June 27th, 2005AB/CO/HT - Review of Activities for PS-SPS 2006 Startup SPS RF FARADAY CAGE Purpose, Scope and deliverables Javier Serrano.

Slides:



Advertisements
Similar presentations
Front-end electronics for the LPTPC Outline of the talk:  System lay out  Mechanics for the front-end electronics  End-cap and panels  Connectors and.
Advertisements

Dayle Kotturi and Stephanie Allison Facility Advisory Committee Meeting April 20-21,
WG on possible controls restructuring 1 Controls activities of the AB equipment groups A. Butterworth E. Carlier, R. Losito, A. Masi, JJ. Gras, Q. King.
David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 How to power up the TRD David Emschermann Physikalisches Institut Universität Heidelberg updated.
The TIMING System … …as used in the PS accelerators.
June 27th, 2005AB/CO/HT - Review of Activities for PS-SPS 2006 Startup TIMING IN C.C.C - SPS Purpose, Scope CHERY.R.
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
1 P ROTEUS AMT Adaptive Modulation Transport. 2 Product Overview AMT-Series Indoor Unit Outdoor Unit L-Series Indoor Unit.
Controls renovation WorkshopFE Software 1 Front-end software C.H.Sicard.
06/05/2004AB/CO TC RF controls issues Brief overview & status Requested from AB/CO Hardware, Timing, VME/FESA for LEIR, SPS, LHC Controls for LHC RF Power.
Timing upgrades after LS1 Jean-Claude BAU BE-CO-HT1.
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
Alex Madorsky University of Florida/Physics Track Finder production readiness review, Rice, August 2004 Track Finder Crate, Backplane and Parts Alex Madorsky.
RF voltage and frequency interlocks A. Butterworth MP review 17/6/2010.
The Voice Operated and Wirelessly Controlled Elevator Jeremy Hester Advisor: Mohammad Saadeh Class: ET 493 – 01 Class Professor: Dr. Cris Koutsougeras.
Sophie BARON, PH-ESSLEADE - 07 Nov  TTC system status reminder  Upgrade principle  [Some] details about the infrastructure  Practical implementation.
Draft for approval in ABMB, 4 Feb 08 Andy Butterworth Claude-Henri Sicard for the Controls Coordination Committee (CO3) 22 Jan 20081ATC/ABOC Days.
R. Fantechi. TDAQ commissioning Status report on Infrastructure at the experiment PC farm Run control Network …
K. Luchini LCLS Week, October 26, 2005 Magnet Controls K. Luchini Overview Hardware Software SLC Aware IOC Database Modeling.
Controls for RF equipment AB/CO Review 22/9/2005 Andy Butterworth on behalf of AB/RF.
L. Arnaudon BE/RF/CS. Outline  RF systems description  Software environment  RF specialist requirements  RADE tools in use  ACS application  Low.
Controls renovation workshop Standardized Hardware Modules Javier Serrano, AB-CO-HT MJD
CMX Hardware Overview Chip Brock, Dan Edmunds, Philippe Yuri Wojciech Michigan State University 19-May-2014.
Towards a final design of LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
BP & RS: BIS & SLP for AB/CO Review, 23 h Sept Realisation of the interlocking between SPS, LHC and CNGS and open issues Beam Interlock Systems.
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
Timing for AP: introduction Javier Serrano AB-CO-HT 15 September 2006.
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 CSC Mechanics and Electronics Paul O’Connor Tom Muller BNL May 22, 2003.
GAN: remote operation of accelerator diagnosis systems Matthias Werner, DESY MDI.
This is an example text TIMELINE PROJECT PLANNING DecOctSepAugJulyJuneAprilMarchFebJanMayNov 12 Months Example text Go ahead and replace it with your own.
GMT Config. for the experiments: Summary of received requests / LEADE Meeting 4 th Feb.08 / B.P. 1 Summary of received requests for Safe Machine Parameters.
Sophie BARON, PH-ESSLEADE, 15/06/06 1 TTC upgrade Status May 2006  Overview  AB/RF optical links  Receiver crate  Status and schedules  Documentation.
Jan 23rd, 2008M.Vanden Eynden on behalf of the AB-CO Group1 AB-CO MTTR & Spare Part Policy for the LHC Injectors, Experimental Areas & other Facilities.
Power controls, Sept. 2006A.Fabich1 MERIT installation: Controls for the 5MW power-supply A.Fabich CERN AB-ATB September 2006.
SPS point 3 New RF building LIU-SPS-200 MHz Power Upgrade April 19, 2011Eric Montesinos / CERN-BE-RF-SR.
22 Sept 2005CO Review1 Services to Equipment Groups, AB/CO Viewpoint Marc Vanden Eynden, Ronny Billen, Franck Di Maio, Philippe Gayet, Eugenia Hatziangeli,
DIAMON Project Project Definition and Specifications Based on input from the AB/CO Section leaders.
1 Events for the SPS Legacy & Common Implications.
Christophe Martin TE-MPE-EP 02/06/ The BIS and SMP activities during LS1 MPE Group Review, 2 June 2015 Christophe Martin, Stephane Gabourin & Nicolas.
– Machine Controls Coordinators (MCC): team and role – Overview of renovations during LS1 – Proposal for after-LS1 Commissioning organization ACCOR PROJECT.
10/09/10FV 1 News and observations from Brussels' meeting.
K. Luchini LCLS Lehman Review - Controls Breakout, May 11th 2005 Magnet Power Supplies K. Luchini Overview Hardware Software.
Requested hardware for Clermont-Ferrand in the test beam 2015 September 23 Roméo Bonnefoy and François Vazeille This material is provided by LPC and Collaboration:
Radio Frequency Andy Butterworth AB/RF Accelerator Controls Renovation WS 3 Dec 2008.
AB-CO Exploitation 2006 & Beyond Presented at AB/CO Review 20Sept05 C.H.Sicard (based on the work of Exploitation WG)
AB-CO Review, 23 September 2005 L. Walckiers AT-MTM p. 1 Project description  To maintain for LHC completion  Magnet Rescue Activities [MAR]  Support.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
ALICE Trigger Upgrade CTP and LTU Design Review ALICE CTP and LTU Upgrade Design Review CERN 27 th January 2016 Budget, time schedule, resources David.
FTK crates, power supplies and cooling issues 13/03/20131FTK-IAPP workshop - A. Lanza  Racks, crates and PS: requirements  Wiener crates  Rittal crates.
ECAL electronics schedule JFMAMJJASONDJFMAM Prototype 2 boards Design Layout Fabrication and assembly Testing, including VFE prototype tests Production.
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
Chapter Objectives In this chapter, you will learn:
【New Draft】 France -Japan International Co-funding Joint call Schedule (revised version) APR. 11, 2017 Bpifrance / NEDO final meeting (week of 18/9) Announcement.
CC LLRF SM18 test plan and BA6 infrastructure
Initial check-out of Pulsar prototypes
SM18 RF M7 Bunker Project Status 14th July 2017
Cabling for LHCb Upgrade
A New Clock Distribution/Topology Processor Module for KOTO (CDT)
Renovation of the Accelerators Controls Infrastructure and its Assets Management Asset and Maintenance Management Workshop November 14th, 2013 Cl.Dehavay.
TTC System Status May 2007 System overview Production Status
Strategy for long-term support of the TTC system
LLRF and Beam-based Longitudinal Feedback Readiness
LCLS Cavity BPM Electronics Undulator Week January 22, 2008
Magnet PS Controls Hardware Status
CMX scope and functionalities
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
3 Week A: May 1 – 19 3 Week B: May 22 – June 9
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Presentation transcript:

June 27th, 2005AB/CO/HT - Review of Activities for PS-SPS 2006 Startup SPS RF FARADAY CAGE Purpose, Scope and deliverables Javier Serrano

June 27th, 2005AB/CO/HT - Review of Activities for PS-SPS 2006 Startup SPS RF FARADAY CAGE PURPOSE: To upgrade the existing TG3- based system with a new CTRV-based system, therefore allowing: –8 events/ms on the GMT cable. –FESA multi-cycling. –Usage of standard configuration and diagnostics software provided by AB-CO. –Documenting this important part of the timing system in the same central DB as the rest.

June 27th, 2005AB/CO/HT - Review of Activities for PS-SPS 2006 Startup SPS RF FARADAY CAGE SCOPE (1/2) –Every G64 crate is composed of TG3s and opto-fanout modules. –Take the G64 crates in groups of two and replace every group by a combination of one VME crate and one G64 crate (no TG3s, only for the fan-out modules). G64 Pulse stretchers Opto-fanouts G64 Front viewRear view Current G64 HW configuration

June 27th, 2005AB/CO/HT - Review of Activities for PS-SPS 2006 Startup SPS RF FARADAY CAGE SCOPE (2/2): work breakdown –Preparing 7 cable bundles (40 lemo 00 each). –Understanding the current installation in terms of SW and proposing a new configuration. –Procurement of 8 VME systems (crate + CPU), 70 CTRV cards, 35 fan-out cards plus miscellaneous material (fans, passe-cables,…). –Requesting extra Ethernet connections in the BA3 Faraday Cage. –Cabling in BA3 (6 VME crates) and BA2 (1 VME crate). –Software configuration and installation.

June 27th, 2005AB/CO/HT - Review of Activities for PS-SPS 2006 Startup SPS RF FARADAY CAGE DELIVERABLES DELIVERABLEDATEPEOPLE Cable bundles (7 * 40 lemo 00 cables) readyEnd Aug. 2005Barriere/Michelon CTTM (VME opto transition module) prototype ready Mid July 2005Nouchi/Michelon/Barriere CTTM series ready (50 modules)Mid Sept. 2005Nouchi BA3 and BA2 cabling (2 weeks) readyEnd Sept. 2005Barriere/Michelon Soft declaration of all timings (CTRV outputs) ready Mid Sept. 2005Kozsar 8 VME systems ready (Wiener crate + CPU)End Aug. 2005Surback 14 new Ethernet plugs ready (BA2 and BA3)End Aug. 2005AB-RF 70 CTRV cards readyEnd. Sept 2005Alvarez/Serrano/Leroy 70 CTRV and 35 CTTM installedMid Oct. 2005Kozsar/Serrano Complete BA2 and BA3 systems tested (1 month) Mid Nov. 2005AB-CO-HT and AB-RF