Western Area Power Administration Transmission Customer Meeting October 17, 2007.

Slides:



Advertisements
Similar presentations
The Midwest ISO from a Transmission Owner Perspective.
Advertisements

Western Electricity Coordinating Council Status of NERC Standards Activity WECC PCC Meeting March 6-7, 2008.
Trading & Settlement Code modification Mod 21 / 12 Amendment to Available Transfer Capacity (ATC) definition.
NREL Wind Integration Workshop By Electric Power Systems, Inc. June 28-29, 2010.
MARKET INTERFACE COMMITTEE OC and PCC Approval Items March 6-7, 2008 Albuquerque, New Mexico.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
Public Service Company of New Mexico
Reliability Software1 Reliability Software Minimum requirements & Best practices Frank Macedo - FERC Technical Conference July 14, 2004.
9/22/00 1 Jerry W. Smith. 9/22/00 2 Jerry W. Smith.
1 The Midwest ISO At the Crossroads of America International Meeting of Very Large Power Grid Operators October 24 & 25, 2005 Beijing, China.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
Tucson Area Reliability Mike Flores Control Area Operations Tucson Electric Power May 2000.
Announcements Be reading Chapter 6, also Chapter 2.4 (Network Equations). HW 5 is 2.38, 6.9, 6.18, 6.30, 6.34, 6.38; do by October 6 but does not need.
System Operator Conference NERC Standards Review for: Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS.
Available Transfer Capability Determination Chen-Ching Liu and Guang Li University of Washington Third NSF Workshop on US-Africa Research and Education.
ECE 530 – Analysis Techniques for Large-Scale Electrical Systems
1 If I were to give grades today… > 80A A B B B C C C D D D-1
Determine Facility Ratings, SOLs and Transfer Capabilities Paul Johnson Chair of the Determine Facility Ratings Standard Drafting Team An Overview of the.
ERCOT SOL Methodology for the Planning and Operations Horizons Stephen Solis 2014 OTS 1.
ERCOT PUBLIC 4/21/ Loss of Load Probability Assessment for NERC April, 2015.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
Project WECC-0100 Update Reliability Subcommittee February 2014.
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
Duke Energy Carolinas Quarterly Stakeholder Meeting Independent Entity Services Thursday, December 2, :00 to 3:00 p.m. EDT.
Roadmap for Real Time Control Transmission Reliability Program Peer Review Washington DC, 27 January 2004 Jeff Dagle, Pacific Northwest National Laboratory.
OSC Meeting April 27, Transmission Cost Allocation Overview.
1 TRANSMISSION SYSTEM OVERVIEW NETWORK OPERATING COMMITTEE April 17, 2007 New Mexico Transmission System Overview.
ATC/TTC Basics Transmission Customer Forum Doug McLaughlin 9/22/06 Transmission Customer Forum Doug McLaughlin 9/22/06.
Bulk Power Transmission System
ERCOT Planning WMS 10/20/2010 Target Reserve Margin and Effective Load Carrying Capability of Installed Wind Capacity for the ERCOT System – Methodology.
ERCOT PUBLIC 4/21/ RTP: Cascade Analysis April 21, 2015.
Transmission Equivalence Richard V. Kowalski Manager, Transmission Planning ISO New England.
AFC METHODOLOGY EMS USER GROUP SEP 12, 2004 AFC – New Developments EMS USER GROUP Sep
Arizona Corporation Commission Power Plant & Transmission Siting Summary ACC Staff Presentation October 30,
Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX.
October 6, 2006 Public Stakeholder Review Portland, Oregon Conditional Firm.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
ABT / IEGC CLAUSES While making or revising their declaration of capability, the generator shall ensure that their declared capability during peak hours.
New Opportunities for Control and Optimization in the Future Power Industry Environment Chen-Ching Liu University of Washington.
PS ERC 1 Reactive Power Considerations in Linear Load Flow with Applications to Available Transfer Capability Pete Sauer (With a lot of help from Santiago.
Congestion regulations. Definitions and Interpretation “Available Transfer Capability (ATC)” means the transfer capability of the inter- control area.
Operating Guide and Planning Guide Revision Requests Blake Williams, ROS Chair September 13, 2012.
Duke Energy Carolinas Transition to AFC Methodology Stakeholder Meeting Independent Entity Services Thursday, March 17, :00 to 3:00 p.m. EDT.
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
Current Operational Challenges Computing the West – North Limits Potential IROLs Local Voltage & Thermal issue (OOME) High Voltage Outages.
RAWG Agenda Item LAR Data WECC Staff. Data Elements Generator information – Existing – Changes Monthly Peak Demand and Energy (actual year and.
Coordinated Planning Concept (For Discussion Only) revised 11/30/04 07/01/04.
ECE 530 – Analysis Techniques for Large-Scale Electrical Systems Prof. Hao Zhu Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
A new Nomogram Development POM- based tool - Application results in the Idaho Power System. Orlando Ciniglio, IPC Marianna Vaiman, V&R Energy WECC TSS.
Capacity, Demand and Reserves Report Bill Bojorquez Board of Directors Meeting May 16, 2007.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
THE POWER OF POSSIBILITY AESO current limits for Alberta-BC transfers Jeff Palermo – KEMA/AESO.
Dynamic Transfer Limits Study WIST Update 12/17/09 Brian Tuck, BPA.
Reliability Subcommittee Report Vishal C. Patel (RS Chair) PCC Meeting La Jolla, CA- March 22, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
1 NPCC – A-2 Dr. Mayer Sasson Transmission Planning Consolidated Edison of New York June 1, 2006 Presented to the NYSRC-RRS.
Local Area Planning Update – TRANSAC Base Case Status Base case study models representing the base scenarios will be completed as follows for.
EE590 Transmission Planning Projects and Cost Allocation Ming NI Economic Studies, Midwest ISO.
Project WECC-0100 Standards Briefing WECC-0100 SDT April 7, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
DEREGULATED POWER SYSTEM MARKET
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Columbia Grid Wind Integration Study Team Dynamic Transfer Capability Studies Update 9/10/09.
Path Operator Implementation Task Force
Updates to the Path Rating Process for Approval by the PCC
Congestion regulations
Project WECC-0100 Update Load Modeling Task Force
ECEN 615 Methods of Electric Power Systems Analysis
Palo Verde-COI RAS Retirement
Project WECC-0100 Update Load Modeling Task Force
Palo Verde-COI RAS Retirement
Presentation transcript:

Western Area Power Administration Transmission Customer Meeting October 17, 2007

Western Area Power Administration AGENDA: POWER OPERATIONS UPDATE General Update 890 Filing Darren Buck, Power Operations Manager ATC Calculations Mariam Mirzadeh, Transmission Planning Engr. Rates Update Sean Sanderson, Rates Manager

Physics of Disturbances Thermal Overloads Voltage Limits System Stability Transient Voltages Frequency Limits Damping VARs and Voltage Stability Remedial Action Schemes System Synergy Islanding Cascading Western Area Power Administration

Transfer Capability Limit Criteria Total Transfer Capability (TTC) Maximum amount of power that can be transferred across an interconnection or a transfer path from one control area to another or within an area while ensuring that the transmission system is able to suffer and recover from a severe outage (meeting the NERC/WECC reliability criteria). Net schedules shall not exceed TTC TTC & ATC are directional Operating Limits No element shall be scheduled above it’s continuous operating limits Western Area Power Administration

Stability Following an Outage N-1s shall not cause cascading System Response to Contingencies Prior to Readjustment (Transient period) Voltages and element loading shall meet the WECC/NERC corresponding criteria, loading shall not exceed emergency ratings Western Area Power Administration Transfer Capability Limit Criteria Cont’d

Available Transfer Capability (ATC) – OATT & Mandatory Reliability Requirements

Western Area Power Administration ATC = TTC (allocated to Western) – Committed Uses Where Committed Uses = Existing Transmission Commitments + Transmission Reliability Margin (TRM) + Capacity Benefit Margin (CBM) TRM Includes: Unscheduled Flow (Loop Flow) Accommodation for any simultaneous limitations associated with operation under a nomogram & Uncertainty in load forecasting – regulation, etc.

CBM Includes: Capacity for movement of water in order to meet Bureau of Reclamation/Corp of Engineers water schedules, or for moving generation under black starts conditions. All transmission (PACI, COTP, network and P-P) reservations are subject to real-time operation operating limitations especially the Sacramento area simultaneous import Nomogram. Western Area Power Administration

CVP Network transmission ATC calculation methodology, SNR business practice # 20: _BP-20_V_01_ pdf OATT: ercopy_(11_05).pdf Rates:

Questions/Discussion Western Area Power Administration