JTLS International User Conference JTLS Future Ellen Roland.

Slides:



Advertisements
Similar presentations
16th JTLS International Users Conference
Advertisements

1 Microsoft Access 2002 Tutorial 9 – Automating Tasks With Macros.
Software Engineering CSE470: Process 15 Software Engineering Phases Definition: What? Development: How? Maintenance: Managing change Umbrella Activities:
11.1 Lecture 11 CASE tools IMS Systems Design and Implementation.
Automating Tasks With Macros
Cornell University Library Instruction Statistics Reporting System Members: Patrick Chen (pyc7) Soo-Yung Cho (sc444) Gregg Herlacher (gah24) Wilson Muyenzi.
Academic Advisor: Prof. Ronen Brafman Team Members: Ran Isenberg Mirit Markovich Noa Aharon Alon Furman.
Automating Tasks With Macros. 2 Design a switchboard and dialog box for a graphical user interface Database developers interact directly with Access.
1 Kingdom of Saudi Arabia Prince Norah bint Abdul Rahman University College of Computer Since and Information System NET201.
Automating the Corrective Action Plan Allison Miles State of Pennsylvania.
Navigating uncertainty JTLS User Conference 2011 Monterey, CA EXONAUT – MASTERING CHAOS 1 Mikael Edqvist Vice President, Business Development
The Project AH Computing. Functional Requirements  What the product must do!  Examples attractive welcome screen all options available as clickable.
Template For Building Project Schedule Jazz Presentation.
Next Generation Trnsport Trnsport Users Group Conference Field Management TAG November 7, 2005.
ArcGIS Workflow Manager An Introduction
An Introduction to Concept Mapping. What Is Concept Mapping? l Is a structured process l Focuses on a topic or construct of interest l Involves input.
S/W Project Management
Dillon: CSE470: SE, Process1 Software Engineering Phases l Definition: What? l Development: How? l Maintenance: Managing change l Umbrella Activities:
Transaction Processing Systems and System Development Life Cycle
User Group Priorities for Development. Assumptions ER system still remains in place –Capture individual user input –Repository of good ideas that will.
JTLS International User Conference
JTLS 5.0 Version Description. Currently –Contract With JS/J7 Research and Development – Ends May 2013 –Contract With PACOM Through Booz Allen Development.
WELCOME! July 2015 ROLANDS & ASSOCIATES Corporation 1.
Setting Your Fees Project Cost and Setting Your Fees.
1/17UNCLASSIFIED JTLS in Turkey. 2/17UNCLASSIFIED *Introduction to Atatürk Wargaming and Convention Center *Transformation of JDDETC into MJWC *What We.
JTLS Air Tasking Order Generator Ellen Roland ROLANDS & ASSOCIATES 16 th JTLS International Users Conference 4 March 2014.
Lecture 3 Software Engineering Models (Cont.)
A Genetic Solution to the Travelling Salesman Problem Ryan Honig.
HIGH INTENSITY DRUG TRAFFICKING AREA FINANCIAL MANAGEMENT DATABASE PROJECT.
JTLS International User Conference Introduction To JTLS 5.0 Mrs. Ellen Roland.
Joint Theater Level Simulation Tablet Research Project.
Overview & High Level Plan Date: Team: Todd Kaywood, Alex Wiechers, Andy Idema.
Lecture Introduction to Software Development SW Engg. Development Process Instructor :Muhammad Janas khan Thursday, September.
Feasibility study A feasibility study is a preliminary investigation of a problem. It is used to decide whether a solution is possible and what effects.
Project-X 3.0 Quality Criteria. QA Criteria Milestones Ø System Integration Complete (September) ùReady to start building production servers. Ø Project-X.
$aveZone Milestone 2 - Update $aveZone Milestone 2 - Update Fifth team: Dima Reshidko Oren Gafni Shiko Raboh Harel Cohen.
1 Yield Analysis and Increasing Engineering Efficiency Spotfire Users Conference 10/15/2003 William Pressnall, Scott Lacey.
Graphical User Interface You will be used to using programs that have a graphical user interface (GUI). So far you have been writing programs that have.
JTLS International User Conference JTLS / US National Defense University Project Mrs. Ellen Roland.
Final project presentation by Alsharidah, Mosaed.
Joint Theater Level Simulation Service Oriented Architecture.
16th JTLS International Users Conference
JavaScript Overview Developer Essentials How to Code Language Constructs The DOM concept- API, (use W3C model) Objects –properties Methods Events Applications;
JTLS Air Tasking Order Translator Ellen Roland ROLANDS & ASSOCIATES 16 th JTLS International Users Conference 4 March 2014.
CMSC 2021 Software Development. CMSC 2022 Software Development Life Cycle Five phases: –Analysis –Design –Implementation –Testing –Maintenance.
The Value of USAP in Software Architecture Design Presentation by: David Grizzanti.
JTLS Demonstration Review Ellen Roland ROLANDS & ASSOCIATES 16 th JTLS International Users Conference 4 March 2014.
Comparison of The Workflow Management Systems Bizagi, ProcessMaker, and Joget Mohamed Zeinelabdeen Abdelgader [1], Omer Salih Dawood [2], Mohamed Elhafiz.
Analysis. This involves investigating what is required from the new system and what facilities are available. It would probably include:
Project Outline I A New CRM database must accomplish the following:  Deliver support resources for internal IT  Integrate all data from existing CRM.
Chapter 17 The Need for HTML 5.
A Level Computer Science
Sentinel Battery Monitoring Systems protecting your power supply
JTLS-GO Data Repository Concept
JTLS-GO Use For Globally Integrated Exercises (GIE)
Money Bills Amendment Procedure and Related Matters Bill [B 75–2008]
Mr C Johnston ICT Teacher
Some Important Techniques For Regression Testing That You Must Know.
International User Conference 21 July 2015
PCS WorkFlow Solutions
JTLS 5.0 JTLS – Global Operations
JTLS International User Conference 21 July 2015
JTLS International User Conference
M. Kezunovic (P.I.) S. S. Luo D. Ristanovic Texas A&M University
JTLS Online Learning Project
Deploy ML in Data Product
Synchronization of users privileges
Ellen Roland ROLANDS & ASSOCIATES Corporation
Ellen Roland ROLANDS & ASSOCIATES Corporation
Current Status of GlobalSim Link between JTLS-GO + GESI
Presentation transcript:

JTLS International User Conference JTLS Future Ellen Roland

Most Obvious –We WILL Finish JTLS 5.0 Final Version Expected 1 November 2015 –We Expect To Spend Majority Of O&M Work Testing, Fixing, Texting, Fixing, Testing JTLS 5.0 Documentation –Complete Overhaul For Correctness Planned Future Projects July 2015 ROLANDS & ASSOCIATES Corporation 2

Data Repository –This Is My Number 1 Priority After JTLS 5.0 Planned Future Projects July 2015 ROLANDS & ASSOCIATES Corporation 3

JS / J7 R&D Projects –Unconventional Warfare Service Limited Input From User –May Result In Two Parts »Automated Task Builder For SOF »Assessment Of Task Results Planned Future Projects July 2015 ROLANDS & ASSOCIATES Corporation 4

JS / J7 R&D Projects (Con’t) –Force Perception Service JLVC 2020 – Has No Perception Planned Future Projects July 2015 ROLANDS & ASSOCIATES Corporation 5 Run Time Data Base Force Perception Service Ground Truth Side Perceptions

JS / J7 R&D Projects (Con’t) –Collection Reporting Service Has The Most Possibility Of JTLS Improvement How To Get More Realistic Intel Reporting –Aggregate Combat Adjudication Service Currently JTLS Is Data Intensive Possibility Task May Lead –To Less Detailed Result –Faster Result Could Lead To Useful Improvement Planned Future Projects July 2015 ROLANDS & ASSOCIATES Corporation 6

JS / J7 R&D Projects (Con’t) –Aggregate Combat Adjudication Service Currently JTLS Is Data Intensive –Probably Need Less Data Intensive Solution Use JTLS To Compare –Current And Proposed New Algorithm Possibility This Service May Lead –To Less Detailed But Faster Result Could Lead To Useful Improvement –We Would Not Remove Current Method / Simply Add New Planned Future Projects July 2015 ROLANDS & ASSOCIATES Corporation 7

Several Client Improvements –Just This Week Four Clients Have Shown Interested In Funding Specific Improvements –Kuwait Is Moving Forward Hoping GlobalSim Will Make Major Improvements Planned Future Project July 2015 ROLANDS & ASSOCIATES Corporation 8

Future –JTLS Has Been Under Constant Development Since 1983 It Is Now 32 Years Old –But … It Is Not Old We Have Aggressively Insured We Stay Current –New Training Requirements –New Technology Planned Future Project July 2015 ROLANDS & ASSOCIATES Corporation 9

Future –JTLS Is A Model Of Firsts Completely Automated Wargaming System Joint Model System To Use Graphics With Real Map Background Represent More Than Three Sides Data Driven Graphical User Interface Planned Future Project July 2015 ROLANDS & ASSOCIATES Corporation 10

Future (Con’t) –JTLS Is A Model Of Firsts (Con’t) Web-Enabled System –From Database Building Process –To Model Execution –With After Action Review Access Investigate Tablet Technology –Future Is Positive Planned Future Project July 2015 ROLANDS & ASSOCIATES Corporation 11