To measure 0, mechanical oscillations of the wire to be tested are induced by applying a periodic high voltage (about 900 V) with a frequency of 300 ÷

Slides:



Advertisements
Similar presentations
Triple-GEM detector operation for high-rate particle triggering W. Bonivento, G. Bencivenni, A. Cardini, C. Deplano, P. de Simone, F. Murtas, D. Pinci,
Advertisements

Drift velocity Adding polyatomic molecules (e.g. CH4 or CO2) to noble gases reduces electron instantaneous velocity; this cools electrons to a region where.
1 VCI, Werner Riegler RPCs and Wire Chambers for the LHCb Muon System  Overview  Principles  Performance Comparison: Timing, Efficiency,
Status of the LHCb RPC detector Changes with respect to Note cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
PNPI in LHCb A.Vorobyov HEPD Scientific Board meeting, December 26,2003 Status report for 2003.
Christine KOURKOUMELIS University of Athens ATLAS Muon Chamber construction in Greece and alignment studies for H  ZZ  4μ decay Como, 8/10/03.
PRODUCTION and CERTIFICATION of Multi Wires Proportional Chambers for the LHCb Muon System at CERN K.Mair for the LHCb Muon Group CERN* Poster anlässlich.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
Production Readiness Review of Frascati MWPC Production Site December 4 th, 2003 – P. Campana.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
Chamber Construction QC at CIEMAT B. de la Cruz CIEMAT (Madrid) CMS Week June 2002.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
G.Bencivenni LNF/INFNMuon Meeting 21-October-2002 Status Report on triple-GEM detector M.Alfonsi 1, G. Bencivenni 1, W. Bonivento 2,A.Cardini 2,C. Deplano.
Construction and quality control of the end-cap Transition Radiation Tracker for the ATLAS experiment Vasiliki A. Mitsou CERN HEP 2003, April, Athens,
PERFORMANCE OF THE MACRO LIMITED STREAMER TUBES IN DRIFT MODE FOR MEASUREMENTS OF MUON ENERGY - Use of the MACRO limited streamer tubes in drift mode -Use.
1 Status of the Test System of the MWPC for the LHCb Muon System Andre’ Massafferri (Universita’ Tor Vergata – INFN sezione II - Roma) V. Bocci, R. Nobrega.
Precision Drift Chambers for the ATLAS Muon Spectrometer Susanne Mohrdieck Max-Planck-Institut f. Physik, Munich for the ATLAS Muon Collaboration Abstracts:
T.Schneider/LHCb Muon EDR
Goals: - To get experience in assembling MWPC on the Wall and prevent possible problems; - To check functionality and stability of different chambers at.
NanoPHYS’12 – December 17-19, 2012 K. Nakano, S. Miyasaka, K. Nagai and S. Obata (Department of Physics, Tokyo Institute of Technology) Drift Chambers.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
Barrel RPC Chamber consists of 2 double-gaps, each equipped with a common plane of 96 strips read-out by 6 front-end boards. The two double- gaps have.
Measuring the Position Resolution of a COMPASS Drift Chamber Prototype Rojae Wright 1, Ihnjea Choi 2, Caroline Riedl 2, Matthias Grosse Perdekamp 2 (1)
TPC R&D status in Japan T. Isobe, H. Hamagaki, K. Ozawa, and M. Inuzuka Center for Nuclear Study, University of Tokyo Contents 1.Development of a prototype.
QGP France sept 2010Sanjoy Pal Performances of the tracking Chambers of the ALICE MUON Spectrometer 1.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
1 A.Andronic 1, H.Appelshäuser 1, V.Babkin 2, P.Braun-Munzinger 1, S.Chernenko 2, D.Emschernmann 3, C.Garabatos 1, V.Golovatyuk 2, J.Hehner 1, M.Hoppe.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
RPCs of BESIII Muon Identifier  BESIII and muon identifier  R&D  Mass production  Installation Zhang Qingmin Advisor: Zhang Jiawen.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Status of MWPC production and quality control The measure of the gas leakage, is obtained by correcting the P(t) behavior by using the data of the reference.
M. Bianco On behalf of the ATLAS Collaboration
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
The RICH Detectors of the LHCb Experiment Carmelo D’Ambrosio (CERN) on behalf of the LHCb RICH Collaboration LHCb RICH1 and RICH2 The photon detector:
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
Precision Drift Chambers for the ATLAS Muon Spectrometer
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
Mauro Iodice INFN Roma (Italy) Hall A Collaboration Meeting - JLAB May 18, 2004.
Gas Quality Checks Maria Luisa Porto Oriented by: Burkhard Schmidt 23/02/2009.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
2002 LHC days in Split Sandra Horvat 08 – 12 October, Ruđer Bošković Institute, Zagreb Max-Planck-Institute for Physics, Munich Potential is here...
Chamber Quality Control Before the construction several checks are performed on:  Panels (cathode and pad PCB)  GEM foil Tests on assembled detector.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
M23 Inner Regions Upgrade with Triple-GEM detectors The EVLGG (Davide, Gianni & Ale) INFN Cagliari LNF Frascati INFN Roma.
15/6/2006Gaia Lanfranchi - LNF-INFN1 Why do we have to measure efficiencies in the Muon Detector? Muon Software Meeting, June 15th G. Lanfranchi LNF-INFN.
Status of production at LNF E.Dane’ and C. Forti – Meeting with LHCb referees Firenze 14-mar-05 Christmas 3 ch/week Ch. 43.
Construction and Characterization of a GEM G.Bencivenni, LNF-INFN The lesson is divided in two main parts: 1 - construction of a GEM detector (Marco Pistilli)
Siena, May A.Tonazzo –Performance of ATLAS MDT chambers /1 Performance of BIL tracking chambers for the ATLAS muon spectrometer A.Baroncelli,
1 PANDA FWD Meeting, GSI-Darmstadt, Preparation of the TDR for the forward tracker University Ferrara + Jagiellonian University, Cracow Main.
14/02/2008 Michele Bianco 1 G.Chiodini & E.Gorini ATLAS RPC certification with cosmic rays Università del Salento Facoltà di Scienze MM.FF.NN.
Precision Drift Tube Detectors for High Counting Rates O. Kortner, H. Kroha, F. Legger, R. Richter Max-Planck-Institut für Physik, Munich, Germany A. Engl,
TOTEM CSC construction and Quality Control Status report A.Krivshich Petersburg Nuclear Physics Institute March 07, 2006 CERN.
Operation, performance and upgrade of the CMS Resistive Plate Chamber system at LHC Marcello Abbrescia Physics Department - University of Bari & INFN,
(On Behalf of CMS Muon Group)
Dept. of Physics and Space Sciences, Florida Institute of Technology
Production ad Quality control of RPCs for the CMS muon barrel system
Atlas: Upgrade Phase I Massimo Della Pietra.
CMS muon detectors and muon system performance
Results from a preliminary analysis of the MWPC test at the GIF
Status of MWPC production and quality control
MWPC prototyping and testing of STAR inner TPC upgrade
LHCb Muon Detector MWPC & GEM
Pre-installation Tests of the LHCb Muon Chambers
Simone Brusa / INFN – Ferrara On behalf of LHCb muon group:
Resistive Plate Chambers performance with Cosmic Rays
Engineering Design Review
Presentation transcript:

To measure 0, mechanical oscillations of the wire to be tested are induced by applying a periodic high voltage (about 900 V) with a frequency of 300 ÷ 400 Hz, between this wire (Cw) and a non- oscillating sense (Sw) wire placed parallel and close to it at a distance d of about 1 mm. The capacitance C between the two wires is given by: where a and b are radii of wires and l is the SW length. Abstract The main goals for the Muon System of LHCb (presentely under construction) is to provide a high-P t muon trigger at the first experiment trigger level (Level-0) and a very good muon identification in the off-line analysis. The performance needed for the level-0 trigger results in very stringent requirements on the quality of the Muon System detectors. We report the status of the production of the Multi-Wire Proportional Chambers for the LHCb Muon System and we describe the test systems for the quality control adopted in the production sites. After wire winding and gluing the wire pitch is measured by means of digital cameras with a precision of about 20 μm. For the evaluation of the wire mechanical tension two systems were developed which find the wire mechanical resonance frequency. A resolution of about 1 g is obtained in both cases. Once all elements of the chamber are assembled the gas tightness of the detector is verified by monitoring the decrease of an overpressure applied. After a suitable high voltage conditioning the dark current is recorded and the gain uniformity of each gap is measured by acquiring the currents drawn by four gaps, while scanning the detector surface with a 137 Cs source. Finally, the detectors are equipped with the front end electronics and their detection efficiency and time resolution are tested using cosmic rays. Test with cosmic rays The use of a cosmic ray stand allows to measure the performances of the chambers produced. The system allows to house and test up to 6 chambers fully equipped at the same time (600 FEE channels). Example of the cosmic ray illumination of a chamber Conclusions The systems for the test of the Multi-Wire Proportional Chambers at production sites result to be very useful for the mass production. The performance achieved in the measurement of the wire pitch and wire mechanical tension allows to check, with the needed accuracy, the quality of the wire winding before chamber assembling. The gas leakage can be measured with the sensitivity required. Once the chambers are closed and conditioned, the study of the gain uniformity inside each gap gives a fast feedback on the quality of the chamber, allowing to tune the assembly procedure. Test with cosmic rays gives the possibility to study in detail the efficiency and time perfomance of the chambers. 460 chambers have been already assembled and tested and all of them satisfy the requirements on gain uniformity. Production and test of the LHCb Muon Chambers D. Pinci 1 and A. Sarti 2 on behalf of LHCb 1 Università di Roma “La Sapienza” and INFN sez. Roma1, Italy 2 INFN-Laboratori Nazionali di Frascati, Italy The LHCb experiment is dedicated to the study of the decays of the beauty hadron. In many of these decays muons are present in the final state so that muon triggering and identification is important. The LHCb Muon System will be composed of 5 stations (for a total active surface of 435 m 2 ) equipped with 1380 Multi-Wire Proportional Chambers of 20 different sizes. The LHCb level-0 trigger, based on a 5-fold coincidence within 25 ns, requires a fast and precise ( 99%) in 20 ns and good spatial resolution for the detectors. The LHCb MWPCs were designed in order to fulfill all those requirements and are now under construction in different sites: CERN (CH), Ferrara (ITA), Firenze (ITA), Frascati (ITA) and San Petersburg (RU). The chambers in the stations M2-M5 are made by 4 layers (gaps) while the chamber in M1 will comprise only two gaps. Each gap is 5 mm high with an anode plane in the middle made by 30 μm diameter wire with a pitch of 2 mm. The gaps are filled with an Ar/CO 2 /CF 4 (40/55/5) gas mixture and will work at a gain of about 5x10 4. The wire position is precisely determined by the pitch of the wiring machine combs, however it is important to check that no wire is out of the acceptance. The range 2 mm ± 50 µm corresponds to the red lines drawn at 211 ± 5 pixels. The WP measurement is performed with an automatic device, based on two TV cameras scanning the panel and a software for image acquisition and analysis. An accuracy of about 20 µm is obtained. The requirement on the wire pitch (WP) is: WP = 2 mm ± 50 µm (95% of wires) ± 100 µm (5% of wires) Wire pitch measurement Wire tension meter The wire mechanical tension must be in the range 50÷90 g in oder to provide a good electrostatic stability. The wire tension  can be found by measuring its mechanical resonance frequency 0 with the formula: The oscillations result in a variation of C. The maximum variation of C occurs at the mechanical resonance of the chamber wire. Gas leakage test In order to minimize the gas refill rate, the maximum leakage allowed for each chamber is 2 mbar/h.  : mass per unit length of the wire l: length of the wire The 4 gaps The use of a high yielding and fast gas mixture allows to achieve very good time performance in proportional mode operation. Typical time-spectrum of a four-gap chamber shows an rms lower than 4 ns. The Muon System of LHCbThe Multi-Wire Proportional Chambers for LHCb chamber time spectrum 137 Cs source case (LNF) Profile view of a MWPC on the source test table. Uniformity of the gas gain is tested with a radioactive source. The current drawn by each gap is monitored while the lead case containing the source is moved by means of a mechanical arm. These measurements allow to check the gain uniformity within each gap and to compare different chambers among them. Gap gain uniformity Muon stations Production and test summary The requirements that each double-gap must satisfy are: - efficiency in 20 ns higher than 95%; - average pad-cluster size lower than 1.1; These requirements define the limits of the HV working region. During tests at CERN beams, a working region width of about 170 V was found. A detailed numerical calculation of the dependence of the electric field on the MWPC mechanical parameters (e.g. wire position and mechanical tension) was performed in order to provide the requirements for the chamber production. allowed range A resolution of about 1 g is obtained and a panel (660 wires) can be checked in less than 1 hour. To verify the gas tightness of a chamber, we inflate it with nitrogen up to an overpressure P of 5 mbar, with respect to the atmospheric pressure. Then, we record the P decrease as a function of time, during about one hour. The measurement is heavily affected by variations of the temperature. In order to correct this effect, a second chamber is used as a reference. The measure of the gas leakage, is obtained by correcting the P(t) behavior by using the data of the reference chamber. Current (nA) X position in the gap Y position in the gap Example of a result of the scan with radioactive source Measurements of the wire pitch “M3R3” chamber 37 cm 140 cm In M2-M5 the four gaps are ganged in pairs. In a pair (double-gap), the signals from corresponding pad (wire or cathode) are added together via a simple wire-OR and sent to FE electronics. A further logical OR between the two double-gaps is performed by the electronics. rms = 4 ns About 460 MWPCs have been already built. In the last six months the production has been keeping the scheduled rate. It should be possible to install all M2-M5 and a sizable part of M1 for 2007 data taking. The production phase is foreseen to finish in April The quality control systems have shown to operate well and to be able to provide a fast and reliable feeback on the quality of the detectors assembled. An alternative method was developed by the University of Ferrara, Firenze and Roma “Tor Vergata”. Wire oscillations are induced via a mechanical excitation. A laser beam, reflected by the wire under study is recorded by a photodiode. From a simple Fourier analysis the resonance frequency is obtained. This method allows to measure 1 wire/s. Laser Photodiode wire Machanical excitation Panel The panel winding provides very good quality panels. In average only about 1 wire over 4000 has to be replaced because pitch or mechanical tension were out from the allowed range. The measurement of gas leakage showed the required sensitivity. Less than 5% of the chambers had a gas leakage which has been found and fixed in all cases. An automated conditioning procedure allows to bring all chambers to a voltage of 2.9 kV, well above the working point, withuot demage. In all cases a residual dark current of less than 5 nA per gap was found. The results of the measurement of the gas gain uniformity on the double-gaps surface are shown in the plot. The gain spread defined as the maximum between G max /G 0 and G 0 /G min should be less than 1.4. No one chamber has shown both the gaps with a gain spread higher than that limit. allowed limit Sample image from scanning device The chambers are equipped with the CARIOCA read-out electronics. Signals are acquired by VME TDCs allowing efficiency, cluster-size and time resolution studies. A trigger system based on three large plastic scintillators gives the trigger signal and the reference time with a jitter of about 2.8 ns.