Scheduling CTC-370. Value Engineering Provides alternatives to the proposed design –Save Owner $$ –Must be as good or better than original design –Must.

Slides:



Advertisements
Similar presentations
Chapter 6 Practical Methods to Reveal CPM Covert Activities
Advertisements

Copyright © 2009 T.L. Martin & Associates Inc. Chapter 4 Standard CPM Smoke and Mirror Tricks (Manipulations)
DISTRICT FIVE CONSTRUCTION CONTRACT ADMINISTRATION UPDATE TRAINING Submission of Working Schedule Specification SP A.
Management Information Systems [MOIS470]
TIME MANAGEMENT 641 Topic 03 Activity Sequencing.
Software Process Models
CSSE Sep.2008 Constructing and Analyzing the Project Network Diagram Chapter 6.
Advanced Project Management - CPH
Scheduling The Project  Scheduling Planning, budgeting and scheduling are all part of the same process Planning a project, developing a budget for it,
CSSE 372 Week 6 Day 2 Constructing and Analyzing the Project Network Diagram  PERT Chart PERT was invented for the Nautilus submarine project. Ok, maybe.
Resource Planning. 51 Resource Planning Estimating Schedule Activity Resource Requirements Determining what resources will be required (labor, equipment,
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
5 december 2011 Living Probabilistic Asset Management Dr.ir. J.A. van den Bogaard.
Copyright © 2009 T.L. Martin & Associates Inc. Chapter 2 Key CPM Scheduling Terms.
Scheduling & Resource Planning CTC-415. Schedule Compression Used to decrease schedule time –At what price? Does cost of compression outweigh liquidated.
Projmgmt-1/23 DePaul University Tracking the Progress of Your Project In MicroSoft Project Instructor: David A. Lash.
Reviewing & Analyzing Schedule
Time Management Ahmed Awad, Ph.D., PMP. Time Management It includes the processes required to ensure timely completion of the project. b Activity Definition.
1 ®  Overview Benefits of a Good Construction Schedule Baseline Schedule Development Schedule Updating and Maintenance Managing Project Changes USACE.
Scheduling CTC-415. Activity Network Development Network Models Activity on Node Precedence Diagram Method Activity on Arrow Network Characteristics Discrete.
Construction Scheduling and Estimating.  Someone gets an IDEA  The IDEA inspires a PLAN to be created  The PLAN is used to build the SCHEDULE  The.
Copyright © 2009 T.L. Martin & Associates Inc. Chapter 3 Requirements of a realistic CPM schedule.
Client Logo LEAN ENTERPRISE Implementation Workshop.
Amin Salari, CCM, PMP, LEED AP – Lundgren Management
5.1 Principles of Project Management. So what is Project Management? Definition: Is the process of planning, organizing, and managing tasks and resources.
Field Questions. –Asked by sub or GC when discrepancy in construction docs or existing site conditions Design change verification request Field information.
Copyright © 2009 T.L. Martin & Associates Inc. Chapter 5 Advanced Techniques of CPM Deception and Mystery.
EGNR 300 Project Management Planning & Scheduling ENGR 300 Dept. of Computer Science and Engineering University of Bridgeport,
Planning and Scheduling. Project Planning –Selecting Construction Methods and sequence of work –Must complete planning before doing scheduling –Steps.
Managing Engineering Design - Infrastructure. Presentation Overview 1.Tools and Techniques 2.Design and Documentation 3.Estimating and Scheduling.
1 L U N D S U N I V E R S I T E T P rojektledning och Projektmetodik.
Project Time Con trol. Control = Monitor + Compare + Analysis + Action  Definition: Controlling  Controlling involves making sure that the results achieved.
King Fahd University of Petroleum & Minerals
Project Life Cycle.
The Health Care Center Dauphin County, PA Ken Lorenz Penn State University Architectural Engineering Construction Management April 17, 2007.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
11/9/2015 9:42 AM 1 Project Time Control. 11/9/2015 9:42 AM 2  Controlling involves making sure that the results achieved are in line with the planned.
Copyright © 2003 Primavera Systems, Inc Primavera User Conference Schedule Bingo presented by Mike Stone w/Professional Project Management Services.
Advanced Topics CTC-470. HR Management Development of project management organization –Job description Major tasks and duties Determines compensation.
1 EASTERN MEDITERRANEAN UNIVERSITY FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING CIVL 493 Construction Management Assoc. Prof. Dr. Ibrahim YITMEN.
Improved Project Control Through CPM Scheduling What Owners, PM’s and CM’s Need to Know t H E T I B U R O N T I B U R O N G R O U P, L L C G R O U P, L.
Project Time Management Ashima Wadhwa. Schedule Development – Determining start and finish dates for project activities – Without realistic dates, project.
Scheduling. Putting the activities in chronological order –Chicken or the egg Allows the PM to determine the time required to complete a project.
Lessons Learned – Schedule Updating and Maintenance using Primavera P6 Hannah Schumacher, PSP, PMI-SP, LEED AP Hill International Charlie Jackson, PSP,
BSBPMG508A Manage Project Risk 11.6 Monitor and Control Risks Adapted from PMBOK 4 th Edition InitiationPlanning ExecutionClose Monitor Control The process.
CLAIMS MANAGEMENT. PRESENTATION OUTLINE INTRODUCTION TYPICAL CLAIMS AGAINST OWNER TYPICAL CLAIMS AGAINST CONTRACTOR CRITICAL PATH METHODS UTILIZATION.
Fundamentals of Project Control Chapter 11 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project.
SOFTWARE PROJECT MANAGEMENT
Managing Schedule Slack/Float PMI Scheduling Forum January 6, 2015 January 6, 2015 Presented by: Ric Albani, PMP, PMI-SP, PMI-RMP, MCTS.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
VA Primavera P6: Baselining the Project Department of Veterans Affairs Office of Information and Technology IT Workforce Development (ITWD) in collaboration.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
The Construction Process TimeCost Linked Schedules Linked Estimating Recipes The Building Model: 5D Concept.
SCHEDULE MANAGEMENT MODULE 8. Required by Specification City/Caltrans Level 1 schedule – simple Less than $1 million, less than 100 working days Advanced.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Procuring Professional Services
Establishing and Managing a Schedule Baseline
Exercise 1: Escoger proyecto……….
TOPIC-8A- PROJECT TIME CONTROL
(Additional materials)
MS Project 2016 Level II
Guide to Project.
MGT 605: CH-13 Progress and Performance Measurement and Evaluation
Fine-Tuning your plan and obtaining approval
Managing Project Work, Scope, Schedules, and Cost
Conventional Facilities
Second Avenue Subway Project Execution Strategy
CHAPTER ONE: RESOURCE ALLOCATION AND SCHEDULING
Presentation transcript:

Scheduling CTC-370

Value Engineering Provides alternatives to the proposed design –Save Owner $$ –Must be as good or better than original design –Must save enough $$ so that contractor can recover his cost of doing VE –Usually comes from contractor’s or engineer’s previous experience

Value Engineering Can save $$ either due to savings in time or materials –Ex: Composite Wall and roofs –Material cost per sf is higher than regular roof –Labor cost is lower –Requires a crane

Value Engineering Ex: –Replace infiltrators with Eljen In drains System size is reduced to 50% Also reduces amount of sand, clay, topsoil Reduces dozer time and installation time In-drain costs about 2x infiltrator

Updating Schedule Frequency –Depends on Complexity –More complex -> more updates Unexpected events –Update after event to determine new completion date –Helps team evaluate strategies to mitigate impacts When specified –By contract documents

Updating Schedule How –Gather Activity Status Info Update Date – when the info is gathered Activity status –Actual start date – meaningful work begins –% complete »Work in place -> work in place/planned work quantity »Time expended -> time expended/ planned duration (only good for time dependent activities like concrete curing) »Cost Incurred - >cost incurred/planned cost (depends on actual resource productivity being constant and resource costs not varying) »Resource used -> Resource Used/Planned resource amount

Updating Schedule How –Activity status –Remaining duration – Remaining Work quantity/Anticipated Productivity –Actual finish date – all completed activities »Provides data for future jobs –Gathering Data Direct observation, Update meetings, field reports, turnaround reports, photos and videotape

Analyzing Schedule Status What is the basis for evaluating schedule status? –Usually the original schedule is the baseline What is planned completion date –Is updated schedule completion date same as baseline If not – why not (is there an error)

Analyzing Schedule Status Has the critical path shifted? –If so – why –Are CP activities really “critical” Has the float changed on any activities? Has weather become a factor for any activity Are there trends worth watching Any changes since last update?

Modify and Revise Schedule Revise network logic –Change duration to meet contracted completion –Reflect changes in planned means and methods for completing activity –Shift activity to better time (summer for concrete)

Modify and Revise Schedule Revise Activity Durations –Planned quantity of work has changed –Amount of resources has changed –Productivity is either higher or lower than planned Add & Delete Activities –Scope of work changed –Activities divided into smaller activities

Review and Analyze Schedule Make sure new schedule does not contain errors Implement updated schedule

Out of Sequence Work Why? –Keep crews busy –Preparatory work starts early Gives crew a chance to test means and methods Preserve Schedule Logic –Shorten successor activity caused by out of sequence work –Keep all other logic intact