Can we tag on SVT at L2? Bill Ashmanskas, CDF TDSWG meeting, 2001-08-15 SVT has been producing fitted tracks since April Resolution has improved, fake.

Slides:



Advertisements
Similar presentations
Final Commissioning Plan and Schedule Cheng-Ju Lin Fermilab Installation Readiness Review 09/27/2004 Outline: - Work to be done during shutdown - Work.
Advertisements

1 Simulation Status/Plans Malcolm Ellis Sci Fi Tracker Meeting Imperial College, 10 th September 2004.
SVT as a Level 2 Processor Bill Ashmanskas, L2 Trigger Review, Synopsis –Is SVT or the SVT architecture suitable for making L2 decisions? –Are.
Virtual Machines What Why How Powerpoint?. What is a Virtual Machine? A Piece of software that emulates hardware.  Might emulate the I/O devices  Might.
CDF CDF Operations Steve Hahn February 7, 2005 All Experimenters ’ Meeting.
24 September 2002Paul Dauncey1 Trigger issues for the CALICE beam test Paul Dauncey Imperial College London, UK.
Slide 1 FEC Software 21 April 2004 R.Stone Rutgers University Pixel FEC Workshop.
Page 1 Calculating the Beam Position at the Ecal for DESY Run (Independent of Tracking) Hakan Yilmaz.
Summary Ted Liu, FNAL Feb. 9 th, 2005 L2 Pulsar 2rd IRR Review, ICB-2E, video: 82Pulsar
12 May 2005Kroll/Bedeschi1 Plans for B s Mixing B Meeting 12 May 2005 Franco Bedeschi (INFN-Pisa) Joseph Kroll (Penn)
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 DDAQ Trigger o Reminder: DAQ Trigger vs Particle Trigger o DAQ Trigger o Particle Trigger 1) Possible.
SVT L.Ristori1 SVT Workshop July 22, 2003 Summary (1) Minimal upgrade for run IIb silicon –Detailed bit level format for hits from HF’s to Mergers needs.
Using the Trigger Test Stand at CDF for Benchmarking CPU (and eventually GPU) Performance Wesley Ketchum (University of Chicago)
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
Technical review on UPS power distribution of the LHC Beam Dumping System (LBDS) Anastasia PATSOULI TE-ABT-EC Proposals for LBDS Powering Improvement 1.
Factoring – Trinomials (a ≠ 1), Guess and Check It is assumed you already know how to factor trinomials where a = 1, that is, trinomials of the form Be.
TESTING.
Emlyn Corrin, DPNC, University of Geneva EUDAQ Status of the EUDET JRA1 DAQ software Emlyn Corrin, University of Geneva 1.
XTRP Hardware Mike Kasten University of Illinois 2/24/00.
SBS/A1n DAQ status Alexandre Camsonne August 28 th 2012.
SVT workshop October 27, 1998 XTF HB AM Stefano Belforte - INFN Pisa1 COMMON RULES ON OPERATION MODES RUN MODE: the board does what is needed to make SVT.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
CHEMS ANNUAL TRAINING Topics For Today CHEMS CHEMSPRO.
Paired-Sample Hypotheses -Two sample t-test assumes samples are independent -Means that no datum in sample 1 in any way associated with any specific datum.
Lecture 8: Choosing the Correct Loop. do … while Repetition Statement Similar to the while statement Condition for repetition only tested after the body.
Table of Contents Factoring – Trinomials (a ≠ 1), Guess and Check It is assumed you already know how to factor trinomials where a = 1, that is, trinomials.
Cluster Finder Report Laura Sartori (INFN Pisa) For the L2Cal Team Chicago, Fermilab, Madrid, Padova, Penn, Pisa, Purdue.
27 July 2006Trigger Upgrades Review1 Status & Plans of the TDWG Mission Statement What Do We have to Guide Us ? Caveats & Concerns Current & Anticipated.
News Ted & Kirsten June 10, 2005 TDWG. Meet Trigger Reps today? Exotic Trigger Reps: Vadim and Oscar doing great work QCD Trigger Rep: Mary herself EWK.
FADC progress in Vienna Reported by H.Ishino for Vienna FADC group M.Pernicka and H.Steininger.
Operating Systems David Goldschmidt, Ph.D. Computer Science The College of Saint Rose CIS 432.
Svtsim status Bill Ashmanskas, CDF simulation meeting, Main authors: Ashmanskas, Belforte, Cerri, Nakaya, Punzi Design goals/features: –main.
17-Aug-00 L.RistoriCDF Trigger Workshop1 SVT: current hardware status CRNowFinal Hit Finders64242 Mergers31616 Sequencers2312 AMboards4624 Hit Buffers21212.
Studies on stand-alone Si tracking with SVT Alberto, Alessandro, Pierluigi.
The CDF Online Silicon Vertex Tracker I. Fiori INFN & University of Padova 7th International Conference on Advanced Technologies and Particle Physics Villa.
3rd April 2001A.Polini and C.Youngman1 GTT status Items reviewed: –Results of GTT tests with 3 MVD-ADC crates. Aims Hardware and software setup used Credit.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
L2 Upgrade review 19th June 2007Alison Lister, UC Davis1 XFT Monitoring + Error Rates Alison Lister Robin Erbacher, Rob Forrest, Andrew Ivanov, Aron Soha.
Editing Attributes in ArcGIS Attributes – the data in records. e.g A parcel of land might be zone 3A residential. The field = TAG The attribute = 3A In.
Software Engineering 2004 Jyrki Nummenmaa 1 BACKGROUND There is no way to generally test programs exhaustively (that is, going through all execution.
Online Reconstruction 1M.Ellis - CM th October 2008.
SVT workshop October 28, 1998 Online software Stefano Belforte - INFN Pisa1 Online Software Issues Which tasks will be needed for SVT  Operation  Monitor.
L2 Status and Plan Matt Worcester, Heather Ray, Monica Tecchio, Myron Campbell, Jane Nachtman, David Saltzberg, Tom Wright, Steve Kuhlmann, Karen Byrum,
Trigger Commissioning Workshop, Fermilab Monica Tecchio Aug. 17, 2000 Level 2 Calorimeter and Level 2 Isolation Trigger Status Report Monica Tecchio University.
Online monitor for L2 CAL upgrade Giorgio Cortiana Outline: Hardware Monitoring New Clusters Monitoring
New L2cal hardware and CPU timing Laura Sartori. - System overview - Hardware Configuration: a set of Pulsar boards receives, preprocess and merges the.
Pulsar Status For Peter. L2 decision crate L1L1 TRACKTRACK SVTSVT CLUSTERCLUSTER PHOTONPHOTON MUONMUON Magic Bus α CPU Technical requirement: need a FAST.
SVT Nov 7, 2002Luciano Ristori - Vertex2002_7Nov02.ppt1 SVT The CDF Silicon Vertex Trigger Vertex 2002 Luciano Ristori Istituto Nazionale di Fisica Nucleare.
CDF Collaboration Meeting: SVT Status Bill Ashmanskas, U. Chicago SVT Progress Report lWhen you heard from us back in January, this was news.
Main Injector Beam Position Monitor Upgrade: Status and Plans Rob Kutschke All Experimenters’ Meeting April 3, 2006 Beams-doc-2217-v3.
SVT workshop October 27, 1998Stefano Belforte - INFN Pisa1 SVT Vertical Slice Test Goals Schedule Hardware to be tested Software  pre-existing  developed.
L2toTS Status and Phase-1 Plan and Pulsar S-LINK Data Format Cheng-Ju Lin Fermilab L2 Trigger Upgrade Meeting 03/12/2004.
Level 1-2 Trigger Data Base development Current status and overview Myron Campbell, Alexei Varganov, Stephen Miller University of Michigan August 17, 2000.
November 15, 2005M Jones1 Track Lists in Level 2 Outputs from SLAM provide lists of tracks faster than the current path to SVT and Level 2 via XTRP Sparsify.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
Barthélémy von Haller CERN PH/AID For the ALICE Collaboration The ALICE data quality monitoring system.
SVT 4/5 operation CDF meeting 1/16/2003 G. Punzi for the SVT group.
Threads prepared and instructed by Shmuel Wimer Eng. Faculty, Bar-Ilan University 1July 2016Processes.
After Construction Name: Per #:.
Enrico Gamberini for the GTK WG TDAQ WG Meeting June 01, 2016
fields of possible improvement
SVT Improvement (Track counting in GhostBuster board)
The Silicon Track Trigger (STT) at DØ
The Binomial Distribution
M. Krivda for the ALICE trigger project, University of Birmingham, UK
Status of TTF HOM Project Aug 9, 2005
Sector Processor Status Report
PSS0 Configuration Management,
Operating Systems: Internals and Design Principles, 6/E
Chapter 3: Process Management
Presentation transcript:

Can we tag on SVT at L2? Bill Ashmanskas, CDF TDSWG meeting, SVT has been producing fitted tracks since April Resolution has improved, fake rate decreased, as we made improvements. Now  ~  m A few technical problems remain: –Need to limit number of tracks, e.g. via Track Fitter  2 cut (trivial) –Need to correct for beam spot (straightforward, but some work; discussion at end) –Need to solve XTRP synch problem (show-stopper, but intensive effort underway) We are confident SVT can provide good tracks for L2 tagging by September; we should try to make use of the output downstream –Early debugging of highest-BW trigger path –Exercise L2, e.g. every owl shift –Once we cut => enriched sample to study tails, reduce rates –Provides pressure to move both SVT and L2 into “production” state, similar to transition made by SVX after last shutdown

SVT at TDSWG meeting, , page 3 Suggested plan: –SVT sends fake tracks to L2, starting now –TrigMon checks SVTD, TL2D data (BC+tracks), make sure OK over a long period (days) –Implement impact-parameter code in Alpha –Implement options in trigger table GUI –L2 tags on fake tracks (pick whichever single SVT trigger is easiest to code in Alpha) –Debug upstream/downstream of SVT/L2 cable in parallel –When both ends are thought to be working, we switch over to real tracks, repeat checks –This should give us a working impact-parameter trigger at the earliest opportunity –Provides an early stress test of the trigger’s most complex data path –Ensures that software is in place by the time the hardware is ready

SVT at TDSWG meeting, , page 4 About the beam spot: –Luciano’s beam fitter already runs in VME CPU (b0svt06) to fit beam spot in each of 6 bulkheads, every ~10 seconds tested on replayed data during shutdown –Plan is to write beam position data over VME into GhostBuster board, which would apply correction to tracks –Correction would be updated as often as it can be reliably calculated; use double-buffering in GB so that switchover is clean Start from “best guess” when run begins –Read out (x0,y0,x1,y1,…,x5,y5) from GB into every event, so that you always know exactly what correction was applied to a given event –We will have this working and tested before we turn on real data to L2 –If disaster strikes, there are two backup options: Apply correction in Track Fitters Apply correction in L2 processor

SVT at TDSWG, , page 2 Emulated SVT, July 7-8 data