1 Jan 13, 2015 ProSUM RECHARGE input for Batteries C. CHANSON.

Slides:



Advertisements
Similar presentations
A. Van de Maelestraat 96 B-9320 Erembodegem Belgium Water Statistics - Work Session 5a Vienna, Rudy Vannevel Towards HARMONISATION.
Advertisements

1 Guy Duchossois, Work Plan Manager Report on 2006 Work Plan.
Process Flow Paper Product user Ground wood Mechanical Pulping
European Portable Battery AssociationEPBA EPBA Trilateral Meeting EPBA association update 16 June 2011 Washington.
1 Arno James Christian Katerina Feedback 2. 2 Introduction to afternoon break out groups The Work Packages 3.
1 Chapter 12: Decision-Support Systems for Supply Chain Management CASE: Supply Chain Management Smooths Production Flow Prepared by Hoon Lee Date on 14.
Labour Market Indicators Library System as tools for collecting, managing and disseminating data and metadata ILO Employment Strategy Department.
1 6th WRBRF, March 23-24th 2015, Berlin Market data, Collection and recycling data PROSUM Project C. CHANSON PPT 12.
Statistics on enterprise groups – the EGR potential European Commission – Eurostat Directorate G: Global business statistics.
1 Introduction, reporting requirements, workshop objectives Workshop on greenhouse gas and ammonia emission inventories and projections from agriculture.
The Knowledge Resources Guide The SUVOT Project Sustainable and Vocational Tourism Rimini, 20 October 2005.
Integrated Control of Industrial and Chemical Substances in Cyprus Integrated Control of Industrial and Chemical Substances in Cyprus Final Conference.
Chapter One Copyright © 2006 McGraw-Hill/Irwin Marketing Research For Managerial Decision Making.
The Future of Waste Management “Matrix Reloaded” Antonis Mavropoulos CEO D-Waste
1 NATIONAL TECHNICAL UNIVERSITY OF ATHENS (NTUA) School of Chemical Engineering Unit of Environmental Science and Technology (UEST) Katherine Haralambous.
European Commission - DG Environment Clean Air for Europe Jacques Delsalle European Commission European Commission DG Environment, Unit C1 Further Development.
Anton Todorov Business Development Manager AII Data Processing Ltd 16.IV.2008.
European Portable Battery AssociationEPBA EPBA Trilateral Meeting Collection targets 16 June 2011 Washington.
Pilot project “Regional Risk Assessment of Mining Sites and Contaminated Sites in the Upper Silesia Region” Janusz Krupanek, Marek Korcz Institute for.
INNOVATION 2004 Prague, Nov. 30/Dec.1-3, 2004 The EUREKA Initiative: Assessment and Evaluation Procedures Svatopluk Halada EUREKA Secretariat, Brussels.
” Particulates „ Characterisation of Exhaust Particulate Emissions from Road Vehicles Key Action KA2:Sustainable Mobility and Intermodality Task 2.2:Infrastructures.
ISO Environmental management — Life cycle assessment — Data documentation format.
AWAST final meeting - Brussels december 2003 Aid in the management and European comparison of Municipal Solid WASte Treatment methods for a global.
European Commission Enterprise and Industry | | ‹#› The Lead Market Initiative and Sustainable Construction CEEC seminar, 8 May 2009 Antonio.
Structure and Content of SoE Report in the Czech Republic Tereza Ponocná CENIA, Czech Environmental Information Agency.
EVITherM The European Virtual Institute for thermal metrology Contact thermometry (WP8)
1 Update on work to Improve data on access to finance for entrepreneurship OECD Entrepreneurship Indicators Steering Group (EISG) meeting Istanbul,
1 DG Enterprise & Industry European Commission Conference on Better Regulation: Practical Steps Forward Reykjavík 6 June 2006 OVERVIEW OF THE BETTER REGULATION.
Workshop 1.4: ESPON Database ESPON Internal Seminar November 2011 Kraków,Poland ESPON M4D Project - LIG (Grenoble Computer Science Lab) Partner Jérôme.
BFP grant – GECAFS Objectives 1.Improve understanding of vulnerability of food systems to the stresses induced by GEC 2.Document food systems and analyze.
W HAT IS I NTEROPERABILITY ? ( AND HOW DO WE MEASURE IT ?) INSPIRE Conference 2011 Edinburgh, UK.
Emissivity and other infrared-optical properties (WP6)
1 Life Cycle indicators for the Data Centres on resources, products and waste IMEA Workshop Paris, 20 March 2009 Ugo Pretato, David Pennington, Rana Pant,
Addressing the challenge of producing European comparable data using administrative data Mihaela AGAFIŢEI Sorina VÂJU UNECE Seminar on Statistical Data.
Framework for the Creation of Digital Knowledge Resources to meet the Challenges for Digital Future: A Librarian’s Perspective Dr. Harish Chandra Librarian.
Progress Meeting - Vienna - June 2001 Aid in the management and European comparison of Municipal Solid WASte Treatment methods for a global and sustainable.
UNECE/WGEMA meeting, June Geneva Agenda item 5: Support to the fourth pan-European assessment report on the state of the environment Preparation.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
WP3 Harmonization & Integration J. Lauterjung & WP 3 Group.
ETC/CCA Main activities June June 2015 Silvia Medri (CMCC) ETC/CCA Manager Eionet WS on CCIVA Copenhagen, June 2015 European Environment Agency.
This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No The ProSUM.
WISE Working Group D September 2009, Brussels Jon Maidens.
National Bureau of Statistics of the Republic of Moldova 1 High Level Seminar for Eastern Europe, Caucasus and Central Asia Countries (EECCA) on 'Quality.
Statistical Business Register Enterprise Groups in Latvia Sarmite Prole Head of Business Register Section Business Statics Department Central Statistical.
Quality declarations Study visit from Ukraine 19. March 2015
Presentation Concerted Action On Logistics, Supply & Demand Chain Management In Europe 4th Framework Programme – DG TREN Starting date: 01/01/1999, duration:
The EPR journey in France Alain Grimm-Hecker President of Eco-systèmes
A register on Multinational Enterprise groups
Biodiversity.europa.eu BISE EEA and ETC/BD Rania Spyropoulou.
Prospecting Secondary raw materials in the Urban mine and Mining wastes INTRODUCTION The ProSUM Project aims to provide an inventory of secondary raw.
Supply Chain Management
15 March 2016, Kiev, Ukraine TWINNING PROJECT
Europe’s Environment Assessment of Assessments EE-AoA 2011
Prof. Maria Loizidou Nicosia, Hilton Park Hotel, 15th June, 2006
General presentation of SMART GROUND project
Q2 Results Stockholm, July 19, 2001
ENTERPRISE BUSINESS SYSTEMS part II
The Open Group Architecture Framework (TOGAF)
Mark Mistry Nickel Institute NeRSAP 7 Meeting Bilbao
Progress report Item 2 Eurostat Task Force on Annual Financial Accounts Frankfurt, 4 March 2016.
The EU Raw Materials Initiative: a short overview
مدل زنجیره ای در برنامه های سلامت
A SUMMARY NOTE ON REVISED GDP ESTIMATES
Activities relevant to MFA in Australia
SOER 2010 country assessments and SENSE Lessons learned and ideas about the way forward Bernt Röndell (SES), SEIS coordinator at EEA 1.
ENabling SafE Multi-Brand Platooning for Europe
GREECO ESPON Internal Seminar Sustainable Territories 30 November 2011
Data integration methods
Jacques Delsalle, DG Environment, Unit D.1
The EuroGroups Register Agne Bikauskaite, August Götzfried
Presentation transcript:

1 Jan 13, 2015 ProSUM RECHARGE input for Batteries C. CHANSON

WP2: Urban mine characterisation -T2.1: characterising CRM parameter configurations: contribution and fit to batteries ( 5 days/ Jan-Feb 2015) -T2.1.1: Screen available data on CRMs components: review of market data and validation, assessment of CRM content per technology. Consolidation for public communication. (25 days/ June 2015). -T2.1.2: Identify factors affecting CRMs in comp: Technologies which have driven the selection of CRM, Description of environmental impacts, products specific constraints in batteries design: active material usage linked to it's electrochemical properties. (10 days/ March 2016) -T2.1.3: Future development of CRM contents : assessment of the technology changes and market penetration rate for the next 5 to 10 years (15 days/ June 2016).

WP2: Urban mine characterisation T2.2: Consolidate data into CRM database: supply of data and contribution to batteries data integration (25 days/ when needed May-Oct 2016) T2.3: Identify and validate characterisation methods. support and fit for batteries (10 days / When needed) T2.4: Update + quality assessment protocols: support and fit for batteries (5 days/ When needed)

WP3: Stock and flow characterisation T3.1: Product Stocks: identification of batteries technologies placed on the market since the last 10 years. Assessment of using and hoarding times. Characterisation according the type of batteries (portable/ automotive/ industrial) (10 days / Dec 2015). T3.2: Complementary Flows : assessment of batteries lifespan and second use/re-use possibilities, compatibility with WEEE flows (4 days/ Apr 2015). T3.3.1/2 Products and CRM in Stocks and Flows support and data supply. (4 days/ When needed).

WP4: Waste characterisation T4.1: Waste + tailings inventory: support for batteries CRM inventory (4 days / When needed) T4.2 CRM Assessment Strategy for Waste & Tailings: support and fit for batteries (2 days / When needed) T4.3 Waste & Tailings characterization: support and fit for batteries (2 days / When needed)

Batteries data availability Recharge is mainly using 3 sources of data: Commercial market data for batteries placed on the market. Published in $ value and in watthours. Good worldwide coherence, lack of geographical precision in European member-states. Official data base: Eurostat data base for batteries placed on the market, and member-states information for batteries collection: incomplete and non homogeneous. The Battery directive application is expected to improve the situation in coming years. Private database: sources such as specific studies, internal members information: more accurate data, but no global coverage for Europe. Accurate tool to translate different units ($/Wh/tons/number of units).