), Integrated Project Team (IPT), Periodic Reports to OFES and DOE Project Office, & Project Meetings Project Control Information DOE Project Accounting and Reporting System (PARS) information Project Control Documents – many are password protected since they contain cost and schedule information Plans, Proposals, and Reviews Presentations to all the Project reviews and audits Major Project Documents Critical Decision Letters Major Top-Level Project Plans

11/23/2004Module # 18 Project Office Sub Web

11/23/2004Module # 19 Physics Sub Web Contains physics analyses and information on the research and diagnostic plans Also includes some early physics meetings during pre-conceptual design phase

11/23/2004Module # 110 Manufacturing Sub Web

11/23/2004Module # 111 Engineering Sub Web (Protected Web) Divided into Nine Sections Work Planning and Project Control Project Files Management Plans and Procedures Procurement, Statements of Work, & Specifications Design Verification Design Data Fabrication, Assembly, Installation & Test Plans Engineering Management & Systems Engineering Other

11/23/2004Module # 112 Engineering Sub Web Each section contains links to specific lower level webs and to guidance documents The NCSX Engineering Web contains the Project Files in an electronic format Exceptions to this are electronic drawings and models (Pro/INTRALINK System) and hard copies of run procedures or vendor submittals stored in the PPPL Operations Center Module 2 in this training syllabus will address the details of the Engineering Web Will provide an overview of the contents of the Engineering Web Subsequent modules will drill down into greater detail and discussions

11/23/2004Module # 113 Engineering Sub Web

11/23/2004Module # 114 Two FTP Sites Project FTP Site For internal project use primarily Provides convenient open forum for exchange and posting of large data files such as physics analyses Supplier FTP Site Prime source of technical/management information for the suppliers under contract Specifications Drawings and models Statements of Work

11/23/2004Module # 115 Project FTP Site Data Files/Analyses

11/23/2004Module # 116 Supplier FTP Site Link from Engineering Web Also suppliers provided URL: ftp://ftp.pppl.gov/pub/ncsx/manuf/ Folders then available for each contract Within folders are the latest contract- relevant documents (e.g., specification, zip file of models and drawings, SOW, read me file, etc.)

11/23/2004Module # 117 Summary This training module has provided an oversight of what is available on the NCSX Web and FTP sites Also provides links to other relevant NCSX information What will follow?

11/23/2004Module # 118 What is Next? Follow-on Training Modules The NCSX Engineering Web – An Overview (Module #2) – several submodules Specs, SOWs, and Design Criteria (Module #3) Work Planning Processes (Module #4) Design Review Processes (Module #5) Electronic Models and Drawings (Module #6) Configuration Control Processes (Module #7) Interface Control Processes (Module #8) WBS Dictionary and Management Plans (Module #9) Electronic Signatures (Module #10) The Manufacturing Web and the Supplier FTP Site (Module # 11)