Program Manager Administrator

Slides:



Advertisements
Similar presentations
Public Meeting Presentation March 15, Project Location Project Purpose –Traffic reliever to I-95 –Integrate road with the Northwest Sector Plan.
Advertisements

Florida’s Turnpike Enterprise ITS Project Update
Project Overview and Status June 17, 2014 Loreen Bobo, P.E. I-4 Ultimate Construction Program Manager.
Managed Lanes Development Strategy Phase I District Four October 17, 2012.
Expanding the Potential of Tolling: A 21 st Century Look AASHTO November 18, Brian Peters Florida DOT, Assistant Secretary of Finance and Administration.
Titusville to Edgewater Bike Loop PD&E Study
Corridor-Wide Construction Presentation to FDOT Materials Lab
FDOT District 5 MAINTENANCE RESURFACING SR 100 Moody Boulevard from East of I-95 to SR A1A Ocean Shore Boulevard GENE VARANO PROJECT MANAGER 719 S. Woodland.
Construction Industry Advancement Program John T. Withers, P.E.,P.P. Supervising Engineer, Highways/Buildings - Design New Jersey Turnpike Authority Working.
S.R. 690 (118th Avenue) (C.R. 296). Agenda Introduction Alternative Analysis –Comparison of Compressed ROW and Viaduct –Why the Viaduct –Flyover Alternative.
Economic Stimulus Information Meeting March 17, 2009 Florida Department of Transportation Florida’s Turnpike Enterprise.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.
1 S.R. 426/C.R. 419 Project Update City Council Work Session November 13, 2006.
Florida Department of Transportation District One Interstate Planning for I-4 and I-75 October 30, 2012.
Lockheed Martin TLS Visitor Maps & Directions Orlando, FL
DRAFT 2009 Long Range Transportation Plan Highway Projects August 11, 2009.
River to Sea TPO May 28, 2014 River to Sea TPO May 28, “I-4 BEYOND the ULTIMATE” PD&E REEVALUATION STUDY From west of US 27 to west of Kirkman Road.
Florida Gas Transmission Mainline Hydrostatic Test From the intersection of Milam Dairy Road with NW 65 th Street to the intersection of Galloway Road.
75 Express Lanes Segments A&B Construction From NW 170 Street to South of Miramar Parkway Community Meeting Presentation Tuesday April 28, 2015.
Mario Fiorillo – Transportation – Civil Mario Fiorillo Present work experience Florida If you have any questions please me at
4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview.
ROADWAY LIGHTING PROGRAM Public Works Department February 10, 2015.
Less Stop More Go EXPRESS LANES Travel Choices and Strategies to Relieve Congestion Presentation to FDOT’s Annual ITS Working Group Meeting March 2008.
Florida Gas Transmission Mainline Hydrostatic Test From the Palmetto Expressway Interchange with Okeechobee Road to the Intersection of Milam Dairy Road.
NE 203 rd Street & NE 215 th Street Intersection Improvements between US 1 & West Dixie Highway Florida Department of TRANSPORTATION Upcoming Project Development.
FLORIDA DEPARTMENT OF TRANSPORTATION
Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.
State of the Agency Mike Snyder, P.E., Executive Director.
Current Construction Projects Major Projects Pinellas County.
Working Group Core Team Meeting II February 14, 2008.
What are Managed Lanes What are Express Lanes What are HOT Lanes Regional Express Lanes Network I-95 Express I-595 Express I-75 Express.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues.
75 Express Lanes Project From NW 170 Street to I-595 TIM Meeting Wednesday, September 2.
Florida Gas Transmission Mainline Hydrostatic Test From the Golden Glades Interchange to the interchange of NW 122 nd Street with the Palmetto Expressway.
DRAFT 1 Significant Changes for the 2006 Constrained Long-Range Plan March 3, 2006.
Tom Pierce State of Florida Department of Children and Families Office on Homelessness COSCDA Session ESG Performance Standards September 17, 2013.
Comprehensive Update on Indian Trail Infrastructure Plan September 8, 2015.
MetroPlan Orlando Board Meeting Agenda Briefing Board of County Commissioners March 10, 2015.
N. Hancock Road Traffic Signals October 14 th, 2014 Presentation Prepared By Lake County Public Works Department.
OOCEA Briefing to the Transportation Committee October 17, 2005.
PROPOSED BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 23, 2011.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2010/11 – 2014/15 Presentation to Board of County.
Transportation Improvement Program Fiscal Year Transportation Improvement Program Fiscal Year Summary of Document and Projects Advisory.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
INTERNATIONAL DRIVE CRA Modification to Community Redevelopment Plan September 1, 2009.
From US 17 to SR 11 and SR 11 to Cone Road FPID No October 25, 2011.
Interstate 95 Managed Lanes PD&E Study (95 Express) Project Development and Environment Study SE FSUTMS Users Group The Corradino Group November 2, 2007.
Transportation Projects City Council Workshop May 14, 2013.
Metro Highway Program Presentation to CMAA Abdollah Ansari
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
ASHE GOLD COAST MEETING STACY L. MILLER, P.E. DIRECTOR OF TRANSPORTATION DEVELOPMENT DISTRICT FOUR.
Polk Transportation Planning Organization 2035 Mobility Vision Plan Nov./Dec Draft Amendments to the Polk 2035 Mobility Vision Plan (MVP) Steering.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2013/14 – 2017/18 Presentation to Board of County.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2015 – 2019 Presentation to Board of County.
Asphalt Pavement Association of Indiana Annual Winter Conference Michael B. Cline Commissioner, INDOT December 14, 2010.
CENTRAL FLORIDA EXPRESSWAY AUTHORITY FY Five Year Work Plan December 10, 2015 Presented by: Jeanette Maldonado-Ambler, PE Atkins.
Visit Our Website at: Click to edit Master title style.
The Gainesville Area Chamber Infrastructure Investment Initiative
SR 417 Extension Sketch-Level Traffic & Revenue Evaluation
PROJECT INFORMATION SESSION Small Business Enterprise
Regional Roads Committee
SR 417 Extension Sketch-Level Traffic & Revenue Evaluation
Florida Transportation Commission FY 2009
Tampa Bay Regional Strategic Freight Plan
FLORIDA DEPARTMENT OF TRANSPORTATION
Volusia TPO Board Meeting January 22, 2013
Lyle Parkway to SR 540 (Winter Lake Road)
Contract 60X10 Informational Meeting Weber I-55
Presentation transcript:

Program Manager Administrator Florida Department of TRANSPORTATION Florida’s Turnpike Enterprise TENTATIVE Work Program Summary (FY 17-21) Paul Satchfield Program Manager Administrator December 10, 2015

Tentative Construction Fiscal Years 2016/17 – 2020/21 Florida Department of TRANSPORTATION Tentative Construction Fiscal Years 2016/17 – 2020/21

Florida Department of Transportation Tentative Product Support Fiscal Years 2016/17 – 2020/21 Florida Department of Transportation

Florida Department of Transportation FY 17 Consultant Acquisition Plan Ad # Project # BDI (Y / N) Description Project Type County PM Planned Ad Formal Ad Shortlist Date Final Selection Date 1 17810 437371-1   ALTERNATIVE CORRIDOR EVALUATION (ACE) CONSULTANT ACQUISITION DESIGN STATEWIDE Bolan 12/7/2015 1/25/2016 3/15/2016 5/10/2016 2 17807 436517-1 Y RESURFACE TPK MAINLINE IN ST. LUCIE COUNTY, MP 153.23-169.32 STL Soldati 2/22/2016 4/8/2016 6/13/2016 3 17811 437988-1 RESURFACE MAINLINE LAKE COUNTY MP 287.761 TO 288.748 (NB AND SB) AND 288.748 TO 297.870 (NB ONLY) LAKE Hinson 4/18/2016 5/2/2016 8/8/2016 4 17808 436520-1 RESURFACE POLK PKWY, MP 0.00 - 8.00 POLK 3/7/2016 4/4/2016 5/23/2016 7/18/2016 5 17801 423374-1 PD&E MAINLINE WIDENING JUPITER TO FT PIERCE (MP 116 to 152) PD&E MARTIN/STL Zornek 5/30/2016 9/19/2016 6 17804 437952-1 WIDEN SEMINOLE XWAY, SR434 TO N OF CR427 (MP44-49.4) (4TO8 LNS W EXP) PD&E/DESIGN SEMINOLE Ambare 6/20/2016 10/10/2016 7 17809 415748-1 WIDEN TPK FROM SR710 (MP 106.1) TO MP 117 (4 TO 8 LNS) PALM BEACH TBD 6/6/2016 7/5/2016 8/22/2016 10/24/2016 8 17802 438547-1 ORLANDO SOUTH ULTIMATE INTERCHANGE IMPROVEMENTS ORANGE Nagot 8/1/2016 11/21/2016 9 17812 437992-1 RESURFACE MAINLINE MARTIN COUNTY (MP 117.8 TO 138.10) MARTIN 8/15/2016 10/3/2016 12/12/2016 10 17803 437206-1 HEFT US1 EXIT RAMP MODIFICATION LOOP RAMP TO THE NW (MP 0) MIAMI-DADE 11 17806 435786-1 WIDEN TPK- MINNEOLA INTCHG TO LEESBURG NORTH INTCHG (MP 279 - 289.3) 7/25/2016 12/19/2016 Florida Department of Transportation

Florida Department of Transportation Additional FY 17 Consultant Acquisitions District-Wide Design Services Continuing Services Contracts: Materials Testing and Geotechnical Services Landscape Design Design Build Request for Proposal (RFP) Development Miscellaneous Design Contracts: One advertisement, two (2) consultants selected Florida Department of Transportation

Florida Department of Transportation TENTATIVE FY 18 Design (PH 32) Projects FPID AD # / CONTRACT # DESCRIPTION PH 431737-1   AET PHASE 8 TICKET SYSTEM (MP 88 -MP 236) 32 435787-1 WIDEN TPK- LEESBURG NORTH INTCHG TO LAKE/SUMT ER C/L (MP 289.3 - 297.9) 435788-1 WIDEN TPK FROM LAKE/ SUMTER C/L TO CR 468 INTCHG (MP 297.9 - 301.4) 437953-1 WIDEN SEMINOLE EXPRESSWAY FROM CR427 TO RINEHART ROAD (MP 49 TO MP 54) 437986-1 RESURFACING MAINLINE ST. LUCIE COUNTY MP 138.130 TO MP 153.230 437987-1 RESURFACING MAINLINE ORANGE COUNTY MP 255.499 TO MP 259.402 437991-1 Amendment RESURFACE TPK MAINLINE IN PALM BEACH CNTY,MP 81.4-83.822 & 86.5-90.183 438019-1 Misc Design HEFT BRIDGE PAINTING FOR SR 821 RAMP OVER US 1 & SR821 N/B OVER SR874 XXXXXX-X SPUR WIDENING HEFT (NW 41ST ST 114TH AVE - TURN LANE) Florida Department of Transportation

Florida Department of Transportation Major Projects: South Florida – Broward & Miami-Dade SR 821 (HEFT) Widening with Express Lanes SR 836 to Miramar Toll Plaza (20 Miles) FYs 2017 & 2018 Sawgrass Expressway Widening with Express Lanes Sunrise to Powerline Rd (21.5 Miles) FYs 2019, 2020 & 2021 Mainline Widening with Express Lanes Atlantic Blvd to Wiles Rd (4 Miles) FY 2019 Sawgrass to Palm Beach County Line (2 Miles) FY 2021* *Continues as projects in Palm Beach County Florida Department of Transportation

TRANSPORTATION Florida Department of Major Projects: South Florida – Palm Beach Mainline Widening with Express Lanes Palm Beach / Broward County Line to Lake Worth Road (17 Miles) FY 2018, 2020 & 2021* *Continuation of project in Broward County starting at Sawgrass Expressway 17 Miles of Express Lanes in Palm Beach County Florida Department of Transportation

TRANSPORTATION Florida Department of Major Projects: Central Florida – Polk and Lake Mainline - Widening with Express Lanes Lake/Orange County Line to Minneola (5 Miles) FY 2021* Test Facility Florida Polytech Adjacent to Polk Parkway FY 2017 Polk Parkway Widening Dixie Highway to South of Pace Road (4 Miles) FY 2018 *Continues as project in Lake County 5 Miles of Express Lanes in Lake County Florida Department of Transportation

TRANSPORTATION Florida Department of Major Projects: Central Florida – Orange and Osceola Mainline Widening with Express Lanes US 192/441 to Beachline (SR 528) (13 Miles) FY 2017 & 2019 SR 50/Clermont to Orange/Lake County Line (1 Mile) FY 2021* Mainline Interchanges: New Interchange at Sand Lake Road (MP 257) FY 2021 Direct Connect Ramps to I-4 Express Lanes (MP 259) FY 2018 *Continuation of project in Lake County starting at Minneola 14 Miles of Express Lanes in Orange and Osceola Counties Florida Department of Transportation

Florida Department of Transportation Major Projects: PD&E and Design Mainline Widening with Express Lanes PD&E Re-evaluation - SR 710 to Jupiter, 11 miles in Palm Beach County, FY 2017 PD&E - Jupiter to Ft. Pierce, 36 miles in Martin County and St. Lucie County, FY 2017 PD&E - Orlando South Ultimate Interchange Improvement (SR 528 at Mainline), Orange County, FY 2017 Seminole Expressway Widening with Express Lanes PD&E and Design - SR 434 to CR 427, 5 Miles in Seminole County, FY 2017 SR 821 (HEFT) Design - Improve Interchange at Hainlin Mills Road (SW 216th St - MP 11), FY 2017 PD&E – Improve Interchange at US 1 (MP 0), FY 2017 Florida Department of Transportation

Florida Department of Transportation Useful Links: Florida’s Turnpike Enterprise (FTE): http://www.floridasturnpike.com/index.cfm FTE’s Consultant Acquisition Plan: http://www.dot.state.fl.us/procurement/CAP.shtm FTE’s Work Program Utility: http://www.floridasturnpike.com/workprogram/index.html Florida Department of Transportation

TRANSPORTATION Paul Satchfield Florida Department of FTE Program Management Administrator Paul.Satchfield@dot.state.fl.us 407.264.3458 Florida Department of Transportation