M23 Inner Regions Upgrade with Triple-GEM detectors The EVLGG (Davide, Gianni & Ale) INFN Cagliari LNF Frascati INFN Roma.

Slides:



Advertisements
Similar presentations
Triple-GEM detector operation for high-rate particle triggering W. Bonivento, G. Bencivenni, A. Cardini, C. Deplano, P. de Simone, F. Murtas, D. Pinci,
Advertisements

Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
GEM Detectors for AnDY Nilanga Liyanage University of Virginia 1 Outline GEM chamber concept Large area GEM chamber projects Proposed GEM configuration.
sTGC for ATLAS Small Wheel upgrade
Bulk Micromegas Our Micromegas detectors are fabricated using the Bulk technology The fabrication consists in the lamination of a steel woven mesh and.
Status of the LHCb RPC detector Changes with respect to Note cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
PNPI in LHCb A.Vorobyov HEPD Scientific Board meeting, December 26,2003 Status report for 2003.
GEM DHCAL Simulation Studies J. Yu* Univ. of Texas at Arlington ALCW, July 15, 2003 Cornell University (*on behalf of the UTA team; S. Habib, V. Kaushik,
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
Production Readiness Review of Frascati MWPC Production Site December 4 th, 2003 – P. Campana.
LHCb MUON MPWC STATUS OF TOOLING, SITES, PRODUCTION AND MATERIAL PROCUREMENT.
US CMS Phase 2 R&D Discussion 30-July-2013 “Phase 2 muon R&D” J. Hauser, UCLA  Add redundancy (power) to trigger where most needed  First and innermost.
2012 IEEE Nuclear Science Symposium Anaheim, California S. Colafranceschi (CERN) and M. Hohlmann (Florida Institute of Technology) (for the CMS GEM Collaboration)
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
October 28-th, 2005Straw tracker 1 Status of Straw Tracker for P236 P.L. Frabetti, V.Kekelidze, K.Kleinknecht, V.Peshekhonov, B.Peyaud, Yu.Potrebenikov,
Sept. 24, Status of GEM DHCAL Jae Yu For GEM-TGEM/DHCAL Group Sept. 24, 2010 CALICE Collaboration Meeting Univ. Hassan II, Casablanca Introduction.
M.Alfonsi 1, G. Bencivenni 1, W. Bonivento 2,A.Cardini 2,C. Deplano 2, P. de Simone 1, F.Murtas 1, D.Pinci 3, M. Poli-Lener 1, D. Raspino 2 and B.Saitta.
G.Bencivenni LNF/INFNMuon Meeting 21-October-2002 Status Report on triple-GEM detector M.Alfonsi 1, G. Bencivenni 1, W. Bonivento 2,A.Cardini 2,C. Deplano.
1 July GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China.
Atsuhiko Ochi Kobe University 25/06/2013 New Small Wheel MicroMegas Mechanics and layout Workshop.
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
Siena, 24 th May 2004 Aging Measurements on Triple-GEM detectors operated with CF4-based gas mixtures M. Alfonsi 1, G. Bencivenni 1, W. Bonivento 2, A.Cardini.
The Bigbite second GEM tracker. SBS GEM Trackers Front Tracker Geometry x6 18 modules In Italy  50 cm x 40 cm Modules are assembled to form larger chambers.
Detector R&D for Muon Chamber Anand K. Dubey For VECC group.
September 9, 2003A. Cardini / INFN Cagliari1 M. Alfonsi 1, G. Bencivenni 1, W. Bonivento 2, A.Cardini 2, C. Deplano 2, P. de Simone 1, F. Murtas 1, D.
Muon Electronics Upgrade Present architecture Remarks Present scenario Alternative scenario 1 The Muon Group.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
GEM R&D Update Kondo Gnanvo. Outline  GEM R&D and assembly facilities at UVa  Cosmic test results  Update on the 40 × 50 cm 2 GEM prototype  Plans.
Scintillating Tiles for the Muon Inner regions LHCb Muon Upgrade meeting, CERN May Wander Baldini for the Ferrara LHCb group.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Preliminary results of a detailed study on the discharge probability for a triple-GEM detector at PSI G. Bencivenni, A. Cardini, P. de Simone, F. Murtas.
M. Bianco On behalf of the ATLAS Collaboration
F.Murtas1 CNAO- ARDENT Workshop October 19 th 2012 Triple GEM detectors : Beam monitoring for beam profile and intensity measurements. Construction of.
Test of the GEM Front Tracker for the SBS Spectrometer at Jefferson Lab F. Mammoliti, V. Bellini, M. Capogni, E. Cisbani, E. Jensen, P. Musico, F. Noto,
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
Application of Large Scale GEM for Digital Hadron Calorimetry Jae Yu For GEM DHCAL Group June 11, 2011 TIPP 2011 The Goals 30cmx30cm 2D readout with KPiX.
To measure 0, mechanical oscillations of the wire to be tested are induced by applying a periodic high voltage (about 900 V) with a frequency of 300 ÷
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
Construction and beam test analysis of GE1/1 prototype III gaseous electron multiplier (GEM) detector V. BHOPATKAR, E. HANSEN, M. HOHLMANN, M. PHIPPS,
M23 Inner Regions Upgrade with Triple-GEM detectors The XVLGG (Davide, Gianni & Ale) INFN Cagliari LNF Frascati INFN Roma.
Construction and Characterization of a GEM G.Bencivenni, LNF-INFN The lesson is divided in two main parts: 1 - construction of a GEM detector (Marco Pistilli)
LHCb Muon System TDR Outline: Introduction –Physics requirements –Background conditions Overview of the Muon System Physics Performance –L0 muon trigger.
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
Muon System Update: Next Steps Alessandro Cardini INFN Cagliari.
The interaction of the Laboratori Nazionali di Frascati– INFN with TE-MPE-EM Workshop G. Bencivenni LNF-INFN Frascati - Italy.
Results on a Large Area triple-GEM Detector at LNF 5 th RD51 Collaboration Meeting Freiburg, 25 May 2010 D. Domenici - LNF.
SDHCAL. outline  SDHCAL concept, validation and construction  Test Beam and technological prototype performance  Perspectives and Conclusion  SDHCAL.
NSS2006Shengli Huang1 The Time of Flight Detector Upgrade at PHENIX Shengli Huang PHENIX Collaboration Outlines: 1.Physics motivations 2.Multi-gap Resistive.
FEE for Muon System (Range System) Status & Plans G.Alexeev on behalf of Dubna group Turin, 16 June, 2009.
RPCs with Ar-CO2 mix G. Aielli; R.Cardarelli; A. Zerbini For the ATLAS ROMA2 group.
F. Murtas CERN-INFN Frascati December 2 th 2013 – He3 free detectors Italy Workshop 1 Front End Electronics for GEM detector  Neutron detectors and GEM.
R&D on Hadron Blind detector, recent results Issues addressed: - gain limits in CF 4 with heavily ionizing particles - operation.
Precision Drift Tube Detectors for High Counting Rates O. Kortner, H. Kroha, F. Legger, R. Richter Max-Planck-Institut für Physik, Munich, Germany A. Engl,
Trigger & Tracking detector for CMS
A particle detector for educational purposes
Results achieved so far to improve the RPC rate capability
A proposal to equip the high eta muon stations with High Rate GRPC
Saikat Biswas, A. Abuhoza, U. Frankenfeld, C. Garabatos,
ATLAS-MUON Trigger hardware developments
Third Workshop on GEMs for CMS
Results from a preliminary analysis of the MWPC test at the GIF
Why Micromegas? Muon Upgrade Workshop, 27/01/2012 Jörg Wotschack.
RPC and LST at High Luminosity
Development of Gas Electron Multiplier Detectors for Muon Tomography
Pre-installation Tests of the LHCb Muon Chambers
(On Behalf of CMS Muon Group)
Presentation transcript:

M23 Inner Regions Upgrade with Triple-GEM detectors The EVLGG (Davide, Gianni & Ale) INFN Cagliari LNF Frascati INFN Roma

the EVLGG (Davide, Gianni & Ale) Introduction LHCb upgrade: the current scenario (from FTDR) The weak points of the current system The triple-GEM proposal Preliminary Cost estimate 2013 R&D activity Conclusions 218 June 2012

LHCb Upgrade: The Scenario 40 MHz readout + flexible software-based trigger This will allow annual rates x5 (muon ch.) – x10 (hadronic ch.), LHCb will also become a general-purpose forward detector Running conditions: –Luminosity of 1e33 in LoI; but now in FTDR we plan for 2e33… and what about a safety factor? The central regions of M2 and M3 are hot and could be much hotter than expected (no M1, no PS, no lead, no SPD anymore, splashes inside calorimeter hole, …) –Beam structure: 25 ns spacing, mu=2-4 –5 fb -1 /year for a 10 years operation Muon system needs to remain efficient and to operate for ~10 years the EVLGG (Davide, Gianni & Ale)318 June 2012

The Current Muon System As reported by Giovanni on March 27 th at the Muon General Meeting, “as far as rates are concerned we are already marginal at 1x10 33 but we are definitely out at 2x10 33 ” We strongly believe that we cannot go for a marginal detector which seems “just fine” for 2x10 33 – we have to use our experience and include a reasonable safety margin… and upgrade the muon detector to be efficient up to ~5x10 33 The muon system was designed to operate at a maximum of 1MHz/cm 2 /FE-channel  we need to push this limit at least by x5, better x10 in central regions In fact, the higher rates will create large dead-time with the current electronics and layout  muon system inefficiency In addition, these higher particle fluxes will: –Possibly create (position dependent) chamber inefficiencies due to local space-charge effects –Age detectors (much) faster This is particularly true for the central regions of M2 and M3 We need to carefully address all the above issues the EVLGG (Davide, Gianni & Ale)418 June 2012

M23R12 Triple-GEM Proposal For the upgrade of most irradiated parts of the muon system, regions M2R12 and M3R1, we propose Triple- GEM detectors as a possible rad-hard technology Our proposal is to use 4-gaps Triple-GEM detectors These detectors: –Innovative construction technique, both for GEM foils and Detector –Use MWPC gas –Simplified HV supply (using resistive dividers) –Anode pad (size of current logical pad) readout the EVLGG (Davide, Gianni & Ale)518 June 2012

A Working Solution Triple-GEM detectors with pad readout have already been selected to be used in M1R1 and have operated according to expectations Future M2R1/M3R1 rates will be similar (or even higher) than the current M1R1 rates  it seems natural to consider this technology for these inner regions In the last 10 years, since the M1R1 triple-GEM proposal, these detectors have increased in popularity and have been used successfully in many experiments: they are now cheaper and more reliable thanks to the improvement in GEM fabrication technology In addition, the experience we accumulated for M1R1 allows us to be much more confident in proposing this type of detector and in operating it  We strongly believe that this detector type is the RIGHT solution for this environment the EVLGG (Davide, Gianni & Ale)618 June 2012

Triple-GEM detectors performance Can stand up to 50 MHz/cm 2 [1] Aging has been demonstrated [2] up to 2.2 C/cm 2 ; after the aging test the detectors show the expected efficiency and time resolution with only a 15V increase in supply Current integrated charge estimate is 40 mC/cm 2 /recorded fb -1 in the most irradiated detector of M1R1 (horizontal plane)  since M1R1 and M2R1_upgraded have similar particle rates, ready to integrate 50 fb -1 at these rates, which are similar to what we will have in M2R1 in LHCb upgraded This technology seems to be already certified for the M23 inner regions operation at the LHCb upgrade! We plan to use MWPC gas mixture: Ar/CO 2 /CF 4 40/55/5 to simplify the integration of this detector technology in M23 The use of a higher-gain gas mixture will minimizes the required GEM operating voltage, and by consequence the spark probability, improving detector reliability [1] [2] M. Alfonsi et al., IEEE TRANS. NUCL. SCIENCE, vol. 52 (2005) the EVLGG (Davide, Gianni & Ale)718 June 2012

Assembly Scheme Summary The new design of GEMs detector offers many advantages: –No gluing, no soldering during the assembly procedure –No special tooling required –The detector does not need spacers in the active area –Assembly is very fast and easy (~ 1/day with 2 people crew) –If needed, the detector can be re-opened for modifications, repairs, or to replace a GEM foil the EVLGG (Davide, Gianni & Ale)818 June 2012

Production Cost Estimate M2R1 ( 48 detectors) (or M3R1) GEM foil  10.8 m 2 x 2000 CHF/ €/48 det.s = 375 € /det. PCBs (cath.+anode)  = 2230 €/48 det.s = 50 € /det. Honeycomb+ backplane  80x96 = 7680 €/48 det.s = 160 € /det. Detector mechanics  300 € /det. ___________ total 885 € /det total 885 € /det. TOTAL COST ESTIMATE FOR M2R1 or M3R1  885 x 48 = € M2R2 (96 detectors) GEM foil  43.2 m 2 x 2000 CHF/1.2  €/96 det.s = 750 € /det. PCBs (cath.+anode)  = 7194€/96 det.s = 75 € /det. Honeycomb+ backplane  100x192 = 19200€/96 det.s = 200 € /det. Detector mechanics  500 € /det. ____________ total 1525 € /det. TOTAL COST ESTIMATE FOR M2R2  1525 x 96 = € In green : budgetary offer In yellow : estimate (in excess) from our personal experiences the EVLGG (Davide, Gianni & Ale)918 June 2012

Tentative Planning 2012 –Prototype assembly and test –Start to study triple-GEM detector performance with MWPC gas mixture 2013 –Start detector design –Production of 2 real-size detectors –Test with CARIOCAGEM 2014 –Final design –Build a full detector –Test with new electronics the EVLGG (Davide, Gianni & Ale)1018 June 2012

R&D Activity in 2013 The following are the activities that we would like to perform in 2013 and for which we will ask funding to INFN: –Built 2 detectors with the size of M3R1 chambers using the new assembly technique (embedded stretcher) to assess the assembly technique and possibly improve it, and also to have some real-size prototypes that we could use on beam test –Also built a few 10x10 cm 2 detectors for laboratory testing –Test detector performance with the MWPC gas mixture: time resolution (cosmic rays), gain ( 55 Fe source), spark (alpha source) –Perform a test with ~10 MeV neutrons (likely at ENEA-Frascati) to evaluate the impact of Heavy Ionizing Particles on detector performances –In conjunction with our electronic team, start developing the new detector electronics (FEE + post-processing) –We are currently not planning a test beam for 2013 – all measurements we have in mind could be done in an alternate way 18 June 2012the EVLGG (Davide, Gianni & Ale)11

Conclusions The inner regions of M2 and M3 of the current muon detector cannot be operated with the required performances at 2x10 33 MWPC technology does not seem to guarantee a sufficient operational safety margin if used in M2/M3 inner regions  replace them with Triple-GEM Detectors We need to test the performance of a 4-gap Triple-GEM detector using the current MWPC gas mixture GEM foil new fabrication technique is cheap and reliable; together with the proposed detector assembly scheme we can built fast and easily the required chambers The total cost of the detectors for M2R12 and M3R1 is ≈250k€ Triple-GEM detector seems the right choice to equip M2 and M3 inner regions A R&D activity is planned for 2013 to give clear answers to all pending issues the EVLGG (Davide, Gianni & Ale)1218 June 2012