30th March 2007A.Fabich, CERN AB-ATB1 MERIT - Status of the Experiment A. Fabich CERN AB-ATB MERIT safety review (3)

Slides:



Advertisements
Similar presentations
Communications Room: Router/WAP, Switch, Server, Patch Panel Communications Room: Router/WAP, Switch, Server, Patch Panel Hard-wired Ethernet Ports… Site.
Advertisements

Commissioning the access system M. Gruwé Machine checkout workshop November 8 th 2007.
Harold G. Kirk Brookhaven National Laboratory The CERN Target Experiment Schedule and Budget MERIT Review BNL December 12, 2005.
MERIT Review Meeting: Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug CERN Cryogenics for Experiments Accelerator Technology Department Presented by Adrian.
VRVS, Jan. 2006CERN AB-ATB1 Safety Review Solenoid & Cryogenics CERN AB-ATB VRVS session, Jan
VRVS, Jan. 2006CERN AB-ATB1 MERIT layout in TT2/TT2A/TT10 CERN AB-ATB VRVS session, Jan
Harold G. Kirk Brookhaven National Laboratory MERIT Installation Issues CERN Meeting June 20, 2006.
VRVS session, 8th March 2006CERN AB-ATB-EA1 Layout of Passages between TT2 and TT2A Adrian Fabich, CERN AB-ATB-EA VRVS session, 8.
Collaboration meeting, Ocotober 2005A.Fabich, CERN AB-ATBResponse from the APC, 1 MERIT beam request A.Fabich CERN AB-ATB
1 Roger Erickson 1 Coordination with Accelerator Systems NEH Accelerator Readiness Review Coordination with Accelerator Systems.
13 March MERcury Intense Target (MERIT) Experiment Layout A.Fabich for CERN AB-ATB.
31.March.2004 C. A. Martins, CERN AB/PO 1 Analysis of the possibility of using of a ALICE/LHCb type power converter in TT2A target test by Carlos DE ALMEIDA.
MERIT review, Dec. 2005CERN AB-ATB1 CERN Installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
NFMCC Meeting - 13 March 2006 I.Efthymiopoulos, A.Fabich, CERN AB-ATB-EA1 MERcury Intense Target (MERIT) Experiment Installation Issues I. Efthymiopoulos.
2.April 2004A.Fabich, H.Kirk Summary for proposal of TT2A target test H.Kirk, A.Fabich March 2004 week 9 morning: Cryogenics,
MERIT Experiment Status MERcury Intense Target K. McDonald for the MERIT Collaboration August 30, 2007 TT2/TT2A: MERIT Build.272: Offices & Control Room.
MERIT pre-installation review: Preliminary conclusions A.Fabich.
16.Feb.2005MC meeting, LBNL1 CERN infrastructure A.Fabich, CERN AB-ATB All information available at
Summary of Hg System Review at CERN Van Graves 13 Sep 2005.
MICE Magnetic Field Mitigation Review Potential impact on ISIS of MICE Stray Magnetic Fields 24 th September 2013 Martin Hughes.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
CCC status report 14/12/2004D.Manglunki AB/OP 1 Status of the CERN Control Centre D. Manglunki AB/OP.
Software Tools for Operations and Maintenance Planning Theo Larrieu, Steve Suhring.
LHC ACCESS SYSTEM 1Authors: P, Ninin, S. Grau & LHC access team EDMS: Access System during the LHC Injection tests P. Ninin, S. Grau - TS/CSE Workshop.
Status and plans for online installation LHCb Installation Review April, 12 th 2005 Niko Neufeld for the LHCb Online team.
CCC Commissioning Django Manglunki, AB/OP PS-SPS Days 18/1/2006.
Workshop on the Use of Ethernet as a Fieldbus CERN, 28 September 2001 Use of Ethernet in the control systems of the cooling and ventilation infrastructure.
16th March 2005, ENG target A.Fabich, CERN AB/ATB 1 Status of the TT2A target experiment Status of the TT2A target experiment A.Fabich CERN AB/ATB ENG/BENE.
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
TS Workshop, Archamps, May 24 – May 26, 2005 The LHC Access System Status report – May 2005 P. Ninin & the Access project team TS/CSE.
1.Sep.2004A.Fabich, CERN AB/ATBORNL target workshop Workshop on high power targets at ORNL A.Fabich CERN AB/ATB 1. August 2004 message from the research.
LHC ACCESS SYSTEM 1 Authors: P. Ninin, L. Scibile, T. LadzinskiEDMS: Access Control and Safety System for the LHC Experiments P. Ninin L. Scibile.
1 Zoe Van Hoover 1 User Safety: Commissioning and Early Experiments NEH ARR User Safety: LCLS NEH Commissioning and Early Experiments.
Installation issues - update, July 2006A.Fabich1 MERIT installation: Update July 2006 A.Fabich CERN AB-ATB July 2006.
MERIT Hg System Final Design Review Hg Target System Controls V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma Science &
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
LHC ACCESS SYSTEM 1 Authors: P, Ninin, L. Scibile T, Ladzinski EDMS: The LHC Access System Where do we stand ? P. Ninin, T. Ladzinski, L. Scibile,
Dismantling LEP and the Experiments Access to the underground areas, project organisation, coordination and safety.
East Area, M2, K12 Lau Gatignon / EN-MEF, EATM
TS Workshop, Archamps 4 May 2004 SAFETY AND ACCESS CONTROL Where do we stand ? P. Ninin & the Access project team TS/CSE,
R. Bailey, PS/SPS days, January 2005 Towards the CCC.
AB-CO TC / J. Wenninger1 MCB orbit correctors  There are 752 MCBH(V) SSS orbit corrector circuits.  Individually powered by a ± 60 A, ± 8 V.
Purpose NEW BEAM DUMP TUNNEL Launch Safety Agreement - conventional aspects LIU-SPS external beam dump meeting - C. Colloca DGS/SEE LSA conventional.
Video Room Set Up 4 Major Types of Video Conferencing Solutions.
HIGH RADIATION TO MATERIALS: EXPERIMENTAL AREA HiRadMat Users meeting, 14/7/2011 Outline  Location  Test zone  Test tables geometry and position  Services.
HiRadMat – Users Meeting 29/5/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,
Power controls, Sept. 2006A.Fabich1 MERIT installation: Controls for the 5MW power-supply A.Fabich CERN AB-ATB September 2006.
ATC-ABOPC Days 2008: Session 1 Summary ATC-ABOC days Summary Session; February Session coordinated by B. Mikulec AB-OP and O. Br ü ning AB-ABP Operation.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
MERIT review, Dec. 2005CERN AB-ATB1 CERN installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
CERN Jan 2006 Specific safety Issues for 2006 compared to 2004 P. Cennini AB Safety Requirement in case the Installation activities are going on.
MEF - Machines & Experimental Facilities March 2013 Project meeting Activities in Linac4 tunnel and building in 2013 March 2013 Project meeting 14/03/2013J.Coupard1.
Report on Controls, TCC meeting 23 th June 2005 – Cl.Dehavay & Co - AB/CO/HT 1 Claude DEHAVAY - CERN/AB/CO/HT Installation Readiness Report - Controls.
Status of GIF++ Adrian Fabich, Dorothea Pfeiffer, EN-MEF-LE EATM, 27th August 2013.
KEK, 04/28/061 Safety Plan Assumptions Break out of fire in the Beam Tunnel is negligible Cables in the Service Tunnel is main fire load They are combustible.
HiRadMat status report Adrian Fabich HiRadMat EAM, 4. March 2016 EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th.
How to access CNGS Heinz Vincke for DG-SCR-SL RADWG3/4/
GIF completion status Adrian Fabich, EN-MEF-LE on behalf of the GIF project team GIF users meeting, 14 th January 2015.
GIF++ implementation Adrian Fabich, Sylvain Girod, EN-MEF-LE Technical meeting with Supplier of Irradiator, 3 rd October 2013.
March 2006I.Efthymiopoulos, CERN1 MERcury Intense Target Experiment Installation Issues I. Efthymiopoulos Thanks to: A.Fabich, H.Haseroth, F.Haug, J.Lettry,
Rad. Shield 2 Feb. 06D.LACARRERE1 IP8 POINT 8 – RADIATION SHIELD – UX85 Introduction  History (in brief)  Conceptual Design  Why installation shifted.
PS Complex Controls Renovation S Baird AB/ABP ATC/ABOC Days: Session Jan 2008.
The Next Generation of a Gamma Irradiation Facility GIF++
MERcury Intense Experiment Experiment Layout
Beam Loss and Radiation Working Group: Conclusions
MERIT pre-installation review: Preliminary conclusions
MERIT Review Meeting Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug
MERIT – status and schedule
T-489: Induced Activity and Residual Dose Rates
CSC Electronics Installation and Commissioning Oct ‘06
Presentation transcript:

30th March 2007A.Fabich, CERN AB-ATB1 MERIT - Status of the Experiment A. Fabich CERN AB-ATB MERIT safety review (3)

30th March 2007 A.Fabich, CERN AB-ATB 2 Outline Status of the MERIT control room Status of experimental zone TT2A Schedule Access of personnel and material to TT2/A from ISR Access door D201 Installation during PS operation Access door D202

MERIT control room Located in building S-002 Equipped with 12 Ethernet ports (currently 4 PCs installed and 2 portable outlets) Communicates with the experimental setup in TT2/A ONLY via Ethernet (no hard wires). 30th March 2007 A.Fabich, CERN AB-ATB 3 MCR TT2A

TT2A: Ready for goods reception. 30th March 2007 A.Fabich, CERN AB-ATB 4

Doors D201 for access D202 for emergency exit only Layout of access system by TS/CSE: th March 2007 A.Fabich, CERN AB-ATB 5 D201 D202

Access For Personnel and small material via ISR For heavy goods via the access pit 30th March 2007 A.Fabich, CERN AB-ATB 6 D201

Schedule 30th March 2007 A.Fabich, CERN AB-ATB 7

Access during PS operation During PS operation Radiation monitor in the safety chain of PS operation. Extended “safety” area up to the ISR tunnel Panels: Visual information for area with limited access Ribbon: Indicating area limits Film badge and electronic dosimeter obligatory For a limited time period. AB/OP is informed about the access to TT2A during PS operation. Access will be coordinated with beam operation. L 30th March 2007 A.Fabich, CERN AB-ATB 8

Summary CERN site is prepared for installation and commissioning. Access to TT2A during PS operation is a remaining issue. Schedule is tight. MERIT will be ready for beam time in June/July. The MERIT collaboration thanks all people at CERN involved in the MERIT preparation for their support: TS/EL, AT/ECR, AB/ABP, AB/CO, AB/PO, TS/CE, AT/VAC, TS/IC, TS/CSE, AT/MEL, AB/ATB, AB/SU and safety commission 30th March 2007 A.Fabich, CERN AB-ATB 9