IBEX-lo 2015 Ops and ISN Overview D. Heirtzler et al, UNH/SSC IBEX SWTM August 2015 1 D. Heirtzler, A. Galli, K. Fairchild, H. Kucharek, T. Leonard, E.

Slides:



Advertisements
Similar presentations
Update on Data / MC Comparisons for Low Hadronic Energy CC-like Events Reminder of problem Fiducial studies with more MC statistics Effect of offset in.
Advertisements

Troubleshooting Training Course.  Visual and General Test  Perform System Test (Mode  Perform System Test)  Identify The Error  If you need Technical.
U N C L A S S I F I E D Operated by the Los Alamos National Security, LLC for the DOE/NNSA Pitch angle evolution of energetic electrons at geosynchronous.
Rachel Klima (on behalf of the MASCS team) JHU/APL MASCS/VIRS Data Users’ Workshop LPSC 2014, The Woodlands, TX March 17,2014 MASCS/VIRS Data Record Structure.
PHEOS PSRR Concept of Operations. 2 Scope The purpose of the PCW-UVI Concept of Operations (ConOps) is to communicate how mission systems will operate,
RHESSI/GOES Observations of the Non-flaring Sun from 2002 to J. McTiernan SSL/UCB.
Checking the Acd hardware veto setting The hardware veto is generated in the front-end electronics Discriminator with coarse and fine settings Both are.
IMPACT Report SSMO Receiving Review– January 23, 2007.
Mar 31, 2005Steve Kahn -- Ckov and Tof Detector Simulation 1 Ckov1, Ckov2, Tof2 MICE Pid Tele-Meeting Steve Kahn 31 March 2005.
GLAST LAT ProjectDOE/NASA CD3-Critical Design Review, May 12, 2003 S. Ritz Document: LAT-PR Section 03 Science Requirements and Instrument Design.
Bill Atwood - July 2002 GLAS T 1 A Kalman Filter for GLAST What is a Kalman Filter and how does it work. Overview of Implementation in GLAST Validation.
FPIX0 Electronic Test Marina Artuso Paul Gelling Jianchun Wang  The system works fine with charge injection calibration  Gain curve, threshold, and noise.
CFT Calibration Calibration Workshop Calibration Requirements Calibration Scheme Online Calibration databases.
Update on the Time-of-Flight and Position Resolution Measurements in the Proposed Detectors and Cost Estimates – August 2014 WILLIAM TIREMAN NORTHERN MICHIGAN.
Special Products Section 6.4. Find the product. (x + 2)(x + 2) (x + 3)(x + 3)
May 15, 2013 Space Weather Product Team (SWPT) Making Sense of the Nonsensical.
U.S. Energy Information Administration Independent Statistics & Analysis ERUS 2014 Bulk Power and Reliability Proposed Changes to Form EIA-411.
1 S. E. Tzamarias Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Readout Electronics DAQ & Calibration.
Van Allen Probes Spacecraft Operations July 29, 2015 Kristin Fretz
STB CIR events #17,19,20,22 are from period Dec 2007-Feb 2008 (Bucik et al., AnGeo, 2009) these two bursts periods show an excess in number of counts beyond.
MG 1/10/01 1 PCS SMOV-3B Review Objectives Overview Activity Descriptions Requirements.
1 “STEREO PLASTIC STATUS REPORT” A.B. Galvin Lorna Ellis (Data) Mark Popecki (Operations) Team (Science) STEREO SWG Meredith NH October 27, 2009.
Update on the new reconstruction software F. Noferini E. Fermi center INFN CNAF EEE Analysis Meeting - 14/09/20151.
Friday, April 23, 2004University Udine, Italy Razmick Mirzoyan MPI Munich Where do we stay after having seen the first signals from Crab and Mrk-421 ?
CODIF Status Lynn Kistler, Chris Mouikis Space Science Center UNH July 6-8, 2005 Paris, France.
Presented by A.B. Galvin STEREO SWG NOAA Boulder, Co 22 March 2004 PLASTIC Activities.
RTF Update Kevin Smit Kelly Tarp ProCost Version 3.0 Modifications A registered professional engineering corporation with offices in the Seattle,
An assessment of the NRLMSISE-00 density thermosphere description in presence of space weather events C. Lathuillère and M. Menvielle The data and the.
Ch. 9 Molecular Geometry & Bonding Theories
SS Space Science MO&DA Programs - August Page 1 ACE Instrument Status Report Cosmic Ray Isotope Spectrometer (CRIS) Normal Operation. Electron Proton.
Improving Detection Efficiency of a Space-based Ion Mass Spectrum Analyzer Anne Lamontagne, University of New Hampshire; Mark Popecki, UNH; Lynn Kistler,
Background Simulations for the LHCb Beam Condition Monitor Overview: ● The LHCb Beam Condition Monitor (BCM) – Purpose, Design and Function – Implementation.
Nh-j-lorri-2-jupiter-v2.0 nh-j-lorri-3-jupiter-v2.0 nh-x-lorri-2-launch-v2.0 nh-x-lorri-3-launch-v2.0 Matthew Knight PDS review 8/19/14.
Searching for Gravitational Waves from Binary Inspirals with LIGO Duncan Brown University of Wisconsin-Milwaukee for the LIGO Scientific Collaboration.
Mission Operations Review February 8-10, 2010 Cordoba, ARGENTINA SECTION 16.x Aquarius Science Commissioning and Acceptance Draft 2 Prepared by: Gary Lagerloef,
Do the NAM and GFS have displacement biases in their MCS forecasts? Charles Yost Russ Schumacher Department of Atmospheric Sciences Texas A&M University.
Jin Huang, Xin Qian For Transversity Analysis Meeting May 3, 2010.
C H A M P International Laser Ranging Service - General Assembly, October 2005 Eastbourne, UK L. Grunwaldt, R. Schmidt, D. König, R. König, F.-H. Massmann.
SPI-ACS EM MeasurementsCornelia Wunderer, MPESPI-Team Meeting, Paris, SPI - ACS EM Scientific Measurements August 19 - September 4, 1998 at.
2000/9/23 JPS meeting in Niigata1 Measurement of single gamma and  0 with PHENIX EMCal (I) H.Torii Kyoto Univ./RIKEN for the PHENIX Collaboration. Sep/23/2000,
P. Mokashi IES Team Meeting, SwRI 29 May IES (SwRI) Develop sequences (flight and EQM test) Develop tables, macros and patches if necessary Test.
Jin Huang M.I.T. For Transversity Collaboration Meeting Jan 29, JLab.
1 The IBEX-HI SensorVoyagers in the Heliosheath Conference, January 12, 2009 January 12, 2009 Voyagers in the Heliosheath Kauai, Hawaii. The IBEX Hi Sensor:
R119 Analysis Overview Joel Sander for numerous people.
CIS Action Items 10 th Cross-Calibration Workshop Observatoire de Paris, Nov
8th Cross-calibration Workshop CIS data delivery report Kinsale – October 2008.
Estimating Rainfall in Arizona - A Brief Overview of the WSR-88D Precipitation Processing Subsystem Jonathan J. Gourley National Severe Storms Laboratory.
Fermi Gamma-ray Burst Monitor
3/06/06 CALOR 06Alexandre Zabi - Imperial College1 CMS ECAL Performance: Test Beam Results Alexandre Zabi on behalf of the CMS ECAL Group CMS ECAL.
10/8/ HMPID offline status D. Di Bari, A. Mastroserio, L.Molnar, G. Volpe HMPID Group Alice Offline Week.
CODIF CORSS-CALIBRATIONS C. Mouikis, L. Kistler, K. Genestreti UNH 10th CAA Cross-Calibration meeting L'Observatoire de Paris, Paris, 2-4 November 2009.
26th Oct 2006CAA cross cal meeting, MSSL RAPID Calibration Status RAPID team.
CODIF Calibration Status Lynn Kistler Space Science Center UNH Mar 25-27, 2009 Cambridge, UK.
10th CAA Operations Review Annual Report of the CIS Experiment
GLAST Large Area Telescope:
Solar Wind Core Electrons
Verifying the DCC methodology calibration transfer
1G. Nicolaou, 1M. Yamauchi, 1,2H. Nilsson, 1M. Wieser, 3A. Fedorov, 1D
MODIS Characterization and Support Team Presented By Truman Wilson
° status report analysis details: overview; “where we are”; plans: before finalizing result.. I.Larin 02/13/2009.
Calorimeter calibrations with Flight Software.
Write each fraction in simplest form
Hongming Zhang EMS Applications Manager, PEAK RC
Implementation of DCC algorithm for MTSAT-2/Imager
SOS Cerenkov Purpose: provide PID for NA Cerenkov efficiency studies
goes-16/17 abi lunar calibration
Revolution vs. Rotation
Studies of the Time over Threshold
° status report analysis details: overview; “where we are”; plans: before finalizing result.. I.Larin 02/13/2009.
Status of the cross section analysis in e! e
Presentation transcript:

IBEX-lo 2015 Ops and ISN Overview D. Heirtzler et al, UNH/SSC IBEX SWTM August D. Heirtzler, A. Galli, K. Fairchild, H. Kucharek, T. Leonard, E. Möbius, M.Quinn, N. Schwadron

2015 IBEX-Lo Overview Overall Operations –IBEX has operated nominally during 2015 (so far) No abnormal HV behavior, PAC 7kV MCP responsiveness remains effectively unchanged from previous years. One incident of “Orange” space weather conditions did not adversely effect the instrument. The IBEX-lo low voltage current monitor follows count rates and is an indicator for strong SEP events as well as normal high backgrounds. –Planning has begin for remainder of 2015/2016 D. Heirtzler et al, UNH/SSC IBEX SWTM August

IBEX-Lo MCP Gain testing Last run in orbit 267b –Results normal, no indication of gain loss D. Heirtzler et al, UNH/SSC IBEX SWTM August This year’s gain test planned for Orbit 309 higher than 15 R e

IBEX-Lo Maps Currently there are 3 Map corrections 1.Geometric Correction 2.Bootstrap Correction 3.Oxygen Sputtering Correction Only 2 and 3 are implemented in the 5 year and trial 7 year maps. Different corrections needed for different phases of the mission: D. Heirtzler et al, UNH/SSC IBEX SWTM August

ISN Goodtimes List The ISN goodtimes list has been updated through orbit 279a –Orbit 9-26 (2009) –Orbit (2010) –Orbit (2011) –Orbit 147a-160b (2012) –Orbit 193a-198b (2013) –Orbit 233b-239a (2014) –Orbit 271b-279a (2015) ISN goodtimes expanded to include Warm Breeze Orbits D. Heirtzler et al, UNH/SSC IBEX SWTM August

2015 ISN Season Pointing (1/3) D. Heirtzler et al, UNH/SSC IBEX SWTM August

2015 ISN Season Pointing (2/3) D. Heirtzler et al, UNH/SSC IBEX SWTM August

2015 ISN Season Pointing (3/3) D. Heirtzler et al, UNH/SSC IBEX SWTM August

ISN 512spin Data Products (1/5) For periods within the ISN goodtimes: –Accumulated direct event data that meet the following criteria: 1.Golden triples 2.“Hydrogen” time-of-flight 3.Energy Steps 1-3 are included during non-special mode periods. –Histogram bin data coincident with direct event times above, accumulated into 512 spin periods (approx 2 hours) D. Heirtzler et al, UNH/SSC IBEX SWTM August

ISN 512spin Data Products (2/5) ISN data products: –For each contiguous time in the ISN goodtimes list: 1 row for each of the 60 6° anguar bins indicating the center angle for a given bin Start time for each 512 spin period (GPS time) End time for each 512 spin period (GPS time) Total accumulation time (sanity check) Histogram counts for each angular bin Direct Even counts for each angular bin –Data files are in comma separated value (csv) format D. Heirtzler et al, UNH/SSC IBEX SWTM August

ISN 512spin Data Products (3/5) ISN data product sample: D. Heirtzler et al, UNH/SSC IBEX SWTM August angular bin center GPS Start time histogram bin counts angular bin center (sanity check) direct event counts

ISN 512spin Data Products (4/5) ISN data product QA checks: –All ISN season orbits are checked for contaminating backgrounds around the ISN peak itself. Times with high backgrounds are eliminated. Background threshold for this test is determined orbit by orbit using sample quiet times. Times when the TOF 2 rate exceeds this background by 60% are excluded. Times with spin issues are excluded Times with special operations are excluded (gain tests, etc…) –Remaining times are included in ISN data products –Resulting ISN data products are checked for continuity (time and angle), and suppression (loss of direct events due to instrument throttling). D. Heirtzler et al, UNH/SSC IBEX SWTM August

ISN 512spin Data Products (5/5) Sample ISN Background goodtimes determination D. Heirtzler et al, UNH/SSC IBEX SWTM August

ISN 512-Spin Data Release ISN data for 2009 and 2010 have been released to the public. ISN data for 2011 – 2014 have been released to the team and will be released to the public following the upcoming ApJS Special Section. ISN data for 2015 have been generated and passed QA checks and will be released to the team. –2015 data will be further validated during upcoming science investigations. D. Heirtzler et al, UNH/SSC IBEX SWTM August

ISN Suppression Issues (1/2) Some time periods show higher than expected direct event suppression in the ISN peak. D. Heirtzler et al, UNH/SSC IBEX SWTM August Direct event suppression between 55-70% in the peak.

ISN Suppression Issues (2/2) Some time periods show higher than expected direct event suppression. D. Heirtzler et al, UNH/SSC IBEX SWTM August