PDCWG Report to ROS March 11, 2010 Sydney Niemeyer.

Slides:



Advertisements
Similar presentations
PJM© PJM DOCs # Frequency Response Drafting Team Frequency Response Background Frequency Response Standard History Briefing on Frequency Response.
Advertisements

BAL-001-TRE-1 Primary Frequency Response Update for Texas RE RSC
January 9, 2013 BAL-001-TRE-1 Primary Frequency Response Update for Texas RE RSC.
January 6. January 7 January 8 January 9 January 10.
Don Blackburn Vice Chair
Bob Green Garland Power and Light
Chubaka Producciones Presenta :.
PRESENTATION FREQUENCY CONTROL
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
Joint Grid Code Review Panel POR Working Group Meeting 2 27 th March 2015 Chairperson : Michael Preston.
Governor Response Sequence Bob Green Garland Power and Light ERCOT Future AS Workshop January 20, 2014.
Frequency Control Turbine Governor Droop NERC Requirement
PDCWG Report to ROS August 12, 2010 Sydney Niemeyer.
Frequency Response Initiative Robert W. Cummings Director of System Analysis and Reliability Initiatives NERC Standing Committees September 14-15, 2010.
RTWG Report to TAC August 5, 2010 Howard Daniels.
BAL-001-TRE-1 Primary Frequency Response in the ERCOT Region
Comparison of Governor Deadband & Droop Settings of a Single 600 MW Unit A Hz Deadband with a Straight Line Proportional 5% Droop Curve Compared.
July 2008 CPS2 Waiver SDT Technical Workshop for Draft BAL-001-TRE-01 Judith A. James Reliability Standards Manager TRE.
February 26, 2013 Board of Directors Meeting 2012 ERCOT Region Reliability Update.
Frequency Response Standard. ERCOT Governor Droop.
1 Compliance Update May Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
WGR Ramp Rate in Nodal: “As High as Possible” Mike Grimes for QMWG Meeting 10 August 2009.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
Wind Generator Inertia and Governor Response Report PDCWG Assignment in response to EECP Step #2 on February 26, ROS Action Plan Item 1e.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Analysis of ERCOT Regulation Service Deployments during 2011 David Maggio Market Enhancement Task Force Meeting 3/29/
1 PDCWG Report to ROS October 13, 2011 Sydney Niemeyer.
Unit-Specific Bid Limits based on Modified Generic Cost.
PDCWG Report to ROS January 14, 2010 Sydney Niemeyer.
PDCWG Report to ROS David Kee Chair CPS Energy Sydney Niemeyer Vice Chair NRG Energy.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) August 8, 2012 PDCWG August 9, 2012 ETWG/QMWG.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
SunSatFriThursWedTuesMon January
Resource Parameters Needed for LFC NATF WebEx Meeting 05/11/2010 Dave Maggio Operations Engineer, Supply Integration and Grid Applications.
GENERAL BACKGROUND AND SPEED GOVERNORS
BAL-001-TRE-01 ERCOT CPS2 R2 Waiver Regional Variance April 16, 2009 Sydney Niemeyer.
PDCWG Report to ROS Sydney Niemeyer Chair NRG Energy Don Blackburn Vice Chair Luminant Energy.
Final Report on ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) PDCWG March 26th, 2014.
Improving Primary Frequency Response Bob Green PDCWG August 3, 2011.
Responsive Reserve Service Deliverability Review September 15,
Frequency Control Task Force Presentation to the ERCOT Technical Advisory Committee June 1, 2006.
1 Cutover Daily Call 10:30 AM November 23, :30.
PDCWG Report to ROS January 13, 2011 Sydney Niemeyer.
ERCOT DYNAMICS WORKING GROUP Report to ROS August 16, 2007 Vance Beauregard, American Electric Power.
Droop Calculator and Unit Performance Evaluation SAR-003-TRE-001 March 31, 2009 Sydney Niemeyer.
PRR 525 Update Prepared by ERCOT Compliance December 2005.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
1 Frequency Control Task Force Report to WMS July 19 th, 2006.
BAL-001-TRE-1 CPS2 Waiver FERC-Ordered Modification to ERCOT waiver CPS2 Report to RSC December 16, 2008.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) June 13, 2012 WMS and June 14, 2012 ROS.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) PDCWG April 26, 2013.
ECE 576 – Power System Dynamics and Stability Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
PDCWG Report to ROS October 16, 2008 Bob Green PDCWG Chair Garland Power & Light.
1 Compliance Update May Control Performance Highlights  NERC CPS1 Performance April Performance  April performance comparison April 2007:
Renewable Technology Working Group (RTWG) Report to TAC February 4, 2010 Henry Durrwachter.
Compliance Report to ERCOT BOD December 2006
Verifiable Cost Working Group (VCWG) Update
David Kee Chair CPS Energy Sydney Niemeyer Vice Chair NRG Energy
Compliance Report to ERCOT TAC February 2007
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
2300 (11PM) September 21 Blue line is meridian..
McDonald’s calendar 2007.
McDonald’s calendar 2007.
2015 January February March April May June July August September
Presentation transcript:

PDCWG Report to ROS March 11, 2010 Sydney Niemeyer

PDCWG Activities Will meet March 10. –Review February and remaining January disturbances. –Operating Guide and Protocol synchronization. –Review and prepare report on Wind Event January 28, –PRR833 Primary Frequency Response Requirement from Existing WGRs. – Submitted recommendation to the ROS. –Updated Scope. Next meeting April 7.

CPS1 = * *Unofficial score.

* *

*

of ERCOT Frequency January 28, 2010 June 1, 2004 April 17, 2006

February 18, 2010

ERCOT CPS1 Score CPS1 12 Month Rolling Average = * *Unofficial score

*ERCOT as a single control area is exempt from CPS2. These scores are For Information Only 90.60

Comparison of Governor Deadband & Droop Settings of a Single 600 MW Unit A Hz Deadband with a Straight Line Proportional 5% Droop Curve Compared to a Hz Deadband with a “Step” Straight Line Proportional 5% Droop Curve from the Deadband. Sydney Niemeyer – February 9, 2010

Governor Settings Prior to November Had Ten Months of Operation with no Governor setting changes. –ERCOT Operating Guides called for a maximum +/ Hz deadband on Governors. –5% Droop Setting with no clarification as to implementation. With or without a step function at the deadband. –To meet the 5% droop performance, Governors were encouraged to “step” into the 5% droop curve at the deadband.

Governor Settings After November 3, 2008 Deadbands were decreased to +/ Hz (1 rpm on a 3600 rpm turbine). The Droop curve implemented was a straight line proportional curve from the deadband eliminating any “step” function. Initially only 4 Unit’s Governors were changed. Total Capacity of 2486 MW or approximately 82.8 MW/0.1 Hz of Primary Frequency Response. The coordinated Boiler Control System implemented the same Droop curve and deadband as the turbine Governor. Additional Units changed their Governor settings throughout 2009 and 2010, mostly after July 2009.

Status as of March 1, 2010 Units with Governors presently set with an intentional deadband less than or equal to +/ Hz and droop curve with no step function. –11,767 MW Total Capacity Identified by PDCWG members MW Lignite 4139 MW Coal 3780 MW Combustion Turbine Combined Cycle 1519 MW Combustion Turbine Simple Cycle 399 MW Steam Turbine – natural gas fired 240 MW Hydro

MW-Minute Primary Frequency Response of a 600 MW Unit To All Frequency Deviations During The First 10 Months of 2008 Minute This compares the difference a single 600 MW unit would have experienced as a result of Primary Frequency Response if on-line the first 10 months of 2008 and had margin to move.

MW-Minute Primary Frequency Response of a 600 MW Unit To All Frequency Deviations in 2008 Minute This compares the difference a single 600 MW unit would have experienced as a result of Primary Frequency Response if on-line all of 2008 and had margin to move.

However, the MW Response of the db unit is only MW more than the 2008 MW Response of the db unit ( MW). A 4.45% increase with the benefit of the improved frequency profile. The MW response of the db unit decreased MW in 2009 from This is a % decrease in movement. MW-Minute Primary Frequency Response of a 600 MW Unit To All Frequency Deviations in 2009 Minute The MW response of the db unit decreased MW in 2009 from This is a % decrease in movement.

2009 Frequency Profile more “Normal” than Note: 2008 had two months of operation at the lower governor deadband settings (Nov & Dec). ERCOT Frequency Profile 2008 and 2009

ERCOT Frequency Profile Had Additional Improvement in December 2009 and January 2010

MW-Minute Primary Frequency Response of a 600 MW Unit To All Frequency Deviations During January 2010

Conclusions Clearly the MW-Minute Movement of a Unit with a lower deadband setting is more than that of a larger deadband. The MW-Minute movement of the lower deadband has a gradual injection of Primary Frequency Response compared to the “step” implementation of the larger deadband. –Better Unit stability –Better Frequency stability As more Units implement the lower deadband and non- ”step” droop curve, the frequency profile improves and the total MW-Minute movement of the grid decreases.