EDM in ER2 at LANSCE Jan Boissevain LANSCE ER-2 Stake Holder Meeting 6-05-03.

Slides:



Advertisements
Similar presentations
ICEoxford Limited. Development of ICE Beam line equipment Copyright © 2011 ICEoxford Ltd Starting Point A simple Continuous Flow (CF) system.
Advertisements

RHIC CRYOGENICS SYSTEM Time meeting /28/20141TIME MEETING RUN 14 –CRYOGENIC.
NPDgamma Liquid Hydrogen Target Safety Review Project and Safety At LANL November 29-30, 2005.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 20, 2009.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
Proposal for Convection Absorber Test with Hydrogen at Fermilab Barry Norris Representing colleagues in BD/Cryogenics February 21, 2003.
11/26/2002Edgar L Black IIT MICE Video Conference November 27, 2002 Summary of safety implementation for proposal.
MICE Collaboration Meeting CM-151 Is the the pulse tube cooler a must or is it simply better for the MICE AFC module? Michael A. Green Lawrence Berkeley.
Current status Arkadiy Klebaner November 21, 2012
TOTEM Collaboration Meeting, Feb. 2005, F. Haug, CERN Cooling System for TOTEM Friedrich Haug and Jihao Wu Cryogenics for Experiments CERN TOTEM Collaboration.
The MICE vacuum system Presented by Mark Tucker at CM-39, 26 June 2014.
The ESS vacuum team has overall responsibility for all technical vacuum systems used on the: Accelerator, Target and Neutron Scattering Instruments and.
NPDgamma Liquid Hydrogen Target Safety Review At LANL November 29-30, 2005.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
LHC Experimental Areas Forum - 03/07/ ATLAS Helium Cryogenics Nicolas Delruelle on behalf of the AT / ECR group.
1 Overview of the NPDGamma Experiment at the Fundamental Neutron Physics Beamline Geoff Greene UT/ORNL.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting Approved Labyrinth Fresh air pulled through “chicken wire” gate.
Conceptual Design Study - Cryogenic Requirements How to decide the layout of ILC cryogenic system Conceptual design of cryogenic system Layout of cryogenic.
’ tall Empty space below this metal sheet 66’ 14’ 4’ 10’ Ceiling tiles = 24 Concrete blocks 14’ long There are two “styles” of Ceiling tile,
U N C L A S S I F I E D Progress Report on the Dual-Use Cryostat John C. Ramsey Los Alamos National Laboratory.
Preliminary HV Results in Superfluid Helium Review of HV system design J. Long, J. Boissevain, J. Gomez, S. Lamoreaux, S. Penttila LANL Amplification and.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
Magnetic Shielding Roy Preece. Issues Cooling channel initially designed without return yolks. Current North and South shielding walls designed to encapsulate.
Cryo AIP Muon Campus AIP Review Arkadiy Klebaner January 23, 2012.
Conceptual Design Review of the NPDGamma Experiment in Beam Line 13 Seppo Penttila NPDGamma project manager September 25, 2007 at SNS.
PIMS IN INSTITUTE FOR NUCLEAR STUDIES Brazing Andrzej Soltan Institute for Nuclear Studies.
ERL: G-5/e-Gun Cryogenic & Pressure Safety Committee Review ERL G-5/e-gun Beam Line Vacuum Failure Analysis April 24, 2009.
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
Hall D Target System Review J. FochtmanSeptember 28,2011 Preliminary Design Work.
Collab 4/15/04 #1 EDMEDM UIUC meeting 12/3/2004 Walter Sondheim, P-25, Los Alamos for presentation to The EDM Collaboration UIUC meeting, Urbana, IL UCN.
EDMEDM EDM Collaboration Meeting 3-06 Jan Boissevain, P-25 March 2, 2006 NCSU EDM Experiment Design Status.
P25 Interface 5/19/08 #1 Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The nEDM Subsystem Managers Duke University,
EDMEDM LANL Review of EDM Cost and Schedule Jan Boissevain for Walter Sondheim, P-25, Los Alamos February 11, 2005, at Los Alamos National Laboratory Conventional.
Hydrogen Pre-Operation Safety Review 4 th October 2011 The Hydrogen Delivery System – An Introduction M Hills.
Yousef I. Makdisi DIS03 St. Petersburg April 24,2003 Polarized Jet target status The overall view The Dissociator stage The Atomic Beam stage The RF transitions.
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
EDM Engineering Issues General Mechanical Considerations EDM Cryostat Plan D ANSYS EMAG Calculations ANSYS MECH Calculations 3 June ‘03 J. Boissevain.
CM28 - Vacuum System Update Matt Hills Mike Courthold 1.
Engineering Approach EDM Collaboration Meeting 2-07 Jan Boissevain.
EDMEDM LANL Review of EDM Cost and Schedule Jan Boissevain, P-25 February 11, 2005, Los Alamos National Laboratory EDM Reference Design Tour of the Reference.
G-2 Cryogenic System Restoration of G-2 Refrigerator for Proposed E969 Experiment WBS 1.11 Tony Nicoletti 2/8/06.
EDMEDM C&S Review 2/11/05 #1 Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to LANL Cost and Schedule Review Committee.
1 Small Coolers for MICE Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Collaboration Meeting RAL.
Technical Readiness Review of the n-3He Experiment Seppo Penttila ORNL P-div At SNS Jan
1 Cryogenic Design and the 4 He Evaporative Purifier David G. Haase, et al., North Carolina State University.
EDMEDM EDM Collaboration Meeting 6-05 Jan Boissevain, P-25 June 20, 2005, Los Alamos National Laboratory EDM Reference Design.
Installation of the T600 at Fermilab CSN2, September 22,
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
Status of Engineering Preparations for CD2/3A nEDM Collaboration Meeting – MIT Bates Jan Boissevain November 2, 2007.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Moving the NPDGamma Experiment to the SNS FnPB Christopher Crawford University of Kentucky overview of NPDGamma transition to the SNS expected.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
ESS Vacuum Systems TAC 6 November 2012 Peter Ladd Senior Vacuum Expert.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
LANL Cost and Schedule Review 02/11/05 1 Cryostat (lower half) WBS 3.1, 3.5, 3.6, 3.7, 3.8, 3.10 Paul Huffman, Chris O’Shaughnessy North Carolina State.
ESS Vacuum Standardization
This talk is not a summary of costs for conventional facilities This talk is Review of conventional facilities used by CDF Discussion of status of systems.
Slides for TAC meeting Oct/2015 Marcelo juni Ferreira Vacuum section leader October,
S A Griffiths CM42 June 2015 Electrical & Control.
Report Technical Director Storage-Ring-Installation Completed
Miscellaneous MEC Topics Mainz, CM September 2016, MEC Session J
Report Technical Director Storage-Ring-Installation Completed
EDM engineering review Oak Ridge, TN , Infrastructure sub-system,
NPDG Liquid Hydrogen Target: Design and Safety Features
Beam Dump Hall Volume Beam Dump Meeting at SLAC May S.Ban
Installation of the T600 at Fermilab
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
XFEL Vacuum System Commissioning
SuperB Integration Summary of previous integration sessions.
Rack Placement Chopper Workshop
Presentation transcript:

EDM in ER2 at LANSCE Jan Boissevain LANSCE ER-2 Stake Holder Meeting

EDM EXPERIMENT ASSEMBLY Purifier 1ºK Pot Pump System 1000 Liter Dewar 3He Polarized Source Perm-alloy Magnetic Shielding (5 Layers) DR Gas Cart & Control Rack DR 3He Pump System & DR 1K Pot Pump System 3He Polarized Source Backing Pump & Gas System Beam Guide & Polarizer Bismuth Filter T0 Chopper EDM Cryostat Cold Head Compressors Steel/Poly Shielding Support Framework

EDM in ER2 Requirements Floor Space Issues –Access for Maintenance operations –Staging area w/ crane coverage for assembly activities –Access to Upper Cryostat –Initial Installation of large components – mobile crane to move items over flight-path 13 –“Counting House” floor space –Vibration Isolation Pad –Crane Path Access across FP12 and FP13

EDM in ER2 Requirements (2) Service Issues –AC Power – 250KVA (see list) –Possible 4He Liquefier/Compressor shed Safety Issues –Emergency Helium Vent (exit out east wall) –Radiation Safety – especially on top of apparatus –Crane Trip (highest point of current design 17’) NPDGamma Issues –EDM T0 Chopper located in Beam Stop –Bismuth Filter inside NPDGamma cave

EDM IN ER2 ELEVATION

EDM Experiment Power Requirements DRS 3000 Dilution Refrigerator32KW 4He Purifier Pump23KW 3He Polarized Source23KW EDM Cryostat33KW Miscellaneous39KW Optional Liquefier50KW Spare Capacity50KW Total 250KW

EDM Experiment Power Requirements (2) DRS 3000 Dilution Refrigerator –3He Circulation/1°K Pot Pump System 4000 M 3 /hr Roots Pump15KW 1000 M 3 /hr Roots Pump (2) 6KW 70 M 3 /hr Dry Backing Pump (2) 5KW –3He Gas System & Controls 6KW 4He Purifier Pump System 4000 M 3 /hr Roots Pump15KW 1000 M 3 /hr Roots Pump 3KW 70 M 3 /hr Dry Backing Pump (2) 5KW

EDM Experiment Power Requirements (3) 3He Polarized Source RDK415D 4°KCold Head9KW Varian V2000 Turbo Pump2KW Varian V1000 Turbo Pump (2)3KW Edwards XDS10 Scroll Pump (3)3KW Pfeiffer Unidry 050 Pump4KW Gas Cart & Instrumentation2KW EDM Cryostat RDK415D 4°KCold Head (3) 27KW Vacuum Pumps6KW

EDM Experiment Power Requirements (4) Miscellaneous Leak Detector2KW HV Power Supply2KW Bismuth Neutron Filter Cold Head 15KW EDM General Controls & Data Acquisition 10KW T0Chopper 10KW