Group EIA 1: Screening for Annex 2 Both:- case-by-case - thresholds < 10% goes to EIA All Countries have problems with “Salami Slicing” Little Information.

Slides:



Advertisements
Similar presentations
Legal issues on shale gas activities raised in petitions received by the European Parliament Committee on Petitions.
Advertisements

EU FORMAL REGULATION – TYPES OF STANDARDS ENVIRONMENTAL QUALITY OBJECTIVES ENVIRONMENTAL QUALITY STANDARDS.
EU FORMAL REGULATION – TYPES of STANDARD MINIMUM EMISSION STANDARD (sometimes known as LIMIT VALUES) UNIFORM EMISSION STANDARD.
HR 09 IB EN 02 – German Proposal, Zagreb, 10 June 2011 Page 1 April 12, Strengthening the Ministry of Nature Protection of the Republic of Armenia.
1 Strategic Environmental Assessment and SFs Operational Programmes: An assessment Jonathan Parker DG ENV ENVIRONMENT EUROPEAN COMMISSION Aarhus Workshop.
Interaction between EIA and Articles 6.3 and 6.4 of Habitats Directive Yvonne Scannell Law School, Trinity College, Dublin Arthur Cox, Solicitors, Dublin.
Industrial Pollution Control and Risk Management: IPPC Neil Emmott Environment Directorate-General 7 April 2006.
Consultant: CMDC Joint Venture Application of BAT in IPPC/EIA Experience in EU Member States Per Ponsaing COWI.
Insert Filepath here International Symposium on Environmental Issues Industrial Pollution Control and Risk Management September 28 & Jack O’Keeffe.
Practical use of newly developed BAT conclusions Valts Vilnītis.
Hellenic Ministry for the Environment, Spatial Planning and Public Works Greek Experience on the Implementation of EPER REPORTING IN GREECE Η ΕΛΛΗΝΙΚΗ.
The IPPC Recast. New environmental requirements for explosives production sites.
ECENA 4 th Exchange Programme Cluj Napoca, October, 2005 National Updates in the Transposition and Implementation of IPPC directive Ministry of Environment.
IPPC IN MINING AND METALLURGY IN THE REPUBLIC OF MACEDONIA Bosko Nikov
“Building Effective Public Participation in Environmental Impact Assessment in a Transboundary Context” in Bulgaria Institute for Ecological Modernisation.
1 CEER How to balance the public’s concerns and critical infrastructure construction Matti Vainio, Deputy HoU DG ENV – C.5, European Commission.
The European IPPC Bureau Institute for Prospective Technological Studies (IPTS) Seville, Spain Internet E.mail : Don.
1 Inspection of LCPs: System for Inspection. ECENA Training Workshop Bristol, March 2008.
BAT as a main tool for minimisation of the negative impact of industrial activities Aivi Sissa Tallinn – Estonia 27 – 28 March 2008.
1 LINKING THE WATER FRAMEWORK DIRECTIVE AND IPPC DIRECTIVE Main achievements Session 8 - Nature and water Malta, 03/10/2013.
The Sevilla process for supporting the implementation of the IPPC Directive Michael Parth Tallinn – Estonia 27 – 28 March 2008.
Air Quality Governance in the ENPI East Countries Regulation of non-Annex I activities in the CR and UK Monika P ř ibylová.
PRTR-online survey. Questions – Items Question 3 – Item 2.
BULGARIAN APPROACH TO THE BAT IN THE IPPC PERMITTING BOYKO MALINOV MINISTRY OF ENVIRONMENT AND WATER BULGARIA.
The Aarhus & Espoo Conventions Making implementation work for stakeholders.
The IPPC Directive and its implementation Alexandre Paquot European Commission Environment Directorate-General Phare Capacity.
Ministry of Waters and Environmental Protection, ROMANIA 1 BERCEN 1 st Exchange program – November 2002 Croatia PROBLEMS AND SOLUTIONS IN COOPERATION.
1 Permitting of industrial facilities in Croatia.
Consultant: CMDC Joint Venture Reflections on draft Recommendations for Revision to Administrative Regulations: By Norman Sheridan, Legal & Institutional.
The Industrial Emissions Directive (IED) 2010/75/EU Gabriella Gerzsenyi & Menno Verheij European Commission, DG Environment Industrial Emissions Unit 03.
IPPC transposition and experience with its implementation in the Czech Republic ?? …!! AjPíPíSí ??
1 Workshop on the Directive 96/61/EC concerning (IPPC) Integrated pollution prevention and control INFRA Public participation & access to environmental.
The Process of Development of IPPC Legislation Robert Sarlamanov MA, IPPC Expert Ministry of Environment and Physical Planning, Bercen Exchange Programme,
CONTROL Environmental protection act Boyko Malinov Ministry of environment and water Bulgaria.
Implementing legislation for Integrated Permitting Monika Pribylova 1 October 2013 года Air Quality Governance in the ENPI East Countries.
EIA-legislation and practice in Norway history history latest amendments of regulations latest amendments of regulations integrated planning/EIA processes.
Consultant: CMDC Joint Venture EIA, IPPC and SEVESO Links.
IPPC vs Emissions Trading Lesley James Friends of the Earth (England, Wales & N.Ireland) and the European Environmental Bureau.
Air Quality Governance in the ENPI East Countries Capacity building for decision makers for small businesses regulation Monika P ř ibylová.
PPSD in specific sectors in Bulgaria - Regional Plans for Development National Programme for Ports Development (2006 – 2015) Vania Grigorova, Jacquelina.
The legal background for implementing the IPPC, EPER, and PRTR Protocol Requirements Orsolya Adamovics Department for Conservation of Environment Ministry.
Industry environmental self- monitoring and reporting UK experience with reference to the Pollution Inventory Dr Ian Whitwell The Environment Agency of.
Consultation seminar on the preparation of full Application Form for LSP 6 December 2011, Tartu Consultation seminar on the preparation of full Application.
REVISION OF THE IPPC DIRECTIVE  DIRECTIVE ON INDUSTRIAL EMISSIONS.
Consultant: CMDC Joint Venture 1 Multi-Country Conference Prague 7-9 June 2004 Selected challenges in IPPC permitting - experience from CEE Vibeke Burchard.
SEA in the Czech Republic Prague, 24 September 2008.
Iuliana CHIDU European integration counsellor Ministry of Environment and Water Management Prague - CZECH REPUBLIC April 2005 DIRECTIVE 96/61/EC.
How to start with the implementation of IPPC Directive Czech Republic Czech Environmetal Inspectorate.
CROATIA Country Report IPPC Directive: implementation, problems, constraints, open questions,… Anita Pokrovac Patekar, B. Sc. Pharm. Ministry of Environmental.
Consultant: CMDC Joint Venture Czech experience - Use of BREFs and national BAT notes, role of IPPC Agency, Czech TWG Multi-Country Workshop June 8th,
Pilot Project on implementation of SEA for regional planning in Ukraine Prof. Dr. Michael Schmidt Dmitry Palekhov Brandenburg University of Technology.
Ministry of Environment, Forests and Water ManagementAlbania ECENA Exchange Programme First Plenary Meeting January, 2006 Zagreb, Croatia.
DG ENV Environmental assessment procedures for energy infrastructure projects of common interest (PCIs)
1 Review of the IPPC Directive and related legislation Second Meeting Of Working Group E On Priority Substances 17 October 2007 Filip FRANCOIS – DG ENV.
Peter Lukáč Ministry of Environment of the Slovak Republic Department of Environmental Assessment.
Ministry for Ecology, Energy, Sustainable Development and Sea in charge of Green Technologies and Climate Negotiations
IPPC Permit Procedure in the UK Kiev, 26 January 2011 Alex Radway Senior Advisor Environment Agency for England & Wales, United Kingdom.
Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 1 The IPPC Directive Introduction to the philosophy Rob Kramers.
IPPC A general overview Nigel Barraclough Policy Adviser Industrial Pollution Control Branch Air and Environment Quality Division. Taiwanese Environmental.
Introduction to the philosophy
BAT - BREF Their scope Rob Kramers Senior advisor InfoMil.
INTEGRATED PERMITTING IPPC DIRECTIVE: BEST PRACTICE
Environmental assessment system in Finland
SERBIAN NATIONAL ACTION PLAN [DRAFT]
IPPC Directive Discussion on Reporting on ELV and BAT 4th Reporting Questionnaire, Q. 6.1 IEEG meeting 7 December 2010.
Relationship between World Bank and Romanian EA requirements
Reduction of total releases from unintentional production of POPs
Successful implementation of EIA? An evaluation and comparison of
Data specifications for IED Annex II Module 4
Industrial Emissions Directive Targeted stakeholder survey
Presentation transcript:

Group EIA 1: Screening for Annex 2 Both:- case-by-case - thresholds < 10% goes to EIA All Countries have problems with “Salami Slicing” Little Information from proponent (in some countries) Public Participation in all countries: Publication with information, Possibility to comment Decisions taking in local level is sometimes problematic. Mostly decision is taken on regional/central level

Group EIA 2: Cumulative Effects Problems of definitions Approach to identify cumulative effects Practices – Existing modelling systems Guidelines SynergeticCumulative  Connection to SEA (Spatial Planning, Environmental Action Plans)  Case – by – case examination Gap: For example  Human health  Odour  Not existing in most of countries  EU has – but in English

Group EIA 3: EIA and Natura 2000 Legislation: Poor enforcement Availability and capacity of human resources Development versus environmental protection Integration of the screening stage Activities under Natura 2000 and EIA should be managed by one and the same authority

Group IPPC 4: Substantial Change New Substances: First evaluate effects on environment Special attention to new chemicals Evaluation guidance needed Increased Volume: Existing technology  Not substantial change New technology  substantial change Small concentrations or amounts in vulnerable (also industrial) areas may represent substantial change

Cont. Group IPPC 4: Substantial Change Increasing Negative Effect: Most important evaluation issue “Significant” and “negative” defined by case National guidelines needed Lower overall emissions  up-date permit General: Change in operation  up-date permit Substantial change  New permit Some tools exist: environmental quality standard (EQS) (water, air) Amendment to Aarhus convention: Above Annex 1 Thresholds  Substantial change Operator responsible for reporting changed environmental impacts

Group IPPC 5: What to Do in Case of No BREFs or No Translated BREFs Operator = Choose BAT! Permitter (CA) = Confirms or not! Principles = Pollution prevention!! Case by Case (preamble, text, definitions, annex IV) Wg № 5

Cont. Group IPPC 5: What to Do in Case of No BREFs or No Translated BREFs Choices: Use other sources >< Create own Higher protection = BAT Minimum Requirements Lower protection = Not BAT (ELV, waste etc) Draft BREFs BAT = US EPA, UK, WB, Helcom home pages CP = reports, books etc. Other = reports, benchmarking, standards etc. ActivityUsed technology at process Chosen BATCompl xxxxxxx Comparison Table

Cont. Group IPPC 5: What to Do in Case of No BREFs or No Translated BREFs Problems: 1.Quality BREFs and translations 2.Need of many specific skills of Competent Authority (technical, ecological, economical, psychological, sociological, public relations etc.)

Group IPPC 6: Interaction between Application form and the Permit – Standard Templates etc. 1.Format of application & permit: compulsory or recommended nationally 2.Need for adjustments: flexibility 3.Guidance needed 4.Electronic submission  usage of database 5.Verification of application  long use  Pre-application consultation Conclusion