BUILDING: LOCATION: SIZE: OCCUPANT: ARCHITECT: ENGINEERS: St. Francis Friary Hanceville, Alabama 59,900 square feet, 2 floors above grade Archdiocese.

Slides:



Advertisements
Similar presentations
DOUG BOSWELL MECHANICAL OPTION APRIL 16, 2008 Temple University Tyler School of Art.
Advertisements

STEM Center Delaware County Community College – Media, PA Thesis Final Presentation Dan Saxton Mechanical Option.
Pennsylvania State Employees Credit Union Corporate Headquarters Senior Thesis Presentation | lighting / electrical | Sarah Wujcik | | Dr Houser.
WESTINGHOUSE ELECTRIC NUCLEAR ENGINEERING HEADQUARTERS DANIEL AUGHENBAUGH - MECHANICAL OPTION Westinghouse Nuclear Engineering Headquarters Daniel Aughenbaugh.
Coppin State University Physical Education Complex Kaylee Damico – Mechanical Option April 12 th, 2011 Presentation Outline Project Team Project Overview.
Newseum and Freedom Forum Headquarters Washington, D.C. Ryan Wise Lighting/Electrical Option Consultants: Dr. Mistrick ; Prof. Dannerth April 15, 2009.
Integration of Mechanical System Redesign Geothermal Heat Pump Redesign Wesley S. Lawson Architectural Engineering Mechanical Option Pennsylvania State.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Bowie State University Fine and Performing Arts Center Zachary Lippert Faculty Advisor: Dr. Stephen Treado.
GEOTHERMAL ENERGY. Geothermal energy is the natural heat of the Earth.
The Edward St. John Student Center Zachary Haupt Faculty Advisor: Dr. William Bahnfleth 11 April 2011.
BENTLEYVILLE, PENNSYLVANIA KYLE COURTNEY | MECHANICAL OPTION | DUSTIN EPLEE.
Chilled water Meyrin consolidation Study 1 st Part Many thanks for their contribution to: Pasquale Alemanno, Fortunato Candito, Alexander Putzu.
1 Medical Office Building. 2 Occupancy – 400 persons 8 a.m. – 5 p.m. Monday - Friday Building Characteristics Three stories 40,000 square feet (200’ x.
2009 AE Senior Thesis Presentation MICHAEL P. GARDNER Mixed-Use Project Eastern United States.
William H. Gates Hall University of Washington School of Law Katie Jenkins The Pennsylvania State University Architectural Engineering Lighting/Electrical.
CENTRAL HIGH SCHOOL Central High School MID-ATLANTIC REGION ADAM BROWN MECHANICAL OPTION SPRING 2014 Introduction Existing Mechanical System Thesis Proposal.
Presentation Outline Introduction System Optimization Analysis Acoustical Breadth Conclusion Acknowledgements Questions Thesis Final Presentation Army.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
The New RLPS Architects Office Building Lancaster, PA Brice Ohl – Mechanical Option Presented on 4/10/13.
JOHN PAUL JONES ARENA CHARLOTTESVILLE, VIRGINIA JOHN PAUL JONES ARENA CHARLOTTESVILLE, VIRGINIA FINAL DESIGN PRESENTATION LOGAN BROWN LIGHTING/ELECTRICAL.
Ray & Joan Kroc Corps Community Center Mathias Kehoe | Mechanical Option April 09, 2012.
University Ridge at E ast Stroudsburg University Matthew Carr Spring 2007 Mechanical Option Faculty Advisor: Dr. Freihaut.
CNBC GLOBAL HEADQUARTERS
UNIFIED SCIENCE CENTER THE UNIVERSITY OF SCRANTON SCRANTON, PA DALE E. HOUCK MECHANICAL OPTION.
The Health Care Center Dauphin County, PA Ken Lorenz Penn State University Architectural Engineering Construction Management April 17, 2007.
Geothermal Heat Pump Systems Advantages of Geothermal
PRESENTED BY: J.MIKE TYSON S.RAVIKUMAR S.SAKTHI M.SATHISHKUMAR.
Bronx School for Law Government & Justice Yulien Wong Mechanical Option 2006 Senior Thesis Bronx, New York.
Tri-Valley Jr./Sr. High School Hegins, PA Senior Thesis, Spring 2004 Studying The Feasibility of a Dedicated Outdoor Air System.
Dan Donecker BAE/MAE – Structural Option Senior Thesis Project 35 West 21 st Street New York, New York.
Architectural Engineering Senior Thesis Mechanical System Redesign Saint Joseph Medical Center Chris Nicolais.
Dansko Phase III West Grove, PA David Rosenberger Lighting/Electrical Lighting Advisor: Dr. Mistrick Electrical Advisor: Ted Dannerth.
Building Overview Lighting Depth & Electrical Depth – Redesign -Streetscape -Gallery -Flex Use Space -Laboratory Architectural Breadth– Southern façade.
Learning Outcomes Upon completion of this training one should be able to: Identify hydronic chilled water system applications. Define the difference between.
APPELL LIFE SCIENCES York College of Pennsylvania Joshua Martz | Dr. Srebric | April 11, 2011 Image Courtesy of RLPS, Ltd.
Mechanical EmphasisTimothy R. Nolan Baltimore, Maryland April 17, 2003 Consultant – Mr. Freihaut.
The Sunshine Elementary School Redesign Proposal Pennsylvania State University AE Senior Thesis Nicholas Scheib Mechanical Option- IP.
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
Jonathon Gridley Senior Thesis – Spring 2007 Mechanical Option Energy Efficient Mechanical System Alternatives South Jefferson High School S OUTH J EFFERSON.
Greenbriar East Elementary School Fairfax, Virginia Michelle L. Siano Mechanical Option Spring 2005 Senior Thesis.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Naval Network & Space Operations Command (NNSOC) Christopher Ankeny Lighting/Electrical Option Senior Thesis 2007 Advisor: Dr. Richard Mistrick Electrical.
Flood Athletic Center Woong June Chung Penn State University Mechanical Option Thesis Advisor : DR. Willam Bahnfleth, P.E.
Malory J. Faust ∙ Mechanical Option ∙ Senior Thesis 2007.
Twin Rivers Elementary/Intermediate of McKeesport Area School District Tessa Bauman Mechanical Option Technical Consultant: Laura Miller 1600 Cornell St.,
Hamot Women’s Hospital Erie, PA Michael Galleher Mechanical Option l AE-Senior Thesis l April 12, 2011 l Advisor Dr. Jelena Srebric.
Learning Outcomes Upon completion of this training one should be able to: Identify hydronic chilled water system applications. Define the difference between.
HALF MOONE CRUISE & CELEBRATION CENTER Jonathan Walker Lighting / Electrical Option 4/15/09 Introduction | Lighting | Mechanical | Structural| Electrical.
North Hills Junior High School Pittsburgh, PA Senior Thesis Final Presentation 2005 Chris Rush Lighting / Electrical Faculty Consultant: Dr. Mistrick.
The New Student Housing Building at The Mount St. Mary’s University Emmitsburg, Maryland Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007.
ANTONIO DESANTIS VERNE STRUCTURAL OPTION ADVISOR: PROF. PARFITT APRIL 14, 2008 BRIDGESIDE POINT II PITTSBURGH, PA “BUILDING SYSTEM OPTIMIZATION” THE DEPARTMENT.
J. david maino the pennsylvania state university architectural engineering lighting/electrical.
NOLAN JAMES AMOS Dr. William Bahnfleth, Faculty Consultant architectural engineering senior thesis mechanical option PHOENIXVILLE EARLY LEARNING CENTER.
Harley-Davidson Museum Milwaukee, WI. Jonathan Rumbaugh, BAE/MAE Mechanical Option Advisor: Dr. William Bahnfleth.
Manoa Elementary School Amanda Cronauer Faculty Advisor: Dr. William Bahnfleth 14 April 2010.
Michael Reilly, Jr. – Mechanical Option Advisor – James Freihaut, PhD & Dustin Eplee The Pennsylvania State University Nassau Community College Life Sciences.
Philip Mackey The Pennsylvania State University Architectural Engineering L/E Option HC HOLY CROSS HOSPITAL – NORTH ADDITION FINAL REPORTPhil Mackey Holy.
Villanova University: School of Law Jason Greer The Pennsylvania State University Architectural Engineering Lighting/Electrical Option Senior Thesis –
Maryland Transportation Authority Police Training Facility
Harley-Davidson Museum
ENVIROCENTER PHASE II JESSUP, MD
Eastern High School Baltimore, MD
Grunenwald Science and Technology Building
SHEPHERD UNIVERSITY WELLNESS CENTER
The Benefit of Including Energy Recovery System Analysis
Biobehavioral Health Building, University Park, PA
LONGWOOD AT OAKMONT HEALTHCARE CENTER
Senior Thesis Presentation
Justin Pennycoff AE Senior Thesis 2008 Construction Management
Presentation transcript:

BUILDING: LOCATION: SIZE: OCCUPANT: ARCHITECT: ENGINEERS: St. Francis Friary Hanceville, Alabama 59,900 square feet, 2 floors above grade Archdiocese Franck, Lohsen, McCrery Architects Spiegel, Zamecnik, & Shah Inc. (S) Meta Engineers (MEP) BUILDING OVERVIEW Rendering courtesy of Franck, Lohsen, McCrery Architects

PRESENTATION OUTLINE MAIN PROJECT GOAL: To meet the desires of the client while silently honoring nature by enhancing the natural materials of the project and minimizing the project’s impact on the environment. LIGHTING DEPTH: Chapel Lighting Design Courtyard Lighting Design MECHANICAL BREADTH: Geothermal Heat Pump System ELECTRICAL DEPTH: Copper feeders vs. Aluminum feeders CONCLUSIONS QUESTIONS?

LIGHTING DEPTH RESPONSE TO MAIN GOAL: To silently honor nature by enhancing the natural elements of each space. CHAPEL COURTYARD

CHAPEL: LOCATION Chapel

CHAPEL: LIGHTING LAYOUT Pulpit Crucifix Meditation Archway Display

CHAPEL: LIGHTING LAYOUT Congregational Area

CHAPEL: CALCULATION GRIDS Recommended values obtained from IESNA Handbook.

CHAPEL: CALCULATION GRIDS Recommended values obtained from IESNA Handbook. The illuminance levels obtained at the pulpit meet IESNA’s recommended values. The lighting condition allows for performance of visual tasks with high contrast.

CHAPEL: RENDERINGS

COURTYARD: LOCATION Inner Courtyard

COURTYARD: LIGHTING LAYOUT Flood Light to wash 1 st story facade In-ground LEDs line path to mimic candles Wall sconce to mark key entryways

COURTYARD: LOCATION Outer Courtyard

COURTYARD: LIGHTING LAYOUT In-ground fixture to spot light statues of stations of the cross Pole fixture to provide ambient light for pathway Stations of the Cross (typ)

COURTYARD: RENDERINGS Recommended values obtained from IESNA Handbook The garden pathway meets the recommended illuminance values of 1 footcandle.

COURTYARD: FACADE

COURTYARD: PATHWAY

COURTYARD: RENDERINGS

MECHANICAL BREADTH RESPONSE TO MAIN GOAL: To silently honor nature by minimizing impact on the environment FCU/AIR HANDLING UNITSGEOTHERMAL HEAT PUMPS

Four Pipe Fan Coil/Air Handling System Fan coil units (typ) Air cooled chillerBoilerHW pumpsCHW pumps Hot water supply Hot water return Chilled water supply Chilled water return EXISTING SYSTEM

Water to Water Geothermal Heat Pump System Heat Pump (typ) Pumps Wells Constant temperature water supply Water return PROPOSED SYSTEM

40% decrease in yearly energy consumption $10,300 yearly savings on electricity 60% decrease in CO 2 emissions ENERGY SAVINGS, EMISSIONS REDUCTIONS

GEOTHERMAL WELL LOCATION Chiller used for current mechanical system (84)Wells for proposed geothermal system

The partial schedule above demonstrates that the addition of the geothermal wells does not adversely impact the overall construction schedule. PARTIAL CONSTRUCTION SCHEDULE

EXISTING VS. PROPOSED SUMMARY AND RECOMMENDATIONS: With an initial cost increase of $90,000 for the heat pump system, the payback period will be roughly nine years. Immediate benefits are seen in a 60% emissions reduction. The critical path for construction will not be directly affected by a decision to change to geothermal heat pumps. If funding is acquired, the geothermal heat pump system is advised for the St. Francis Friary.

CHARACTERISTIC COMPARISON EXISTING FEEDERS: COPPER ADVANTAGES Higher conductivity Higher tensile strength More reliable DISADVANTAGES Less cost efficient Heavier weight material ALTERNATIVE RESEARCHED: ALUMINUM ADVANTAGES More cost efficient Lighter weight material Better for longer runs DISADVANTAGES Increased wire size results in need for larger conduit 60% of the conductivity of copper Connections require attention if not properly installed

FEEDER SIZING COMPARISON Feeder size increases for all aluminum phase, neutral, and ground wires. Conduit sizes increase.

COST COMPARISON Cost based upon RSMeans Version % decrease in cost COPPERALUMINUM TOTAL COST$94,684.42$78, $16,237 in dollar savings SUMMARY AND RECOMMENDATION: With a 17% decrease in cost, this system will be advised for the St. Francis Friary. This cost will help to offset the additional costs for the geothermal system. To minimize maintenance issues, proper care should be taken during installation, especially at connections.

CONCLUSION MAIN GOAL: To meet the desires of the client while silently honoring nature by enhancing the natural materials of the project and minimizing the project’s impact on the environment. Were the desires of the client met? Were natural materials enhanced? Was the impact on the environment reduced?

ACKNOWLEDGMENTS I would like to acknowledge my appreciation for: Meta Engineers Franck, Lohsen, McCrery Architects Dr. Houser Dr. Mistrick Professor Dannerth AE Faculty and staff My fellow AE students My family

THANK YOU QUESTIONS?