RAWG Agenda Item 6 - 2015 LAR Data WECC Staff. Data Elements Generator information – Existing – Changes Monthly Peak Demand and Energy (actual year and.

Slides:



Advertisements
Similar presentations
Interchange Distribution Calculator Working Group (IDCWG) Update IDCWG October 12 th, 2011.
Advertisements

Primary Objectives of WIT
Load Responsibility in the NWPP Footprint
Interchange Authority Recommendations Board of Directors Meeting December 7, 2007.
Renewable Proposals Made at October Board. Proposal 1 Identify analyses needed to inform policy debates Coordinate WECC-wide info/analysis and coordinate.
LRS Report to PCC Wally Gibson, NWPCC Planning Coordination Committee Albuquerque, NM March 6-7, 2008.
BAL-002-WECC-1 Contingency Reserves
Renewable Proposals Made at October Board. Proposal 1 Identify analyses needed to inform policy debates Coordinate WECC-wide info/analysis and coordinate.
Loads and Resources Subcommittee Report Wally Gibson, NWPCC PCC Meeting June 10-11, 2010.
Interchange Scheduling and Accounting Subcommittee Update October 2008 Gary Nolan ISAS Vice-Chair.
Intra Hour Tagging/Oasis During System Contingencies The transmission tagging process was initially developed to solve an after the fact accounting issue.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
1 PER-005 Update Impact on Operators System Operator Conference April and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services.
Reliability Challenges White Paper Victoria L. Ravenscroft Senior Policy Analyst W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Western Regulation Usage and Pilot Program Results 1.
SRWG Update to TSS February 2015, Meeting 168 WECC HQ
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
Branden Sudduth Director, Reliability Assessment and Performance Analysis Rocky Mountain Region PA/PC Meeting March 18-19, 2014 Denver, Colorado.
Andy Meyers Interchange Scheduling and Accounting Subcommittee Chair Discussion Item: Use of Emergency eTags January 2015 Salt Lake City, UT.
NERC LTRA Update / CDR Capacity Counting Issues
Preliminary Analysis of the SEE Future Infrastructure Development Plan and REM Benefits.
ERCOT’S COMPLIANCE ASSESSMENT PROGRAM Mark Henry Compliance Manager March 23, 2005.
Electric Power Infrastructure: Status and Challenges for the Future Mark Lauby Director, Reliability Assessments and Performance Analysis.
1 The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations Phase 1 Preliminary Overall Reliability Assessment.
Generator Data Submittals 5/8/ Transmission Customer Forum Bob Jones Transmission Planning Southern Company Transmission 5/8/ Transmission.
U.S. Energy Information Administration Independent Statistics & Analysis EIA Reporting Proposal: Balancing Authority Hourly Operating Information.
ERCOT PUBLIC 4/21/ Loss of Load Probability Assessment for NERC April, 2015.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N WIAB WECC Interchange Authority Backup BY LOU MIRANDA BONNEVILLE POWER ADMINISTRATION TRANSMISSION.
1 Arizona Corporation Commission BTA Workshop Presenter: Steven Cobb May 23, 2008.
Data Coordination Working Group (DCWG) Status Report Chuck Chakravarthi Chair, DCWG April 2008.
Integration of Variable Generation Task Force Preliminary Conclusions and Actions.
1 Renewable Technology Working Group (RTWG) July 14, 2009 Henry Durrwachter.
2014 Calendar Year Customer Survey Results. Background Open for comment February 12, 2015 through March 31, 2015 for evaluation of prior year – 21 close.
Wind ELCC Calculation Comparisons and ERCOT’s NERC LTRA Capacity Forecasts GATF Meeting, June 24, 2014.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
Integration of Variable Generation Task Force (IVGTF) & Emerging Issues Mark Lauby Manager, Reliability Assessments
Reliable Power Reliable Markets Reliable People Losses and Ancillary Services: Volume Analysis 2007 Budget Review Process August 28, 2007 Operations Planning.
RELIABILITYFIRST CORPORATION Long Term Resource Assessment 2010 – 2019 Board of Directors Meeting September 30, 2010 Presented by Jeff Mitchell.
COMPLIANCE ROLLOUT Vann Weldon Compliance Training Administrator March 23, 2005 NERC FUNCTIONAL MODEL REVIEW.
©2005 PJM 1 APEx The Mature PJM Market Kenneth W. Laughlin PJM October 31, 2005 Orlando, FL.
October 29, Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job.
FERC Staff’s Report on Demand Response and Advanced Metering.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
09/17/2006 Ken Donohoo ERCOT Peak Day August Initial Settlement Data by Fuel Type.
Analysis of Demand Response Modeling in GridView Andy Satchwell and Sarah Smith Modeling Work Group December 21, 2015 The work described in this presentation.
1. Non-Dispatchable Resources and EIS Market Carrie Simpson May 30,
IRP Review  IRPs with Significant Detail on Flexibility Assessment  Portland General Electric  Puget Sound Energy  Other IRPs.
Data Coordination Working Group (DCWG). 2  Met with EIA  Discussed DCWG Scope  Reviewed Action Items from the Last Meeting  Discussed DCWG Work Plan.
Planning for Texas’ Energy Future Select Committee on Electric Generation Capacity and Environmental Effects Bob Kahn President & CEO February 6, 2008.
EGU Forecasting Tool (Data Elements) Office of Air Quality (800) John Welch Senior Environmental Manager IDEM.
TEPPC Review Task Force January 11, Purpose Advise and make recommendations on Future potential future generation and load balance Adequacy of the.
Updated Energy Year 2011 Electricity Finnish Energy Industries
Generation Adequacy Task Force Meeting April 10, 2014.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
Jagan Mandavilli Senior Reliability Engineer Texas RE NERC DERTF Update ERERERCOT WMS June 3, 2015.
Dan Beckstead Associate Staff Engineer TEPPC 2026 Common Case Load.
WECC – NERC Standards Update
Pseudo-tie business procedure
Proposed Energy Imbalance Market The Basics
Review of After-the-Fact (ATF) Tagging Criteria Scheduler’s Meeting May 24, 2016 Raymond will ask the audience what their expectations are in regard to.
Integration of Variable Generation Task Force (IVGTF) & Emerging Issues Mark Lauby Manager, Reliability Assessments
2013 Long-Term Reliability Assessment and Other Key Assessment Initiatives Briefing.
2018 WECC Loads and Resources Data Request Part 2
Review of After-the-Fact (ATF) Tagging Criteria Scheduler’s Meeting May 24, 2016 Raymond will ask the audience what their expectations are in regard to.
Steve Rueckert – Director of Standards
2018 WECC Loads and Resources Data Request Part 1
WECC – NERC Standards Update
WIAB WECC Interchange Authority Backup
Pseudo-tie business procedure
Presentation transcript:

RAWG Agenda Item LAR Data WECC Staff

Data Elements Generator information – Existing – Changes Monthly Peak Demand and Energy (actual year and 10 year forecast) – Demand-side management – Energy efficiency – Outages

Data Elements continued Actual generation by month by fuel type* Transfer path capabilities Regulating Reserves Hourly demand** Hourly Hydro production Hourly Wind production Hourly Solar production

Data Elements continued Projected Transmission Projected Transformers Protection System Operations

Data Elements - Uses NERC Reliability Assessments – LTRA, Seasonal, probabilistic, etc. Reported by NERC to EIA to satisfy form EIA- 411 filing requirements. WECC Assessments – Power Supply Assessment, State of the Interconnection, etc.

Consumption, Interchange and Generation Building energy vs. capacity profile – WECC CEO – Used in the State of the Interconnection – Contribute to the Clean Power Plan discussion – Other future assessments and reports (as outlined in the ERO delegation agreement) Looked at the WECC total as provided in the 2015 LAR data submittal – approximately 100,000 GWh difference – Investigated individual BA submittals, found differences in the majority of BA submittals – Identified calculations errors and reduced the differences to 66,000 GWh

Consumption, Interchange and Generation Accessed the WECC Interchange Tool (WIT) to resolve the differences – Still had significant GWh variances – Generated individual BA with consumption/interchange and generation calculation as supplied by LAR submittal and WIT tool.

Consumption, Interchange and Generation Received comments from many data reporters. Here is a summary of the responses – Provided updated submittals – Explained transfer differences – Confusion on what units to report in the actual generation data – Questioned use of WIT and/or number provided as WIT – Questioned need for analysis

Consumption, Interchange and Generation Data request – Assumption that total WECC prior year actual generation and consumption numbers should balance. How can we get there? BA balance, add transfer numbers to request, WECC continues to use WIT, Other?

Other LAR data request comments Other actual generation request comments Protection System Operations Retirements (confirm/ non-confirmed) Narrative request questions and comments Not enough time to respond Data request getting too large

LAR request and the MOD standards MOD-31-1 standard states, “To provide authority for applicable entities to collect Demand, energy and related data to support reliability studies and assessments….” MOD-31-1 – Requires Planning Coordinator, Transmission Planner, Balancing Authority, Resource Planner, Load-Serving Entity, Distribution Provider to collect and/or provide in part “…Total Internal Demand, Net Energy for Load, and Demand Side Management data…”

2016 LAR Action items